SLOPSHOPPER

agent-tree

Side pane that shows running subagents and workflows as a live tree

panerowsguardcommandtoastprompt
v0.1.0MITupdated 2026-10-21SeanoChang/agent-tree
A shopper browsing a rack in a slop shop
Preview · a replayed session in a sandbox
claude · ~/work/app · agent-tree
│ ┃ Agents ✕ › fix the failing auth test and add an audit log call │ ┃ ▣ client module ./view.tsx │ ⏺ Read(src/auth.ts) │ ⎿ Read 6 lines │ ⏺ Update(src/auth.ts) │ ⎿ Added 2 lines, removed 1 line │ ⏺ Bash(bun test) │ ⎿ 3 pass, 1 fail │ │ ● Done. refresh now rejects expired claims and logs an audit event. │ │ ✻ Worked for 42s · done 4:20 PM │ │ › /agent-tree │ ⎿ agent-tree: Agents pane opened. Click it; ? shows the keys. │ │ ────────────────────────────────────────────────────────────────────────────────────────────────────────────────────── › ? for shortcuts

Draws

Pane · Agents
▣ client module ./view.tsx
README

agent-tree

A side pane for Claude Code that shows your subagents and workflows as a live tree. You see who is running, what each agent is doing now, how long it took and how many tokens it used. When a run ends, it moves to History, where you can replay it as a timeline or a trace.

agent-tree: three Explore agents run in parallel, then the run opens in History as a trace and a report

Install

Type this at the Claude Code prompt:

/plugin install agent-tree --marketplace SeanoChang/agent-tree

Answer y to add the marketplace, then pick a scope (user scope loads it in every session). The pane is active at once; no restart is needed.

Open the pane with /agent-tree. It also opens by itself when a subagent starts and the terminal is at least 144 columns wide.

Needs: a Claude Code build that runs function-hook mods (tested on 2.1.292). Optional: rsvg-convert (brew install librsvg) to save PNG pictures.

What it shows

ViewWhat you get
TreeEach run with its agents nested under it: status, the current step, model, tokens and time
TimelineOne bar per agent. The critical path (the chain of agents that set the end time) is heavy, and dots mark idle time
TraceOne lane per agent, with every tool call, edit and hand-back in order. Search it with /, jump between problems with n p
BoardAgents grouped by status
HistoryThe last 150 runs across sessions, per repo, with a short report for each

More:

  • Compare runs. Press m on two runs, or = to compare a run with its last run of the same work. You see time, idle time, tokens by model, failures, tool calls and the files each run changed.
  • Insights. One-line notes flag what needs a look: failed agents, an agent that made no tool call for a while, two agents that edited the same file, a workflow phase that took most of the time, and the agent that used the most tokens.
  • Export. x saves the open Timeline or Trace as SVG (and PNG) in ~/Downloads/agent-tree/.
  • Desktop app. The pane has a native view for the Code tab in the Claude desktop app.

An exported timeline: the critical path is outlined

Keys

Click the pane (or press ctrl+x tab) to give it the keyboard. ? lists every key.

Arrows move inside one zone at a time, like a TV remote. In the content, ↑ ↓ move and ← → fold. To switch a tab or a view, press ↑ on the top row to reach the bar, then ← →. Direct keys work from anywhere: 1 2 for Live and History, v for the next view, ? for help.

Settings

Run /plugin, pick agent-tree, and set:

OptionValuesDefault
thememinimal (plain glyphs, any terminal), kitty, fish, dog (colours and emoji)minimal
aioff (no model calls), cheap (Haiku writes run reports and titles), full (also Sonnet on demand: e explains a run, g finds patterns in History)cheap

The cheap and full modes make model calls on your account. Set ai to off if you do not want that.

How it works

The mod listens to Claude Code's hook events (agent spawn, tool calls, turn end) and keeps live runs in session state and History in the plugin store. It reads subagent transcripts only when you open a trace. See docs/ARCHITECTURE.md for the data flow and the key map.

Develop

git clone https://github.com/SeanoChang/agent-tree && cd agent-tree
claude --plugin-dir .          # run it from the folder
claude plugin validate .
claude plugin test .

Feedback

Issues and ideas are welcome: open an issue or a discussion. A screenshot of the pane helps most.

License

MIT. See LICENSE.

Source 16 files
hooks/register.tsx 1293 lines
1import { atom, read, update } from 'claude-code'
2import type { EngineInterface as Engine, Register, Timer } from 'claude-code'
3
4import type { AgentNode, EditRecord, NodeStatus, PatternsDoc, Report, TraceRow, TraceView, TraceZoom, ViewProps } from '../types'
5import { themeNameOf, themeOf, type ThemeName } from './theme'
6import {
7  changesLine, cleanTitle, describeTool, diffCounts, editRecords, editedPath, fileRows, firstPrompt, firstSentence, handbackOf, fitView,
8  lineDiff, parseJournal, pipeline, scopeNodes, transcriptEdits, folderKey, runKey,
9} from './list'
10import { PART_TOKENS, REPORT_SYSTEM, REPORT_TOKENS, isRawReport, kTokens, parseReport, partInput, runInput } from './report'
11import { ZOOMS, buildTrace, finishParse, newParse, onlyLane, parseLines, traceHits, traceMarks, traceWindow, type TraceEvent } from './trace'
12import {
13  AI_MODES, EXPLAIN_SYSTEM, PATTERNS_SYSTEM, STORY_SYSTEM, TIER_NAME, aiAllows, explainInput, parseBrief, parsePatterns,
14  parseStory, patternsInput, storyInput, type AiMode, type Tier,
15} from './ai'
16import { criticalPath, idleGaps, insights, timelineRows } from './lens'
17import { DESK, pictureSvg, timelineHeight, timelineSvg, traceSvg, type TimeBar } from './desktop/svg'
18// phase 6: the desktop's own native view, drawn from the same data
19import { drawDesktop } from './desktop/pane'
20import { DESK_DEFAULT, deskUi } from './desktop/state'
21
22const PANE = 'agent-tree'
23// Bumped when the view module's props or state change shape: a new key mounts a
24// fresh instance, where the old one would carry its state into the new code.
25const VIEW_KEY = 'tree-v7'
26// A view that failed (one draw over its budget, a throw) is not drawn again under
27// its key, so each failure moves it to a new key: at most FAULT_RETRIES in
28// FAULT_WINDOW, after which it waits for a reload as before.
29const FAULT_RETRIES = 3
30const FAULT_WINDOW = 10 * 60_000
31let viewGen = 0
32let faultsAt: number[] = []
33const viewKey = () => (viewGen ? `${VIEW_KEY}-${viewGen}` : VIEW_KEY)
34const TITLE = 'Agents'
35const HISTORY = 'history'
36const HISTORY_RUNS = 150
37const nodes = atom({ plugin: 'agent-tree', key: 'nodes' } as const, [])
38const edits = atom({ plugin: 'agent-tree', key: 'edits' } as const, [])
39// The last wheel move over the pane, which the view applies once per seq.
40const wheel = atom({ plugin: 'agent-tree', key: 'wheel' } as const, { seq: 0, by: 0 })
41// The look chosen in /config, read from the options at each load.
42let themeName: ThemeName = 'minimal'
43// What the AI layer may do, from /config: off, cheap (Haiku) or full (Haiku, and Sonnet on demand).
44let aiMode: AiMode = 'cheap'
45// A new seq redraws the pane after an AI block was written where the view does not subscribe (the store).
46const aiSeq = atom({ plugin: 'agent-tree', key: 'ai' } as const, { seq: 0 })
47// Runs whose brief Sonnet is writing, whether patterns are being written, agents whose story is.
48const explaining = new Set<string>()
49let patternsBusy = false
50const storying = new Set<string>()
51const AI_SPEND = 'aiSpend'
52const PATTERNS = 'patterns'
53const WEEK = 7 * 86_400_000
54const EDITS = 'edits'
55const EDITS_KEPT = 400
56const EDIT_TEXT = 6000
57// The file the Changes view has open: only its edits travel to the view.
58let diffPath: string | null = null
59// where this session keeps subagent transcripts, learned from a Stop event or a workflow's folder
60let subagentsDir: string | undefined
61const backfilled = new Set<string>()
62
63// ── the trace the view has open ─────────────────────────────────────────────
64// What the view asked for: which run, how close, and where it reads.
65// `lane` cuts the rows to one agent's lane; `query` is a search the rows are matched against.
66let traceReq: { run: string; zoom: TraceZoom; offset: number; lane?: string; query?: string } | null = null
67// The run's trace as last built (all its rows), and the window the view gets.
68let traceBuilt: { key: string; at: number; lanes: TraceView['lanes']; rows: TraceRow[]; missing: number; storyBy?: string } | undefined
69let traceSnap: TraceView | undefined
70let tracer: Timer | undefined
71// A new seq redraws the pane after the trace was read again.
72const traceSeq = atom({ plugin: 'agent-tree', key: 'trace' } as const, { seq: 0 })
73// phase 6: what the desktop view has open (its tab, run, item, view, filters)
74const desk = atom({ plugin: 'agent-tree', key: 'desk' } as const, DESK_DEFAULT)
75// Each transcript's events, kept while its file does not change; a running agent's
76// file is read again at most every few seconds.
77const transcripts = new Map<string, { size: number; mtimeMs: number; checkedAt: number; events: TraceEvent[] }>()
78// Where each agent's transcript is: a path, or null once looked for and not found.
79const transcriptAt = new Map<string, string | null>()
80// $.fs.read takes files up to 4 MiB; bigger ones are read in 3 MiB pieces with dd.
81const READ_CAP = 3 * 1024 * 1024
82const DD_BLOCK = 65_536
83const DD_BLOCKS = READ_CAP / DD_BLOCK
84const TRACE_WINDOW = 60
85const TRACE_TEXT = 120
86
87// Agent tool calls seen in any loop. A spawn whose tool_use_id is not here
88// came from somewhere else (a workflow run), so it is filed under that run.
89const agentCalls = new Set<string>()
90// Each Agent call's `isolation`, read when its spawn arrives.
91const isolationOf = new Map<string, 'worktree' | 'remote'>()
92const digesting = new Set<string>()
93// Each finished run's whole answer, held until its report is written: the node
94// keeps only its start, and a report read from that start calls the work unfinished.
95const answers = new Map<string, string>()
96const ANSWERS_HELD = 50
97const holdAnswer = (id: string, text: string | undefined) => {
98  if (!text) return
99  answers.delete(id)
100  answers.set(id, text)
101  for (const old of answers.keys()) { if (answers.size <= ANSWERS_HELD) break; answers.delete(old) }
102}
103let reconciler: Timer | undefined
104let poller: Timer | undefined
105const titling = new Set<string>()
106// The main loop's current turn, from the last prompt it took: its subagents form one group.
107let turn: string | undefined
108const TITLE_CONCURRENCY = 4
109
110const AGENT_TOOLS = new Set(['Agent', 'Task'])
111const excerpt = (s: string | undefined, n = 400) => (s ? s.slice(0, n) : undefined)
112// A node's kept answer: its start, and its whole length when that start is all it keeps.
113// An empty answer keeps what the node had; a new answer drops an old length.
114const withResult = (n: AgentNode, s: string | undefined, cap = 400): AgentNode => {
115  if (!s) return n
116  const { resultLength: _old, ...rest } = n
117  return { ...rest, result: s.slice(0, cap), ...(s.length > cap ? { resultLength: s.length } : {}) }
118}
119const scriptField = (script: string | undefined, field: string) =>
120  new RegExp(`${field}:\\s*['"]([^'"]+)['"]`).exec(script ?? '')?.[1]
121
122const runningWorkflow = (list: AgentNode[]) =>
123  [...list].reverse().find(n => n.kind === 'workflow' && n.status === 'running')
124
125const patch = ($: Engine, id: string, fn: (n: AgentNode) => AgentNode) =>
126  update($, nodes, list => list.map(n => (n.id === id ? fn(n) : n)))
127
128const finish = (status: NodeStatus, at: number) => (n: AgentNode): AgentNode =>
129  n.status === 'running' ? { ...n, status, endedAt: at } : n
130
131const statusOf = (word: string | undefined): NodeStatus =>
132  word === 'failed' ? 'failed' : word === 'killed' ? 'killed' : 'done'
133
134async function add($: Engine, node: AgentNode) {
135  await update($, nodes, list => [...list.filter(n => n.id !== node.id), node].slice(-400))
136  ensureTimers($)
137  // Unasked opens wait for a wide terminal; a refusal here must not fail the spawn.
138  void $.ui.open({ id: PANE, title: TITLE }).catch(() => undefined)
139}
140
141function ensureTimers($: Engine) {
142  reconciler ??= $.clock.every(5000, () => void reconcile($))
143  poller ??= $.clock.every(2000, () => void pollJournals($))
144}
145
146// $.agent.list() is the engine's own record of subagent status. It catches
147// ends no event reported (a killed background agent). Workflow agents are not listed.
148async function reconcile($: Engine) {
149  const at = await $.clock.now()
150  const listed = new Map((await $.agent.list()).map(a => [a.id, a]))
151  await update($, nodes, list =>
152    list.map(n => {
153      const info = listed.get(n.id)
154      if (!info || n.status !== 'running' || info.status === 'running') return n
155      return { ...n, status: statusOf(info.status === 'completed' ? 'done' : info.status), endedAt: at }
156    }),
157  )
158  await settleGroups($)
159  await archive($)
160  if (!(await read($, nodes)).some(n => n.status === 'running')) {
161    reconciler?.cancel()
162    reconciler = undefined
163  }
164}
165
166// A workflow's transcript folder says exactly which agents are its own, under
167// which script label and phase, on what type and model, and when each ended.
168async function pollJournals($: Engine) {
169  const wfs = (await read($, nodes)).filter(n => n.kind === 'workflow' && n.status === 'running' && n.transcriptDir)
170  if (wfs.length === 0) {
171    poller?.cancel()
172    poller = undefined
173    return
174  }
175  for (const wf of wfs) await syncJournal($, wf)
176  void titleAgents($)
177}
178
179async function syncJournal($: Engine, wf: AgentNode) {
180  const dir = wf.transcriptDir
181  if (!dir) return
182  const text = await $.fs.read(`${dir}/journal.jsonl`).catch(() => '')
183  const entries = parseJournal(text)
184  if (entries.length === 0) return
185  const at = await $.clock.now()
186  const list = await read($, nodes)
187  const known = new Map(list.map(n => [n.id, n]))
188  const fresh: AgentNode[] = []
189  for (const j of entries) {
190    const n = known.get(j.agentId)
191    if (n && n.tag !== undefined && n.type !== undefined && n.prompt !== undefined && (!j.isDone || n.status !== 'running')) continue
192    const meta = n?.type === undefined
193      ? await $.fs.read(`${dir}/agent-${j.agentId}.meta.json`).then(t => JSON.parse(t) as { agentType?: string; model?: string }).catch(() => undefined)
194      : undefined
195    const prompt = n?.prompt ?? firstPrompt(await $.fs.read(`${dir}/agent-${j.agentId}.jsonl`).catch(() => ''))
196    fresh.push({
197      ...(n ?? { id: j.agentId, kind: 'agent', label: j.label ?? `agent ${j.agentId.slice(0, 6)}`, status: 'running', startedAt: at, tools: 0 }),
198      parentId: wf.id,
199      tag: j.label ?? n?.tag,
200      phase: j.phase ?? n?.phase,
201      type: n?.type ?? meta?.agentType,
202      model: n?.model ?? meta?.model,
203      prompt: excerpt(prompt),
204      ...(j.isDone && n?.status === 'running' ? { status: 'done' as const, endedAt: at } : {}),
205      ...(j.isDone && !n ? { status: 'done' as const, endedAt: at } : {}),
206    })
207  }
208  const phases = [...new Set(entries.map(j => j.phase).filter((p): p is string => !!p))]
209  await update($, nodes, all => {
210    const byId = new Map(fresh.map(f => [f.id, f]))
211    const merged = all.map(n => byId.get(n.id) ?? (n.id === wf.id ? { ...n, phases } : n))
212    const added = fresh.filter(f => !all.some(n => n.id === f.id))
213    return [...merged, ...added].slice(-400)
214  })
215}
216
217// A group runs while any member runs. When the last one ends, the group ends with
218// it, gets one digest of all their reports and one toast, and moves to History.
219async function settleGroups($: Engine) {
220  const list = await read($, nodes)
221  for (const g of list.filter(n => n.kind === 'group' && n.status === 'running')) {
222    const kids = list.filter(k => k.parentId === g.id)
223    if (kids.length === 0 || kids.some(k => k.status === 'running')) continue
224    const status: NodeStatus = kids.some(k => k.status === 'failed') ? 'failed' : kids.every(k => k.status === 'killed') ? 'killed' : 'done'
225    const endedAt = Math.max(...kids.map(k => k.endedAt ?? g.startedAt))
226    const tokens = kids.reduce((a, k) => a + (k.tokens ?? 0), 0)
227    await patch($, g.id, x => ({ ...x, status, endedAt, tokens: tokens || undefined }))
228    void digest($, g.id)
229    await announce($, g.id)
230  }
231}
232
233// Subagents the main loop spawns in one turn are one piece of work. Once a turn has
234// two, they move into a group; later ones join it. One atomic update, so spawns that
235// land together (parallel Agent calls) all end up inside.
236async function regroup($: Engine, t: string): Promise<string | undefined> {
237  const id = `grp:${t}`
238  let isGrouped = false
239  await update($, nodes, all => {
240    const strays = all.filter(n => n.kind === 'agent' && !n.parentId && n.turn === t)
241    const has = all.some(n => n.id === id)
242    isGrouped = has || strays.length >= 2
243    if (!isGrouped || strays.length === 0) return all
244    const moved = all.map(n => (strays.includes(n) ? { ...n, parentId: id } : n))
245    if (has) return moved.map(n => (n.id === id && n.status !== 'running' ? { ...n, status: 'running' as const, endedAt: undefined, digested: false } : n))
246    const group: AgentNode = {
247      id, kind: 'group', label: strays[0]!.label, type: 'group', turn: t, where: strays[0]!.where,
248      status: 'running', startedAt: Math.min(...strays.map(f => f.startedAt)), tools: 0, titled: true,
249    }
250    return [...moved, group]
251  })
252  return isGrouped ? id : undefined
253}
254
255// A group's name says what its members work on together, from their task descriptions.
256// Named again when members join while Haiku is naming it.
257async function titleGroup($: Engine, id: string) {
258  if (titling.has(id)) return
259  const list = await read($, nodes)
260  const g = list.find(n => n.id === id)
261  const kids = list.filter(k => k.parentId === id)
262  if (!g || kids.length === 0 || g.titledFor === kids.length) return
263  titling.add(id)
264  const r = await ask($, 'haiku', {
265    maxTokens: 30,
266    system: 'You name a batch of AI agents that work toward one goal, so a person can scan a list of runs. Reply with the title only: 3 to 7 words, starting with a verb, naming the shared goal, no quotes, no final period.',
267    prompt: `Agents and their tasks:\n${kids.map(k => `- ${k.label}: ${(k.prompt ?? '').slice(0, 300)}`).join('\n')}`,
268  })
269  titling.delete(id)
270  const title = r?.isAnswered && r.text ? cleanTitle(r.text) : undefined
271  await patch($, id, x => ({ ...x, label: title ?? x.label, titledFor: kids.length, prompt: kids.map(k => k.label).join('; ') }))
272  void titleGroup($, id)
273}
274
275// Workflow agents carry script labels ("read:types"); a person wants "Read the type fields".
276async function titleAgents($: Engine) {
277  const list = await read($, nodes)
278  const wfIds = new Set(list.filter(n => n.kind === 'workflow').map(n => n.id))
279  const todo = list.filter(n => n.kind === 'agent' && n.parentId && wfIds.has(n.parentId) && !n.titled && n.prompt && !titling.has(n.id))
280  for (const n of todo.slice(0, Math.max(0, TITLE_CONCURRENCY - titling.size))) {
281    titling.add(n.id)
282    void ask($, 'haiku', {
283      maxTokens: 30,
284      system: 'You name tasks given to AI agents so a person can scan a list of them. Reply with the title only: 3 to 7 words, starting with a verb, no quotes, no final period.',
285      prompt: `Task:\n${(n.prompt ?? '').slice(0, 800)}`,
286    }).then(async r => {
287      const title = r?.isAnswered && r.text ? cleanTitle(r.text) : undefined
288      await patch($, n.id, x => ({ ...x, titled: true, label: title ?? x.label }))
289    }).catch(() => patch($, n.id, x => ({ ...x, titled: true }))).finally(() => {
290      titling.delete(n.id)
291      void titleAgents($)
292    })
293  }
294}
295
296async function endWorkflow($: Engine, taskId: string, word: string | undefined, result?: string) {
297  const wf = (await read($, nodes)).find(n => n.kind === 'workflow' && n.status === 'running' && n.taskId === taskId)
298  if (!wf) return
299  await syncJournal($, wf)
300  const at = await $.clock.now()
301  const status = statusOf(word)
302  // An agent the journal never saw end did not finish: it was cut with the run.
303  await update($, nodes, all =>
304    all.map(n => (n.id === wf.id ? withResult(finish(status, at)(n), result) : n.parentId === wf.id ? finish('killed', at)(n) : n)),
305  )
306  holdAnswer(wf.id, result)
307  void digest($, wf.id)
308  await announce($, wf.id)
309  await archive($)
310}
311
312// A finished top-level run gets a toast: what it was, how it ended, what it changed.
313async function announce($: Engine, id: string) {
314  const list = await read($, nodes)
315  const n = list.find(x => x.id === id)
316  if (!n || n.parentId || n.status === 'running') return
317  const rows = fileRows(scopeNodes(list, { kind: 'node', id: n.id }))
318  const head = n.status === 'failed' ? '✗ Failed' : n.status === 'killed' ? '■ Stopped' : '✓ Finished'
319  $.ui.toast(`${head}: ${n.label} · ${changesLine(rows)}`)
320}
321
322// Every model call goes through here: the /config setting decides who may write,
323// and what each call spent is kept for the History header.
324type Completion = { isAnswered: boolean; text?: string; usage?: { input_tokens: number; output_tokens: number } }
325async function ask($: Engine, tier: Tier, req: { system: string; prompt: string; maxTokens: number }): Promise<Completion | undefined> {
326  if (!aiAllows(aiMode, tier)) return undefined
327  const r = (await $.model.complete({ model: tier, ...req }).catch(() => undefined)) as Completion | undefined
328  const used = tokensOf(r)
329  // kept off the caller's path, one write at a time, so two calls never lose each other's spend
330  if (used) spendChain = spendChain.then(() => noteSpend($, used)).catch(() => undefined)
331  return r
332}
333let spendChain: Promise<void> = Promise.resolve()
334const tokensOf = (r: Completion | undefined) => (r?.usage ? r.usage.input_tokens + r.usage.output_tokens : 0)
335
336async function noteSpend($: Engine, tokens: number) {
337  const at = await $.clock.now()
338  const prev = ((await $.store.get(AI_SPEND)) as { at: number; tokens: number }[] | undefined) ?? []
339  await $.store.set(AI_SPEND, [...prev.filter(x => at - x.at < WEEK), { at, tokens }].slice(-2000))
340}
341
342async function aiWeek($: Engine): Promise<number> {
343  const at = await $.clock.now()
344  const list = ((await $.store.get(AI_SPEND)) as { at: number; tokens: number }[] | undefined) ?? []
345  return list.filter(x => at - x.at < WEEK).reduce((a, x) => a + x.tokens, 0)
346}
347
348const bumpAi = ($: Engine) => update($, aiSeq, s => ({ seq: (s?.seq ?? 0) + 1 }))
349
350// A node's change lands where the node is: the live list, History, or both.
351async function patchAnywhere($: Engine, id: string, fn: (n: AgentNode) => AgentNode) {
352  if ((await read($, nodes)).some(n => n.id === id)) await patch($, id, fn)
353  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
354  if (history.some(n => n.id === id)) await $.store.set(HISTORY, history.map(n => (n.id === id ? fn(n) : n)))
355  await bumpAi($)
356}
357
358// Live nodes over History: a finished run can sit in both for a moment, and the live copy wins.
359async function allNodes($: Engine): Promise<AgentNode[]> {
360  const byId = new Map<string, AgentNode>()
361  for (const n of [...(((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []), ...(await read($, nodes))]) byId.set(n.id, n)
362  return [...byId.values()]
363}
364
365// ── story steps: Haiku turns an agent's tool log into a few steps when it ends ──
366async function writeStory($: Engine, id: string) {
367  if (!aiAllows(aiMode, 'haiku') || storying.has(id)) return
368  const all = await read($, nodes)
369  const n = all.find(x => x.id === id)
370  if (!n || n.kind !== 'agent' || n.status === 'running' || n.story || n.storyTried) return
371  storying.add(id)
372  try {
373    await writeStoryOf($, n, all)
374  } catch {
375    // no transcript to read, or the read failed: the story is not asked again
376    await patch($, id, x => ({ ...x, storyTried: true })).catch(() => undefined)
377  } finally {
378    storying.delete(id)
379  }
380}
381
382async function writeStoryOf($: Engine, n: AgentNode, all: AgentNode[]) {
383  const id = n.id
384  await locateTranscripts($, [n], all)
385  const path = transcriptAt.get(id)
386  const at = await $.clock.now()
387  const events = path ? await transcriptEvents($, id, path, false, at) : undefined
388  if (!events?.length) { await patch($, id, x => ({ ...x, storyTried: true })); return }
389  const r = await ask($, 'haiku', { maxTokens: 400, system: STORY_SYSTEM, prompt: storyInput(n, events) })
390  const lines = r?.isAnswered && r.text ? parseStory(r.text) : undefined
391  const tokens = tokensOf(r)
392  await patch($, id, x => ({ ...x, storyTried: true, ...(lines ? { story: { steps: lines, model: TIER_NAME.haiku, ...(tokens ? { tokens } : {}), at } } : {}) }))
393  // an open trace reads the new steps at its next build
394  traceBuilt = undefined
395  await archive($)
396}
397
398// ── Explain this run: Sonnet, on demand, cached on the run ──────────────────
399// The caller has put the run in `explaining`; it leaves when the brief is stored.
400async function explainRun($: Engine, runId: string) {
401  try {
402    const all = await allNodes($)
403    const run = all.find(n => n.id === runId)
404    if (!run) return
405    const now = await $.clock.now()
406    const seen = insights(scopeNodes(all, { kind: 'node', id: run.id }), all, now).map(i => i.text)
407    const r = await ask($, 'sonnet', { maxTokens: 900, system: EXPLAIN_SYSTEM, prompt: explainInput(run, all, seen) })
408    const brief = r?.isAnswered && r.text ? parseBrief(r.text) : undefined
409    const tokens = tokensOf(r)
410    if (brief) await patchAnywhere($, runId, x => ({ ...x, explain: { ...brief, model: TIER_NAME.sonnet, ...(tokens ? { tokens } : {}), at: now } }))
411  } finally {
412    explaining.delete(runId)
413    await bumpAi($).catch(() => undefined)
414  }
415}
416
417// ── patterns across runs: Sonnet, on demand or weekly, one set per repository ──
418async function patternsKey($: Engine): Promise<string> {
419  const repo = await sessionRepo($)
420  return repo ? folderKey(repo) : 'all'
421}
422
423async function patternsDoc($: Engine): Promise<PatternsDoc | undefined> {
424  const docs = ((await $.store.get(PATTERNS)) as Record<string, PatternsDoc> | undefined) ?? {}
425  return docs[await patternsKey($)]
426}
427
428// The caller has set `patternsBusy`; it is cleared when the cards are stored.
429async function writePatterns($: Engine) {
430  try {
431    const key = await patternsKey($)
432    const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
433    const ids = new Set(history.map(n => n.id))
434    const runs = history.filter(n => (!n.parentId || !ids.has(n.parentId)) && (key === 'all' || runKey(n) === key))
435      .sort((a, b) => b.startedAt - a.startedAt)
436    if (runs.length < 2) return
437    const r = await ask($, 'sonnet', { maxTokens: 1200, system: PATTERNS_SYSTEM, prompt: patternsInput(runs, history) })
438    const cards = r?.isAnswered && r.text ? parsePatterns(r.text, runs) : undefined
439    const tokens = tokensOf(r)
440    if (cards) {
441      const docs = ((await $.store.get(PATTERNS)) as Record<string, PatternsDoc> | undefined) ?? {}
442      await $.store.set(PATTERNS, { ...docs, [key]: { cards, model: TIER_NAME.sonnet, ...(tokens ? { tokens } : {}), at: await $.clock.now() } })
443    }
444  } finally {
445    patternsBusy = false
446    await bumpAi($).catch(() => undefined)
447  }
448}
449
450// The report: what finished work achieved, in short plain sentences a person
451// scans. One Haiku call when it finishes, so the words are there before anyone
452// looks. Written bottom-up: an agent from its own report, a workflow phase from
453// its agents' reports, a cluster or a workflow from its part reports.
454// a reply that is not the asked-for JSON still says something: its first sentence is the result;
455// JSON that would not parse is never shown as words
456function reportFrom(r: Completion | undefined, at: number): Report | undefined {
457  if (!r?.isAnswered || !r.text) return undefined
458  const fallback = /[{}]/.test(r.text) ? '' : firstSentence(r.text, 300)
459  const parsed = parseReport(r.text) ?? (fallback ? { result: fallback } : undefined)
460  if (!parsed) return undefined
461  const tokens = r.usage ? r.usage.input_tokens + r.usage.output_tokens : 0
462  return { ...parsed, model: TIER_NAME.haiku, ...(tokens ? { tokens } : {}), at }
463}
464
465async function digest($: Engine, id: string) {
466  if (digesting.has(id)) return
467  const list = await read($, nodes)
468  const n = list.find(x => x.id === id)
469  if (!n || n.digested || n.status === 'running') return
470  const kids = list.filter(k => k.parentId === id)
471  // a cluster's report reads its members' reports: wait until each finished member has one;
472  // a workflow waits for the agent reports still being written, then writes what it has
473  if (n.kind === 'group' && kids.some(k => k.status !== 'running' && !k.digested && k.result)) return
474  if (n.kind === 'workflow' && kids.some(k => digesting.has(k.id))) return
475  digesting.add(id)
476  if (n.kind === 'workflow') await writeParts($, id, true)
477  const now = await read($, nodes)
478  const node = now.find(x => x.id === id) ?? n
479  const hasInput = node.kind === 'agent' ? !!node.result?.trim() : kids.length > 0 || !!node.result?.trim()
480  const r = hasInput ? await ask($, 'haiku', { maxTokens: REPORT_TOKENS, system: REPORT_SYSTEM, prompt: runInput(node, now, answers.get(id)) }) : undefined
481  answers.delete(id)
482  const report = reportFrom(r, await $.clock.now())
483  await patch($, id, x => ({
484    ...x, digested: true,
485    ...(report ? { report, ...(report.result ? { summary: report.result } : {}), ...(report.done ? { points: report.done } : {}) } : {}),
486  }))
487  // released only once the report is stored, so a second trigger cannot write it twice
488  digesting.delete(id)
489  await archive($)
490  // an agent's report may be what its cluster, its workflow or its phase was waiting for
491  const parent = node.parentId ? (await read($, nodes)).find(x => x.id === node.parentId) : undefined
492  if (!parent || (parent.kind !== 'group' && parent.kind !== 'workflow')) return
493  if (parent.status !== 'running') { if (!parent.digested) void digest($, parent.id) }
494  else if (parent.kind === 'workflow') void writeParts($, parent.id, false)
495}
496
497// A workflow's phases that have finished get a part report each, read from their
498// agents' reports. While the run goes on, a phase waits until each of its agents
499// has its own short report; when the run ends (`force`), it is written
500// from what there is. A phase that gained agents since its report is written again.
501async function writeParts($: Engine, wfId: string, force: boolean) {
502  const list = await read($, nodes)
503  const wf = list.find(n => n.id === wfId)
504  if (!wf) return
505  for (const p of pipeline(wf, list)) {
506    if (p.running > 0 || p.total === 0) continue
507    const agents = list.filter(k => k.parentId === wfId && (k.phase ?? 'Agents') === p.phase)
508    if (!force && agents.some(k => !k.digested)) continue
509    await partDigest($, wfId, p.phase)
510  }
511}
512
513async function partDigest($: Engine, wfId: string, phase: string) {
514  const key = `${wfId}::${phase}`
515  if (digesting.has(key)) return
516  // taken before the first await, so a second trigger cannot slip in while this one reads
517  digesting.add(key)
518  try {
519    const list = await read($, nodes)
520    const wf = list.find(n => n.id === wfId)
521    const total = list.filter(k => k.parentId === wfId && (k.phase ?? 'Agents') === phase).length
522    // read now, not when the caller looked: another trigger may have written it meanwhile
523    if (!wf || wf.partReports?.[phase]?.count === total) return
524    const r = await ask($, 'haiku', { maxTokens: PART_TOKENS, system: REPORT_SYSTEM, prompt: partInput(wf, phase, list) })
525    const report = reportFrom(r, await $.clock.now())
526    await patch($, wfId, x => ({ ...x, partReports: { ...x.partReports, [phase]: { ...(report ?? {}), count: total } } }))
527  } finally {
528    // released only once the report is stored
529    digesting.delete(key)
530  }
531}
532
533type Change = NonNullable<AgentNode['changes']>
534const addChange = (prev: AgentNode['changes'], e: { path: string; added: number; removed: number }): Change => {
535  const c = prev?.[e.path] ?? { edits: 0, added: 0, removed: 0 }
536  return { ...prev, [e.path]: { edits: c.edits + 1, added: c.added + e.added, removed: c.removed + e.removed } }
537}
538
539const slim = (n: AgentNode): AgentNode => ({ ...n, prompt: excerpt(n.prompt, 300), result: excerpt(n.result, 600), activity: undefined, act: undefined })
540
541// The session's root folder: where it started, or where /cd moved it. A shell
542// cd does not move it, and neither does the folder the mod's commands run in.
543async function sessionRepo($: Engine): Promise<string | undefined> {
544  return (await $.session.root().catch(() => '')) || undefined
545}
546
547// Runs saved before the repo was the root folder get its key from where their
548// transcripts are kept: ~/.claude/projects/<root folder key>/..., once.
549async function backfillRepos($: Engine) {
550  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
551  const byId = new Map(history.map(n => [n.id, n]))
552  const topOf = (n: AgentNode): AgentNode => (n.parentId && byId.has(n.parentId) ? topOf(byId.get(n.parentId)!) : n)
553  const tops = history.filter(n => topOf(n) === n && !n.repoTried)
554  if (tops.length === 0) return
555  const agentsUnder = new Map(tops.map(t => [t.id, history.filter(n => n.kind === 'agent' && topOf(n) === t).map(n => n.id)]))
556  const ids = [...new Set([...agentsUnder.values()].flat())]
557  const home = await $.env.get('HOME')
558  const names = ids.flatMap((id, i) => [...(i ? ['-o'] : []), '-name', `agent-${id}.jsonl`])
559  const found = ids.length
560    ? await $.process.run(['find', `${home}/.claude/projects`, '-maxdepth', '6', '(', ...names, ')'], { timeoutMs: 20000 }).catch(() => undefined)
561    : undefined
562  const keyOf = new Map((found?.stdout ?? '').split('\n').filter(Boolean).map(p => [p.replace(/^.*agent-|\.jsonl$/g, ''), p.split('/projects/')[1]?.split('/')[0]]))
563  const keys = new Map(tops.map(t => [t.id, (agentsUnder.get(t.id) ?? []).map(id => keyOf.get(id)).find(Boolean)]))
564  await $.store.set(HISTORY, history.map(n => {
565    if (!keys.has(n.id)) return n
566    const key = keys.get(n.id)
567    // a key from the transcript's folder wins over a repo recorded from the wrong folder
568    const { repo: _repo, ...rest } = n
569    return key ? { ...rest, repoKey: key, repoTried: true } : { ...n, repoTried: true }
570  }))
571}
572
573// The repo as a view prop: left out when there is none, since props hold no undefined.
574async function repoProp($: Engine): Promise<{ repo?: string }> {
575  const repo = await sessionRepo($)
576  return repo ? { repo } : {}
577}
578
579// Runs kept before reports were read from SubagentHandback calls get theirs
580// from their transcripts, once.
581async function backfillReports($: Engine) {
582  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
583  const todo = history.filter(n => n.kind === 'agent' && !n.result && !n.reportTried)
584  if (todo.length === 0) return
585  const home = await $.env.get('HOME')
586  const names = todo.flatMap((n, i) => [...(i ? ['-o'] : []), '-name', `agent-${n.id}.jsonl`])
587  const found = await $.process.run(['find', `${home}/.claude/projects`, '-maxdepth', '6', '(', ...names, ')'], { timeoutMs: 20000 }).catch(() => undefined)
588  const pathOf = new Map((found?.stdout ?? '').split('\n').filter(Boolean).map(p => [p.replace(/^.*agent-|\.jsonl$/g, ''), p]))
589  const reports = new Map<string, string>()
590  for (const n of todo) {
591    const path = pathOf.get(n.id)
592    const report = path ? handbackOf(await $.fs.read(path).catch(() => '')) : undefined
593    if (report) reports.set(n.id, report)
594  }
595  const tried = new Set(todo.map(n => n.id))
596  await $.store.set(HISTORY, history.map(n => (tried.has(n.id) ? withResult({ ...n, reportTried: true }, reports.get(n.id), 600) : n)))
597}
598
599// Reports written before the whole answer was read came from its first 400 (or 600)
600// characters, and often called finished work unfinished. Each such agent's report is
601// written again from its transcript, once, then each cluster over them. A report kept
602// as raw JSON, from a reply cut at its token cap, is written again too (the second
603// mark: the first pass made many of those). Every open session runs this at its
604// start, so the first takes a mark and the others leave it.
605const REDONE = 'reportsRedone2'
606const REDO_CONCURRENCY = 4
607async function redoReports($: Engine) {
608  if (!aiAllows(aiMode, 'haiku')) return
609  const now = await $.clock.now()
610  const mark = (await $.store.get(REDONE)) as { token: string; at: number; done?: boolean } | undefined
611  // a mark left by a session that ended mid-way is taken over after 15 minutes
612  if (mark && (mark.done || now - mark.at < 15 * 60_000)) return
613  const token = `${now}-${Math.random().toString(36).slice(2)}`
614  await $.store.set(REDONE, { token, at: now })
615  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
616  const isCut = (n: AgentNode) => n.resultLength !== undefined || (n.result?.length ?? 0) >= 400
617  const todo = history.filter(n => n.kind === 'agent' && ((n.resultLength === undefined && isCut(n)) || isRawReport(n.summary)))
618  // only a cut answer needs its transcript
619  const cut = todo.filter(isCut)
620  const home = await $.env.get('HOME')
621  const names = cut.flatMap((n, i) => [...(i ? ['-o'] : []), '-name', `agent-${n.id}.jsonl`])
622  const found = cut.length
623    ? await $.process.run(['find', `${home}/.claude/projects`, '-maxdepth', '6', '(', ...names, ')'], { timeoutMs: 20000 }).catch(() => undefined)
624    : undefined
625  // another session took the job while the transcripts were looked for
626  if (((await $.store.get(REDONE)) as { token?: string } | undefined)?.token !== token) return
627  const pathOf = new Map((found?.stdout ?? '').split('\n').filter(Boolean).map(p => [p.replace(/^.*agent-|\.jsonl$/g, ''), p]))
628  const fulls = new Map<string, string>()
629  for (const n of cut) {
630    const path = pathOf.get(n.id)
631    const full = path ? handbackOf(await $.fs.read(path).catch(() => '')) : undefined
632    if (full && full.length > n.result!.length) fulls.set(n.id, full)
633  }
634  const reports = new Map<string, Report>()
635  const write = async (list: AgentNode[], ns: AgentNode[], full?: (n: AgentNode) => string | undefined) => {
636    for (let i = 0; i < ns.length; i += REDO_CONCURRENCY) {
637      await Promise.all(ns.slice(i, i + REDO_CONCURRENCY).map(async n => {
638        const r = await ask($, 'haiku', { maxTokens: REPORT_TOKENS, system: REPORT_SYSTEM, prompt: runInput(n, list, full?.(n)) })
639        const report = reportFrom(r, await $.clock.now())
640        if (report) reports.set(n.id, report)
641      }))
642    }
643  }
644  const withReport = (n: AgentNode): AgentNode => {
645    const report = reports.get(n.id)
646    return {
647      ...n, ...(fulls.has(n.id) ? { resultLength: fulls.get(n.id)!.length } : {}),
648      ...(report ? { report, ...(report.result ? { summary: report.result } : {}), ...(report.done ? { points: report.done } : {}) } : {}),
649    }
650  }
651  // a raw report with no transcript is written from the kept copy, its cut named
652  const agents = todo.filter(n => fulls.has(n.id) || isRawReport(n.summary))
653  await write(history, agents, n => fulls.get(n.id))
654  // a cluster's report reads its members' reports, so it is written after theirs
655  const redone = history.map(withReport)
656  const groups = redone.filter(g => g.kind === 'group' && (isRawReport(g.summary) || agents.some(a => a.parentId === g.id && reports.has(a.id))))
657  await write(redone, groups)
658  // History may have grown while the reports were written: only these nodes change
659  const latest = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
660  await $.store.set(HISTORY, latest.map(withReport))
661  await $.store.set(REDONE, { token, at: now, done: true })
662}
663
664// A finished top-level run, with everything under it, is kept across sessions.
665async function archive($: Engine) {
666  const list = await read($, nodes)
667  const ids = new Set(list.map(n => n.id))
668  const tops = list.filter(n => !n.parentId || !ids.has(n.parentId))
669  const subtree = (id: string): AgentNode[] => list.filter(n => n.parentId === id).flatMap(k => [k, ...subtree(k.id)])
670  const done = tops.map(t => [t, ...subtree(t.id)]).filter(run => run.every(n => n.status !== 'running'))
671  if (done.length === 0) return
672  const prev = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
673  const repo = await sessionRepo($)
674  const fresh = done.flat().map(slim).map(n => (repo && !n.repo ? { ...n, repo, repoTried: true } : n))
675  const freshIds = new Set(fresh.map(n => n.id))
676  const same = (a: unknown, b: unknown) => JSON.stringify(a) === JSON.stringify(b)
677  if (fresh.every(f => prev.some(p => p.id === f.id && p.status === f.status && p.label === f.label && p.summary === f.summary && p.parentId === f.parentId
678    && same(p.report, f.report) && same(p.partReports, f.partReports) && same(p.story, f.story) && same(p.explain, f.explain)))) return
679  const merged = [...prev.filter(p => !freshIds.has(p.id)), ...fresh]
680  const runTops = merged.filter(n => !n.parentId || !merged.some(m => m.id === n.parentId))
681  const keep = new Set(runTops.slice(-HISTORY_RUNS).map(n => n.id))
682  const rootOf = (n: AgentNode): string => {
683    const p = n.parentId && merged.find(m => m.id === n.parentId)
684    return p ? rootOf(p) : n.id
685  }
686  await $.store.set(HISTORY, merged.filter(n => keep.has(rootOf(n))))
687  // their edits go with them, so History can still show the diffs
688  const kept = new Set(merged.filter(n => keep.has(rootOf(n))).map(n => n.id))
689  const pastEdits = ((await $.store.get(EDITS)) as EditRecord[] | undefined) ?? []
690  const freshEdits = (await read($, edits)).filter(r => freshIds.has(r.agentId)).map(r => ({ ...r, old: r.old.slice(0, 2500), new: r.new.slice(0, 2500) }))
691  const known = new Set(pastEdits.map(r => r.id))
692  await $.store.set(EDITS, [...pastEdits, ...freshEdits.filter(r => !known.has(r.id))].filter(r => kept.has(r.agentId)).slice(-EDITS_KEPT))
693}
694
695export const register: Register = (on, options) => {
696  themeName = themeNameOf(options?.theme)
697  aiMode = AI_MODES.includes(options?.ai as AiMode) ? (options!.ai as AiMode) : 'cheap'
698  on('session.start', async ($, e, next) => {
699    await $.command.register({
700      name: 'agent-tree',
701      description: 'Show subagents and workflows in a side pane (`clear` empties the history)',
702    })
703    await archive($)
704    await backfillReports($)
705    await backfillRepos($)
706    void redoReports($).catch(() => undefined)
707    if ((await read($, nodes)).some(n => n.status === 'running')) ensureTimers($)
708    // patterns written more than a week ago are written again, in the background, on Full only
709    const doc = aiAllows(aiMode, 'sonnet') ? await patternsDoc($) : undefined
710    if (doc && (await $.clock.now()) - doc.at > WEEK && !patternsBusy) {
711      patternsBusy = true
712      void writePatterns($).catch(() => undefined)
713    }
714
715    return next(e)
716  })
717
718  on('command.run', { command: 'agent-tree' }, async ($, e) => {
719    if (e.args.trim() === 'clear') {
720      await update($, nodes, list => list.filter(n => n.status === 'running'))
721      await $.store.set(HISTORY, [])
722      await $.store.set(EDITS, [])
723      await update($, edits, () => [])
724      return { text: 'Agent history cleared.' }
725    }
726    await $.ui.open({ id: PANE, title: TITLE })
727
728    return { text: 'Agents pane opened. Click it; ? shows the keys.' }
729  })
730
731  on('tool.call', { tool: 'Agent' }, (_$, e, next) => {
732    agentCalls.add(e.tool_use_id)
733    if (e.isolation) isolationOf.set(e.tool_use_id, e.isolation)
734    return next(e)
735  })
736
737  on('agent.spawn', async ($, e, next) => {
738    const startedAt = await $.clock.now()
739    const ran = await next(e)
740    if (ran.deny !== undefined || !ran.agentId) return ran
741
742    const list = await read($, nodes)
743    const fromWorkflow = !agentCalls.has(e.tool_use_id) ? runningWorkflow(list) : undefined
744    const fromMain = !e.parentAgentId && !fromWorkflow
745    const t = fromMain ? (turn ??= `t${startedAt}`) : undefined
746    await add($, {
747      id: ran.agentId,
748      kind: 'agent',
749      parentId: e.parentAgentId ?? fromWorkflow?.id,
750      turn: t,
751      label: e.name ?? e.description,
752      type: e.subagentType,
753      model: ran.model,
754      where: isolationOf.get(e.tool_use_id) ?? 'main',
755      status: 'running',
756      startedAt,
757      tools: 0,
758      act: 'think',
759      prompt: excerpt(e.prompt),
760      titled: !fromWorkflow,
761    })
762    const group = t ? await regroup($, t) : undefined
763    if (group) void titleGroup($, group)
764
765    return ran
766  })
767
768  on('tool.call', { tool: 'Workflow' }, async ($, e, next) => {
769    const id = `wf:${e.tool_use_id}`
770    const name = e.name ?? scriptField(e.script, 'name') ?? 'workflow'
771    const description = scriptField(e.script, 'description')
772    await add($, {
773      id, kind: 'workflow', parentId: e.agentId, label: description ?? name, tag: name, type: 'workflow',
774      status: 'running', startedAt: await $.clock.now(), tools: 0, prompt: description,
775    })
776    const ran = await next(e)
777    if (ran.deny !== undefined || ran.isError) {
778      await patch($, id, finish('failed', await $.clock.now()))
779    } else {
780      const { taskId, workflowName, transcriptDir } = ran.result
781      await patch($, id, n => ({ ...n, taskId, transcriptDir, tag: workflowName ?? n.tag }))
782      ensureTimers($)
783    }
784
785    return ran
786  })
787
788  on('tool.call', async ($, e, next) => {
789    if (!e.agentId) return next(e)
790    const { agentId, tool } = e
791    const input = e as unknown as Record<string, unknown>
792    const { act, activity } = describeTool(tool, input)
793    const list = await read($, nodes)
794    const calledAt = await $.clock.now()
795    if (list.some(n => n.id === agentId)) {
796      await patch($, agentId, n => ({
797        ...n, tools: n.tools + 1, lastTool: tool, lastToolAt: calledAt, act, activity, status: 'running', endedAt: undefined,
798        work: act === 'think' ? n.work : { ...n.work, [act]: (n.work?.[act] ?? 0) + 1 },
799      }))
800      // An agent that hands its report back through a tool ends with no final text.
801      // SubagentHandback is not in the typed tool list, so the name is compared as a string.
802      if ((tool as string) === 'SubagentHandback' && typeof input.message === 'string') {
803        const report = input.message
804        await patch($, agentId, n => withResult(n, report))
805        holdAnswer(agentId, report)
806      }
807      ensureTimers($)
808    } else {
809      // A workflow agent seen before its journal line: filed under the running
810      // workflow now, and corrected by the journal on the next poll.
811      const wf = runningWorkflow(list)
812      if (!wf) return next(e)
813      await add($, {
814        id: agentId, kind: 'agent', parentId: wf.id, label: `agent ${agentId.slice(0, 6)}`,
815        status: 'running', startedAt: calledAt, tools: 1, lastTool: tool, lastToolAt: calledAt, act, activity,
816        work: act === 'think' ? {} : { [act]: 1 },
817      })
818    }
819
820    // An edit is recorded once it has landed: its before and after text, where it
821    // sits in the file, and a true line count of what it added and removed.
822    const path = editedPath(tool, input)
823    if (!path) return next(e)
824    const before = tool === 'Write' ? await $.fs.read(path).catch(() => undefined) : undefined
825    const ran = await next(e)
826    if (ran.deny !== undefined || ran.isError) return ran
827    const after = await $.fs.read(path).catch(() => undefined)
828    const at = await $.clock.now()
829    const recs = editRecords(tool, input, before, after).map((r, i) => ({
830      ...r, id: `${e.tool_use_id}:${i}`, agentId, at,
831      old: r.old.slice(0, EDIT_TEXT), new: r.new.slice(0, EDIT_TEXT),
832    }))
833    const stats = recs.map(r => diffCounts(lineDiff(r.old, r.new)))
834    await update($, edits, all => [...all, ...recs].slice(-EDITS_KEPT))
835    await patch($, agentId, n => {
836      let changes = n.changes
837      for (const s of stats) changes = addChange(changes, { path, ...s })
838      return { ...n, changes }
839    })
840    return ran
841  })
842
843  on('turn.complete', async ($, e, next) => {
844    const { agentId } = e
845    if (agentId) {
846      const at = await $.clock.now()
847      const u = e.usage
848      const tokens = u ? u.input_tokens + u.output_tokens + u.cache_read_input_tokens + u.cache_creation_input_tokens : undefined
849      const status: NodeStatus = e.isAborted ? 'killed' : 'done'
850      const list = await read($, nodes)
851      const wf = runningWorkflow(list)
852      if (list.some(n => n.id === agentId)) {
853        await patch($, agentId, n => withResult({
854          ...finish(status, at)(n),
855          model: n.model ?? u?.model,
856          tokens: (n.tokens ?? 0) + (tokens ?? 0),
857        }, e.answer))
858      } else if (wf) {
859        // A workflow agent that never called a tool is first seen as it ends.
860        await add($, withResult({
861          id: agentId, kind: 'agent', parentId: wf.id, label: `agent ${agentId.slice(0, 6)}`,
862          model: u?.model, status, startedAt: at - e.durationMs, endedAt: at, tools: 0, tokens,
863        }, e.answer))
864      }
865      holdAnswer(agentId, e.answer)
866      void digest($, agentId)
867      void writeStory($, agentId).catch(() => undefined)
868      await announce($, agentId)
869      await settleGroups($)
870      await archive($)
871    }
872
873    return next(e)
874  })
875
876  // A background task's end reaches the main loop as a queued prompt whose
877  // origin is `task-notification`, its text naming the task id and status.
878  on('prompt.submit', async ($, e, next) => {
879    // a prompt taken while idle opens a new turn; one delivered into a running turn
880    // (typed ahead, or a background task's notice) stays part of it
881    if (!e.turnId) turn = `t${await $.clock.now()}`
882    if (e.origin.kind === 'task-notification') {
883      const id = /<task-id>\s*([^<\s]+)/.exec(e.text)?.[1]
884      if (id) await endWorkflow($, id, /<status>\s*(\w+)/.exec(e.text)?.[1], /<result>([\s\S]*?)<\/result>/.exec(e.text)?.[1]?.trim())
885    }
886    return next(e)
887  })
888
889  // Backstop: at each stop the engine lists the background work still in flight.
890  // A running workflow missing from that list has ended.
891  on('classic.Stop', async ($, e, next) => {
892    if (e.transcript_path) subagentsDir = `${e.transcript_path.replace(/\.jsonl$/, '')}/subagents`
893    const inFlight = e.background_tasks
894    if (Array.isArray(inFlight)) {
895      const live = new Set(inFlight.map(t => t.id))
896      const gone = (await read($, nodes)).filter(n => n.kind === 'workflow' && n.status === 'running' && n.taskId && !live.has(n.taskId))
897      for (const wf of gone) if (wf.taskId) await endWorkflow($, wf.taskId, 'completed')
898    }
899    return next(e)
900  })
901
902  // The transcript's own Agent and Workflow rows shrink to one line; the pane is the full view.
903  on('ui.render', { component: 'ToolUse' }, async ($, e, next) => {
904    const { tool, isRunning, isErrored } = e.props
905    if (!AGENT_TOOLS.has(tool) && tool !== 'Workflow') return next(e)
906    const { Box, Text } = $.ui.resolve(e)
907    const input = (e.props.input ?? {}) as { description?: string; subagent_type?: string; name?: string; script?: string }
908    const label = tool === 'Workflow'
909      ? scriptField(input.script, 'description') ?? input.name ?? scriptField(input.script, 'name') ?? 'workflow'
910      : input.description ?? 'subagent'
911    const kind = tool === 'Workflow' ? 'Workflow' : `${input.subagent_type ?? 'General-purpose'} agent`
912    const t = themeOf(themeName)
913    const st = t.status[isErrored ? 'failed' : isRunning ? 'running' : 'done']
914
915    return (
916      <Box flexDirection="row" gap={1}>
917        <Text color={st.color}>{st.icon}</Text>
918        {/* one glyph means status; only a workflow adds one for what it is */}
919        {tool === 'Workflow' ? <Text>{t.kind.workflow}</Text> : null}
920        <Text bold wrap="truncate-end">{label}</Text>
921        <Text dimColor>· {kind} · details in the Agents pane</Text>
922      </Box>
923    )
924  })
925
926  // The view asks for a file's diff when it opens one, and lets it go when it closes it.
927  // It asks for a run's trace the same way: which run, how close, where it reads.
928  on('ui.message', async ($, e, next) => {
929    const data = e.data as { type?: unknown; path?: unknown; run?: unknown; zoom?: unknown; offset?: unknown; regenerate?: unknown; lens?: unknown; focus?: unknown; lane?: unknown; query?: unknown } | null
930    if (e.requestId !== PANE) return next(e)
931    if (data?.type === 'diff') {
932      diffPath = typeof data.path === 'string' ? data.path : null
933      return { props: await viewProps($) }
934    }
935    if (data?.type === 'trace') {
936      await askTrace($, data)
937      return { props: await viewProps($) }
938    }
939    if (data?.type === 'export' && typeof data.run === 'string') {
940      const lens = data.lens === 'trace' ? 'trace' : 'timeline'
941      const zoom: TraceZoom = ZOOMS.includes(data.zoom as TraceZoom) ? (data.zoom as TraceZoom) : 'story'
942      void exportPicture($, data.run, lens, zoom, typeof data.focus === 'string' ? data.focus : undefined).catch(() => note($, 'Could not draw the picture.'))
943      return { props: await viewProps($) }
944    }
945    // Explain this run and patterns are Sonnet's, on Full only: the view says how to turn them on
946    if (data?.type === 'explain' && typeof data.run === 'string' && aiAllows(aiMode, 'sonnet') && !explaining.has(data.run)) {
947      explaining.add(data.run)
948      void explainRun($, data.run).catch(() => undefined)
949      return { props: await viewProps($) }
950    }
951    if (data?.type === 'patterns' && aiAllows(aiMode, 'sonnet') && !patternsBusy) {
952      patternsBusy = true
953      void writePatterns($).catch(() => undefined)
954      return { props: await viewProps($) }
955    }
956    return next(e)
957  })
958
959  // The pane's rows are the view's own, so the engine has nothing to scroll:
960  // each wheel tick is handed to the view, which moves its selection or text.
961  on('ui.scroll', { requestId: PANE }, async ($, e, next) => {
962    // a drawing taller than the pane (the desktop's) scrolls as the engine scrolls it
963    if (e.origin.kind !== 'person' || e.contentRows > e.bodyRows) return next(e)
964    await update($, wheel, w => ({ seq: (w?.seq ?? 0) + 1, by: e.by }))
965    return {}
966  })
967
968  // A load failure is the module itself, so a fresh instance would fail the same way.
969  on('ui.fault', { component: 'Pane', requestId: PANE }, async ($, e, next) => {
970    const r = await next(e)
971    const now = await $.clock.now()
972    faultsAt = faultsAt.filter(t => now - t < FAULT_WINDOW)
973    if (e.element === viewKey() && e.phase !== 'load' && faultsAt.length < FAULT_RETRIES) {
974      faultsAt.push(now)
975      viewGen++
976      $.ui.invalidate('ui.render')
977    }
978    return r
979  })
980
981  on('ui.render', { component: 'Pane', requestId: PANE }, async ($, e) => {
982    const els = $.ui.resolve(e)
983    // phase 6: the desktop draws its own native view; presses write the desk state
984    if (e.surface === 'desktop') {
985      const columns = e.props.bodyColumns ?? e.viewport?.columns ?? 120
986      return drawDesktop(els, await viewProps($), deskUi(await read($, desk)), {
987        set: change => void update($, desk, s => ({ ...deskUi(s), ...change })),
988        openDiff: path => {
989          diffPath = path
990          void update($, desk, s => ({ ...deskUi(s) }))
991        },
992        // a trail that could not be read leaves the view as it was
993        askTrace: (run, zoom, offset) => void askTrace($, run ? { run, zoom, offset } : {})
994          .then(() => update($, desk, s => ({ ...deskUi(s) })))
995          .catch(() => undefined),
996        // the same Sonnet jobs as the terminal's e and g, on Full only
997        explain: run => {
998          if (!aiAllows(aiMode, 'sonnet') || explaining.has(run)) return
999          explaining.add(run)
1000          void update($, desk, s => ({ ...deskUi(s) }))
1001          void explainRun($, run).catch(() => undefined)
1002        },
1003        patterns: () => {
1004          if (!aiAllows(aiMode, 'sonnet') || patternsBusy) return
1005          patternsBusy = true
1006          void update($, desk, s => ({ ...deskUi(s) }))
1007          void writePatterns($).catch(() => undefined)
1008        },
1009        exportPic: (run, lens, zoom, focus) => void exportPicture($, run, lens, zoom, focus).catch(() => note($, 'Could not draw the picture.')),
1010      }, columns)
1011    }
1012    // the pane body's own height: the viewport is the whole terminal, frame and all
1013    const rows = Math.max(8, e.props.scroll?.bodyRows ?? (e.viewport?.rows ?? 24) - 4)
1014    if (!('Client' in els)) return <els.Text dimColor>The Agents pane needs the terminal or desktop.</els.Text>
1015    const { Client } = els
1016
1017    return <Client key={viewKey()} module="./view.tsx" props={await viewProps($)} width="100%" height={rows} />
1018  })
1019}
1020
1021async function viewProps($: Engine): Promise<ViewProps> {
1022  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
1023  // read so a trace read again, or an AI block written to the store, redraws the pane
1024  await read($, traceSeq)
1025  await read($, aiSeq)
1026  const patterns = await patternsDoc($)
1027  const ai = { ai: aiMode, aiWeek: await aiWeek($), explaining: [...explaining], patternsBusy, ...(patterns ? { patterns } : {}), ...(exported ? { exported } : {}) }
1028  const trace = traceReq && traceSnap ? { trace: traceSnap } : {}
1029  const live = await read($, nodes)
1030  const runs = { nodes: live, history, at: await $.clock.now() }
1031  const rest = { ...await repoProp($), theme: themeName, wheel: await read($, wheel), ...trace, ...ai }
1032  if (!diffPath) return fitView(runs, rest)
1033  await backfill($, diffPath, [...history, ...live])
1034  const pastEdits = ((await $.store.get(EDITS)) as EditRecord[] | undefined) ?? []
1035  const seen = new Set<string>()
1036  const forFile = [...pastEdits, ...(await read($, edits))]
1037    .filter(r => r.path === diffPath && !seen.has(r.id) && seen.add(r.id))
1038    .sort((a, b) => a.at - b.at)
1039  // the open file's edits are measured with the rest, before the runs take what is left
1040  return fitView(runs, { ...rest, diff: { path: diffPath, edits: forFile } })
1041}
1042
1043// Agents that changed this file but left no edit records (runs from before edits
1044// were kept) get theirs rebuilt from their transcripts, once, and stored.
1045async function backfill($: Engine, path: string, all: AgentNode[]) {
1046  const stored = ((await $.store.get(EDITS)) as EditRecord[] | undefined) ?? []
1047  const live = await read($, edits)
1048  const has = new Set([...stored, ...live].filter(r => r.path === path).map(r => r.agentId))
1049  const byId = new Map(all.map(n => [n.id, n]))
1050  const todo = [...byId.values()].filter(n => n.changes?.[path] && !has.has(n.id) && !backfilled.has(n.id))
1051  if (todo.length === 0) return
1052  const now = await $.fs.read(path).catch(() => undefined)
1053  const found: EditRecord[] = []
1054  for (const n of todo) {
1055    backfilled.add(n.id)
1056    const dir = n.parentId ? byId.get(n.parentId)?.transcriptDir : undefined
1057    const sessionAgents = subagentsDir ?? dir?.replace(/\/workflows\/[^/]+$/, '')
1058    // a trace may already have found it, in this session's folder or another's
1059    const file = transcriptAt.get(n.id) ?? (dir ? `${dir}/agent-${n.id}.jsonl` : sessionAgents ? `${sessionAgents}/agent-${n.id}.jsonl` : undefined)
1060    if (!file) continue
1061    const text = await $.fs.read(file).catch(() => '')
1062    found.push(...transcriptEdits(text, n.id, now).filter(r => r.path === path)
1063      .map(r => ({ ...r, old: r.old.slice(0, 2500), new: r.new.slice(0, 2500) })))
1064  }
1065  if (found.length === 0) return
1066  const known = new Set(stored.map(r => r.id))
1067  await $.store.set(EDITS, [...stored, ...found.filter(r => !known.has(r.id))].slice(-EDITS_KEPT))
1068}
1069
1070// ── the trace: read from transcripts when the view asks, never on a redraw ────
1071
1072// The view asks for a run's trace (or lets it go). A new run or zoom is read now;
1073// a new place to read only moves the window. A live run is read again every 2 s.
1074async function askTrace($: Engine, data: { run?: unknown; zoom?: unknown; offset?: unknown; lane?: unknown; query?: unknown }) {
1075  const run = typeof data.run === 'string' ? data.run : null
1076  if (!run) {
1077    traceReq = null
1078    traceSnap = undefined
1079    traceBuilt = undefined
1080    tracer?.cancel()
1081    tracer = undefined
1082    return
1083  }
1084  const zoom: TraceZoom = ZOOMS.includes(data.zoom as TraceZoom) ? (data.zoom as TraceZoom) : 'story'
1085  const offset = typeof data.offset === 'number' && Number.isFinite(data.offset) ? Math.max(0, Math.floor(data.offset)) : 0
1086  const isNew = !traceReq || traceReq.run !== run || traceReq.zoom !== zoom
1087  const lane = typeof data.lane === 'string' && data.lane ? data.lane : undefined
1088  const query = typeof data.query === 'string' && data.query.trim() ? data.query.slice(0, 80) : undefined
1089  traceReq = { run, zoom, offset, ...(lane ? { lane } : {}), ...(query ? { query } : {}) }
1090  const isLive = await buildRunTrace($, isNew)
1091  if (isLive) tracer ??= $.clock.every(2000, () => void refreshTrace($))
1092}
1093
1094async function refreshTrace($: Engine) {
1095  if (!traceReq) { tracer?.cancel(); tracer = undefined; return }
1096  const isLive = await buildRunTrace($, true)
1097  await update($, traceSeq, s => ({ seq: (s?.seq ?? 0) + 1 }))
1098  // a run that has ended is read once more, then left alone
1099  if (!isLive) { tracer?.cancel(); tracer = undefined }
1100}
1101
1102// Builds the asked run's trace (all rows when `force` or new), then its window.
1103// Resolves whether the run is still going.
1104async function buildRunTrace($: Engine, force: boolean): Promise<boolean> {
1105  const req = traceReq
1106  if (!req) return false
1107  const now = await $.clock.now()
1108  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
1109  // a finished run can sit in both lists for a moment: the live copy wins
1110  const byId = new Map<string, AgentNode>()
1111  for (const n of [...history, ...(await read($, nodes))]) byId.set(n.id, n)
1112  const all = [...byId.values()]
1113  const run = byId.get(req.run)
1114  if (!run) { traceSnap = undefined; return false }
1115  const scope = scopeNodes(all, { kind: 'node', id: run.id })
1116  const isLive = scope.some(n => n.status === 'running')
1117  const key = `${req.run}|${req.zoom}`
1118  if (force || !traceBuilt || traceBuilt.key !== key) traceBuilt = { key, at: now, ...await runTrace($, run, scope, all, req.zoom, now) }
1119  // one lane only, when asked: its rows and the arrows into and out of it
1120  const laneAt = req.lane ? traceBuilt.lanes.findIndex(L => L.id === req.lane) : -1
1121  const cut = laneAt >= 0 ? onlyLane(traceBuilt.rows, traceBuilt.lanes, laneAt) : { rows: traceBuilt.rows, lanes: traceBuilt.lanes }
1122  const win = traceWindow(cut.rows, req.offset, TRACE_WINDOW)
1123  traceSnap = {
1124    run: run.id, zoom: req.zoom, lanes: cut.lanes, total: cut.rows.length, offset: win.offset, rows: win.rows.map(trimRow), missing: traceBuilt.missing,
1125    ...(traceBuilt.storyBy ? { storyBy: traceBuilt.storyBy } : {}),
1126    ...(laneAt >= 0 ? { lane: req.lane } : {}),
1127    marks: traceMarks(cut.rows),
1128    ...(req.query ? { query: req.query, hits: traceHits(cut.rows, req.query) } : {}),
1129  }
1130  return isLive
1131}
1132
1133// A run's whole trace at a zoom, read from its agents' transcripts.
1134async function runTrace($: Engine, run: AgentNode, scope: AgentNode[], all: AgentNode[], zoom: TraceZoom, now: number) {
1135  const agents = scope.filter(n => n.kind === 'agent')
1136  await locateTranscripts($, agents, all)
1137  const events = new Map<string, TraceEvent[]>()
1138  for (const a of agents) {
1139    const path = transcriptAt.get(a.id)
1140    const got = path ? await transcriptEvents($, a.id, path, a.status === 'running', now) : undefined
1141    if (got) events.set(a.id, got)
1142  }
1143  const stories = new Map(agents.flatMap(a => (a.story?.steps.length ? [[a.id, a.story.steps] as [string, string[]]] : [])))
1144  const storyTokens = agents.reduce((sum, a) => sum + (a.story?.tokens ?? 0), 0)
1145  const storyBy = zoom === 'story' && stories.size ? `${TIER_NAME.haiku}${storyTokens ? ` · ${kTokens(storyTokens)} tokens` : ''}` : undefined
1146  return { ...buildTrace(run, scope, events, now, zoom, stories), ...(storyBy ? { storyBy } : {}) }
1147}
1148
1149// ── x: a run's timeline or trace, saved as a picture ──────────────────────────
1150// SVG always; PNG beside it when rsvg-convert is installed. ImageMagick is not used:
1151// a build without Freetype drops the text of an SVG.
1152const PICTURE_W = 1100
1153let exported: { seq: number; text: string } | undefined
1154
1155async function exportPicture($: Engine, runId: string, lens: 'timeline' | 'trace', zoom: TraceZoom, focus?: string) {
1156  const now = await $.clock.now()
1157  const history = ((await $.store.get(HISTORY)) as AgentNode[] | undefined) ?? []
1158  const byId = new Map<string, AgentNode>()
1159  for (const n of [...history, ...(await read($, nodes))]) byId.set(n.id, n)
1160  const all = [...byId.values()]
1161  const run = byId.get(runId)
1162  if (!run) return
1163  const t = DESK[themeName]
1164  const scope = scopeNodes(all, { kind: 'node', id: run.id })
1165  const agents = scope.filter(n => n.kind === 'agent')
1166  const end = Math.max(run.endedAt ?? now, ...agents.map(a => (a.status === 'running' ? now : a.endedAt ?? now)))
1167  const when = new Date(run.startedAt)
1168  const stamp = `${when.getFullYear()}-${String(when.getMonth() + 1).padStart(2, '0')}-${String(when.getDate()).padStart(2, '0')}-${String(when.getHours()).padStart(2, '0')}${String(when.getMinutes()).padStart(2, '0')}`
1169  const subtitle = `${when.toLocaleString('en-US', { dateStyle: 'medium', timeStyle: 'short' })} · ${agents.length} agent${agents.length === 1 ? '' : 's'} · ${pictureDuration(end - run.startedAt)}`
1170  let svg: string
1171  if (lens === 'timeline') {
1172    const path = criticalPath(agents, now)
1173    const idle = idleGaps(agents, now)
1174    const onPath = new Set(path?.ids ?? [])
1175    const bars: TimeBar[] = timelineRows(run, all, [], 'all').map(r => (r.kind === 'label'
1176      ? { label: r.text, start: 0, end: 0, status: 'done' as const, isHeader: true }
1177      : { label: r.node.label, start: r.node.startedAt, end: r.node.status === 'running' ? now : r.node.endedAt ?? now, status: r.node.status, isCritical: onPath.has(r.node.id) }))
1178    const real = bars.filter(b => !b.isHeader)
1179    if (!real.length) return note($, 'Nothing to draw: this run has no agents.')
1180    const from = Math.min(...real.map(b => b.start))
1181    const to = Math.max(...real.map(b => b.end))
1182    const inner = timelineSvg(t, bars, from, to, PICTURE_W, { idle: idle.gaps })
1183    const legend = [...(path && path.ids.length ? [`outlined: critical path (${path.ids.length})`] : []), ...(idle.ms ? [`shaded: idle ${pictureDuration(idle.ms)}`] : [])]
1184    svg = pictureSvg(t, `${run.label} — timeline`, subtitle, legend, inner, PICTURE_W, timelineHeight(bars.length))
1185  } else {
1186    const built = await runTrace($, run, scope, all, zoom, now)
1187    if (!built.rows.length) return note($, 'Nothing to draw: no steps were recorded for this run.')
1188    const timed = built.rows.filter(r => r.at > 0)
1189    const from = Math.min(...timed.map(r => r.at))
1190    const to = Math.max(...timed.map(r => r.end ?? r.at))
1191    const marks = built.rows.map(r => ({ lane: r.lane, ...(r.to !== undefined ? { to: r.to } : {}), at: r.at || from, kind: r.kind, text: r.text }))
1192    const at = focus ? built.lanes.findIndex(L => L.id === focus) : -1
1193    const inner = traceSvg(t, built.lanes, marks, from, to, PICTURE_W, at >= 0 ? at : undefined)
1194    svg = pictureSvg(t, `${run.label} — trace`, `${subtitle} · ${zoom} zoom`, ['● call · ◆ edit · ✕ ended', 'arrow: started or handed back', 'dashed arrow: message'], inner, PICTURE_W, 24 + built.lanes.length * 40 + 8)
1195  }
1196  const home = await $.env.get('HOME')
1197  const base = `${home ?? '.'}/Downloads/agent-tree/${slug(run.label)}-${lens}-${stamp}`
1198  try {
1199    await $.fs.write(`${base}.svg`, svg)
1200  } catch {
hooks/theme.ts 199 lines
1import type { AgentNode, NodeStatus } from '../types'
2
3// Four looks, chosen in /config: minimal works on every terminal (plain Unicode,
4// one accent); kitty, fish and dog are playful (emoji, which take two cells), each
5// telling one small story: cats out exploring, lines cast for a catch, dogs on walks.
6// Running wears the theme's accent and done is calm, so a live run looks like its theme;
7// warn means "needs a look". Every status has its own icon, so none rests on red vs green.
8export type ThemeName = 'kitty' | 'fish' | 'dog' | 'minimal'
9export const THEME_NAMES: readonly ThemeName[] = ['minimal', 'kitty', 'fish', 'dog']
10
11export type Palette = {
12  ink: string; soft: string; muted: string; faint: string; rule: string; frame: string
13  accent: string; selBg: string; ok: string; warn: string; bad: string; add: string; del: string
14}
15
16export type Theme = {
17  name: ThemeName
18  c: Palette
19  status: Record<NodeStatus, { icon: string; word: string; color: string }>
20  // the running glyph's second frame, so a live row breathes
21  runningAlt: string
22  // One glyph per row means status. A second one appears only for what holds
23  // others (a workflow, a cluster) and for files; a plain agent gets none.
24  kind: { workflow: string; group: string; file: string }
25  bar: { full: string; empty: string }
26  // the mark on a warning: a quiet agent, a file two agents edited
27  warn: string
28  fold: { open: string; closed: string }
29  cursor: string
30  words: { live: string; history: string; emptyLive: string; emptyHistory: string; emptyHint: string }
31  // A trace's lanes: one hue per agent, kept apart from the status colours, which mean state.
32  lanes: string[]
33  // the mark a failed agent leaves in its trace lane (kitty's takes two cells)
34  traceFail: string
35  // the words a quiet gap reads in a trace
36  quiet: string
37}
38
39const MINIMAL: Theme = {
40  name: 'minimal',
41  c: {
42    ink: '#d4d7de', soft: '#b3b8c3', muted: '#8a909c', faint: '#5c626d', rule: '#3a3f48', frame: '#4a505b',
43    accent: '#7aa2f7', selBg: '#2a2f38', ok: '#9ece6a', warn: '#e0af68', bad: '#f7768e', add: '#9ece6a', del: '#f7768e',
44  },
45  status: {
46    running: { icon: '●', word: 'Running', color: '#7aa2f7' },
47    done: { icon: '✓', word: 'Done', color: '#8a909c' },
48    failed: { icon: '✗', word: 'Failed', color: '#f7768e' },
49    killed: { icon: '■', word: 'Stopped', color: '#8a909c' },
50  },
51  runningAlt: '○',
52  kind: { workflow: '◆', group: '◇', file: '·' },
53  bar: { full: '▰', empty: '▱' },
54  warn: '⚠',
55  fold: { open: '▾', closed: '▸' },
56  cursor: '▌',
57  words: {
58    live: 'Running', history: 'Finished',
59    emptyLive: 'Nothing is running right now.', emptyHistory: 'No finished runs yet.',
60    emptyHint: 'Subagents and workflows appear here while they run, then move to History.',
61  },
62  lanes: ['#7aa2f7', '#bb9af7', '#7dcfff', '#73daca', '#ff9e64', '#c0caf5'],
63  traceFail: '✗',
64  quiet: 'quiet',
65}
66
67const KITTY: Theme = {
68  name: 'kitty',
69  c: {
70    ink: '#f4e4d8', soft: '#e3c9b8', muted: '#b8968a', faint: '#7a5f62', rule: '#4a3346', frame: '#ff8f70',
71    accent: '#ff8f70', selBg: '#3d2838', ok: '#a6d189', warn: '#f5c27a', bad: '#f38ba8', add: '#a6d189', del: '#f38ba8',
72  },
73  status: {
74    running: { icon: '🐱', word: 'Running', color: '#ff8f70' },
75    done: { icon: '😺', word: 'Done', color: '#b8968a' },
76    failed: { icon: '😿', word: 'Failed', color: '#f38ba8' },
77    killed: { icon: '🙀', word: 'Stopped', color: '#b8968a' },
78  },
79  runningAlt: '🐈',
80  kind: { workflow: '🧶', group: '🐾', file: '🧾' },
81  bar: { full: '▰', empty: '▱' },
82  warn: '⚠',
83  fold: { open: '▾', closed: '▸' },
84  cursor: '▌',
85  words: {
86    live: 'Out exploring', history: 'Back home',
87    emptyLive: 'ᓚᘏᗢ zzz · No cats out.', emptyHistory: 'No cats have come home yet.',
88    emptyHint: 'Subagents and workflows (🧶) appear here while they run, then move to History.',
89  },
90  lanes: ['#ff8f70', '#c9a0dc', '#89dceb', '#94e2d5', '#fab387', '#f5e0dc'],
91  traceFail: '😿',
92  quiet: 'ᓚᘏᗢ zzz',
93}
94
95// Lines cast for a catch: lake blues, a fin-orange frame. A failure got away.
96const FISH: Theme = {
97  name: 'fish',
98  c: {
99    ink: '#dcebf3', soft: '#b5cfdc', muted: '#86a5b5', faint: '#56748a', rule: '#22394b', frame: '#4fb3d9',
100    accent: '#4fb3d9', selBg: '#173042', ok: '#8bd5a0', warn: '#f2c26b', bad: '#f28b82', add: '#8bd5a0', del: '#f28b82',
101  },
102  status: {
103    running: { icon: '🎣', word: 'Running', color: '#4fb3d9' },
104    done: { icon: '🐟', word: 'Done', color: '#86a5b5' },
105    failed: { icon: '🐡', word: 'Failed', color: '#f28b82' },
106    killed: { icon: '🪝', word: 'Stopped', color: '#86a5b5' },
107  },
108  runningAlt: '🌊',
109  kind: { workflow: '🛶', group: '🐠', file: '🧾' },
110  bar: { full: '▰', empty: '▱' },
111  warn: '⚠',
112  fold: { open: '▾', closed: '▸' },
113  cursor: '▌',
114  words: {
115    live: 'Out fishing', history: 'The catch',
116    emptyLive: '><(((º> · Lines are dry.', emptyHistory: 'Nothing in the bucket yet.',
117    emptyHint: 'Subagents and workflows (🛶) appear here while they run, then move to History.',
118  },
119  lanes: ['#4fb3d9', '#b4a0f0', '#7fdbd0', '#f29b38', '#e6a5c8', '#c9d6df'],
120  traceFail: '🐡',
121  quiet: '><> zzz',
122}
123
124// Dogs out on walks, back with what they fetched: golden tan and warm browns.
125const DOG: Theme = {
126  name: 'dog',
127  c: {
128    ink: '#f3e6d6', soft: '#dcc6ad', muted: '#b09a82', faint: '#77634f', rule: '#43352a', frame: '#e6a85a',
129    accent: '#e6a85a', selBg: '#3a2d22', ok: '#a6d189', warn: '#f5d76e', bad: '#f08a7a', add: '#a6d189', del: '#f08a7a',
130  },
131  status: {
132    running: { icon: '🐕', word: 'Running', color: '#e6a85a' },
133    done: { icon: '🐶', word: 'Done', color: '#b09a82' },
134    failed: { icon: '🥺', word: 'Failed', color: '#f08a7a' },
135    killed: { icon: '🦴', word: 'Stopped', color: '#b09a82' },
136  },
137  runningAlt: '🦮',
138  kind: { workflow: '🎾', group: '🐾', file: '🧾' },
139  bar: { full: '▰', empty: '▱' },
140  warn: '⚠',
141  fold: { open: '▾', closed: '▸' },
142  cursor: '▌',
143  words: {
144    live: 'Out on walks', history: 'Fetched',
145    emptyLive: 'U・ᴥ・U zzz · No dogs out.', emptyHistory: 'No dogs are back from walks yet.',
146    emptyHint: 'Subagents and workflows (🎾) appear here while they run, then move to History.',
147  },
148  lanes: ['#e6a85a', '#9fb7e8', '#7fcfb8', '#d9a0c8', '#c8e04a', '#d6c8b8'],
149  traceFail: '🥺',
150  quiet: 'U-ᴥ-U zzz',
151}
152
153export const THEMES: Record<ThemeName, Theme> = { minimal: MINIMAL, kitty: KITTY, fish: FISH, dog: DOG }
154// An unknown name (an old setting, a typo) falls back to minimal.
155export const themeNameOf = (name: unknown): ThemeName =>
156  THEME_NAMES.includes(name as ThemeName) ? (name as ThemeName) : 'minimal'
157export const themeOf = (name: unknown): Theme => THEMES[themeNameOf(name)]
158
159// The glyph a row shows for what a node is: only what holds others has one.
160export function kindGlyph(t: Theme, n: Pick<AgentNode, 'kind'>): string {
161  if (n.kind === 'workflow') return t.kind.workflow
162  if (n.kind === 'group') return t.kind.group
163  return ''
164}
165
166// ── display width: how many terminal cells a string takes ──────────────────
167const ZERO = (cp: number) => (cp >= 0x300 && cp <= 0x36f) || cp === 0x200d || (cp >= 0xfe00 && cp <= 0xfe0f)
168const WIDE = (cp: number) =>
169  cp >= 0x1f000 ||
170  (cp >= 0x1100 && cp <= 0x115f) || (cp >= 0x2e80 && cp <= 0xa4cf) || (cp >= 0xac00 && cp <= 0xd7a3) ||
171  (cp >= 0xf900 && cp <= 0xfaff) || (cp >= 0xfe30 && cp <= 0xfe4f) || (cp >= 0xff00 && cp <= 0xff60) || (cp >= 0xffe0 && cp <= 0xffe6)
172
173export function cellWidth(s: string): number {
174  let w = 0
175  for (const ch of s) {
176    const cp = ch.codePointAt(0)!
177    w += ZERO(cp) ? 0 : WIDE(cp) ? 2 : 1
178  }
179  return w
180}
181
182// Cut to a width in cells, ending with … when anything was cut.
183export function fit(s: string, width: number): string {
184  if (width <= 0) return ''
185  if (cellWidth(s) <= width) return s
186  let out = ''
187  let w = 0
188  for (const ch of s) {
189    const cw = cellWidth(ch)
190    if (w + cw > width - 1) break
191    out += ch
192    w += cw
193  }
194  return out + '…'
195}
196
197export const padEnd = (s: string, width: number) => s + ' '.repeat(Math.max(0, width - cellWidth(s)))
198export const padStart = (s: string, width: number) => ' '.repeat(Math.max(0, width - cellWidth(s))) + s
199
hooks/list.ts 681 lines
1import type { Act, AgentNode, EditRecord } from '../types'
2
3// Subagents are cats, workflow agents sea creatures, a workflow its lead creature.
4export type Species = 'cat' | 'sea' | 'school'
5export const speciesOf = (n: Pick<AgentNode, 'kind'>, inWorkflow: boolean): Species =>
6  n.kind !== 'agent' ? 'school' : inWorkflow ? 'sea' : 'cat'
7
8const clip = (s: string, n: number) => (s.length > n ? `${s.slice(0, n - 1)}…` : s)
9const baseName = (p: string) => p.split('/').filter(Boolean).pop() ?? p
10const firstLine = (s: string) => s.split('\n')[0]?.trim() ?? ''
11const hostOf = (url: string) => /^[a-z]+:\/\/([^/]+)/i.exec(url)?.[1] ?? url
12const plural = (n: number, one: string, many = `${one}s`) => `${n} ${n === 1 ? one : many}`
13
14// What a tool call is doing, as a sentence a person reads, and the prop the icon holds.
15export function describeTool(tool: string, input: Record<string, unknown>): { act: Act; activity: string } {
16  const s = (k: string) => (typeof input[k] === 'string' ? (input[k] as string) : '')
17  switch (tool) {
18    case 'Read': return { act: 'read', activity: `Reading ${baseName(s('file_path'))}` }
19    case 'Grep': return { act: 'read', activity: `Searching the code for "${clip(s('pattern'), 32)}"` }
20    case 'Glob': return { act: 'read', activity: `Looking for files matching ${clip(s('pattern'), 32)}` }
21    case 'LS': return { act: 'read', activity: `Listing ${baseName(s('path'))}` }
22    case 'ToolSearch': return { act: 'read', activity: 'Looking up tools' }
23    case 'LSP': return { act: 'read', activity: 'Asking the language server' }
24    case 'Edit':
25    case 'MultiEdit': return { act: 'write', activity: `Editing ${baseName(s('file_path'))}` }
26    case 'Write': return { act: 'write', activity: `Writing ${baseName(s('file_path'))}` }
27    case 'NotebookEdit': return { act: 'write', activity: `Editing ${baseName(s('notebook_path'))}` }
28    // a Bash call's own description says what it does in words; the command is the fallback
29    case 'Bash': return { act: 'run', activity: s('description') ? clip(s('description'), 60) : `Running ${clip(firstLine(s('command')), 40)}` }
30    case 'Monitor': return { act: 'run', activity: 'Watching a process' }
31    case 'Agent':
32    case 'Task': return { act: 'run', activity: `Handing off: ${clip(s('description'), 36)}` }
33    case 'Workflow': return { act: 'run', activity: 'Starting a workflow' }
34    case 'WebFetch': return { act: 'web', activity: `Reading ${hostOf(s('url'))}` }
35    case 'WebSearch': return { act: 'web', activity: `Searching the web for "${clip(s('query'), 30)}"` }
36  }
37  const mcp = /^mcp__(.+?)__(.+)$/.exec(tool)
38  if (mcp) return { act: 'web', activity: `Calling ${mcp[1]?.replace(/^claude_ai_/, '')} · ${mcp[2]?.replace(/_/g, ' ')}` }
39  return { act: 'think', activity: `Using ${tool}` }
40}
41
42const EDIT_TOOLS = new Set(['Edit', 'MultiEdit', 'Write', 'NotebookEdit'])
43export const editedPath = (tool: string, input: Record<string, unknown>): string | undefined => {
44  if (!EDIT_TOOLS.has(tool)) return undefined
45  const p = input.file_path ?? input.notebook_path
46  return typeof p === 'string' ? p : undefined
47}
48
49// "Read 3 files, edited 1, ran 2 commands": what an agent did, from its tool counts.
50export function workSummary(n: Pick<AgentNode, 'work' | 'changes' | 'tools'>): string {
51  const w = n.work ?? {}
52  const edited = Object.keys(n.changes ?? {}).length
53  const parts = [
54    w.read ? `read ${plural(w.read, 'file')}` : '',
55    edited ? `edited ${plural(edited, 'file')}` : '',
56    w.run ? `ran ${plural(w.run, 'command')}` : '',
57    w.web ? `${plural(w.web, 'web call')}` : '',
58  ].filter(Boolean)
59  if (parts.length === 0) return n.tools ? plural(n.tools, 'tool call') : 'No tools used'
60  const s = parts.join(', ')
61  return s[0]!.toUpperCase() + s.slice(1)
62}
63
64const lineCount = (s: unknown) => (typeof s === 'string' && s.length > 0 ? s.split('\n').length : 0)
65
66// What one edit did to one file, in lines, like a diffstat.
67export function editStats(tool: string, input: Record<string, unknown>): { path: string; added: number; removed: number } | undefined {
68  const path = editedPath(tool, input)
69  if (!path) return undefined
70  if (tool === 'Edit') return { path, added: lineCount(input.new_string), removed: lineCount(input.old_string) }
71  if (tool === 'MultiEdit') {
72    const edits = Array.isArray(input.edits) ? (input.edits as { old_string?: unknown; new_string?: unknown }[]) : []
73    return { path, added: edits.reduce((a, e) => a + lineCount(e.new_string), 0), removed: edits.reduce((a, e) => a + lineCount(e.old_string), 0) }
74  }
75  if (tool === 'Write') return { path, added: lineCount(input.content), removed: 0 }
76  return { path, added: lineCount(input.new_source), removed: 0 }
77}
78
79export type FileRow = { path: string; added: number; removed: number; edits: number; by: { node: AgentNode; added: number; removed: number; edits: number }[] }
80
81// Every file the given agents changed, with who changed it: the trail from a file back to its agents.
82export function fileRows(scope: AgentNode[]): FileRow[] {
83  const rows = new Map<string, FileRow>()
84  for (const n of scope) {
85    for (const [path, c] of Object.entries(n.changes ?? {})) {
86      const row = rows.get(path) ?? { path, added: 0, removed: 0, edits: 0, by: [] }
87      row.added += c.added
88      row.removed += c.removed
89      row.edits += c.edits
90      row.by.push({ node: n, ...c })
91      rows.set(path, row)
92    }
93  }
94  return [...rows.values()].sort((a, b) => b.added + b.removed - (a.added + a.removed) || a.path.localeCompare(b.path))
95}
96
97// Paths shown relative to what they share, so "hooks/view.tsx", not a 90-column absolute path.
98export function shortPaths(paths: string[]): Map<string, string> {
99  const split = paths.map(p => p.split('/'))
100  let common = 0
101  if (split.length > 0) {
102    const first = split[0]!
103    while (common < first.length - 1 && split.every(s => s.length - 1 > common && s[common] === first[common])) common++
104  }
105  // keep one directory of context when every file sits in the same folder
106  const keep = Math.max(0, Math.min(common, ...split.map(s => s.length - 2)))
107  return new Map(paths.map((p, i) => [p, split[i]!.slice(paths.length === 1 ? Math.max(0, split[i]!.length - 2) : keep).join('/')]))
108}
109
110export const diffstat = (added: number, removed: number) => `+${added} −${removed}`
111
112export type DiffLine = { op: ' ' | '+' | '-'; text: string; oldNo?: number; newNo?: number }
113
114// A line diff of one edit's before and after, numbered from where it sits in the
115// file: a longest-common-subsequence walk, as `diff` does, so context lines the edit
116// repeated are context, not a removal and an addition.
117export function lineDiff(before: string, after: string, start = 1): DiffLine[] {
118  const a = before ? before.split('\n') : []
119  const b = after ? after.split('\n') : []
120  const out: DiffLine[] = []
121  if (a.length * b.length > 400_000) {
122    a.forEach((text, i) => out.push({ op: '-', text, oldNo: start + i }))
123    b.forEach((text, i) => out.push({ op: '+', text, newNo: start + i }))
124    return out
125  }
126  const lcs: number[][] = Array.from({ length: a.length + 1 }, () => new Array<number>(b.length + 1).fill(0))
127  for (let i = a.length - 1; i >= 0; i--) {
128    for (let j = b.length - 1; j >= 0; j--) {
129      lcs[i]![j] = a[i] === b[j] ? lcs[i + 1]![j + 1]! + 1 : Math.max(lcs[i + 1]![j]!, lcs[i]![j + 1]!)
130    }
131  }
132  let i = 0
133  let j = 0
134  while (i < a.length || j < b.length) {
135    if (i < a.length && j < b.length && a[i] === b[j]) { out.push({ op: ' ', text: a[i]!, oldNo: start + i, newNo: start + j }); i++; j++ }
136    // removals before additions, as diff prints them
137    else if (i < a.length && (j >= b.length || lcs[i + 1]![j]! >= lcs[i]![j + 1]!)) { out.push({ op: '-', text: a[i]!, oldNo: start + i }); i++ }
138    else { out.push({ op: '+', text: b[j]!, newNo: start + j }); j++ }
139  }
140  return out
141}
142
143export const diffCounts = (lines: DiffLine[]) => ({
144  added: lines.filter(l => l.op === '+').length,
145  removed: lines.filter(l => l.op === '-').length,
146})
147
148// What one tool call wrote, as before/after text and where it sits: one record per
149// change, so a file's diff can be told edit by edit, each with the agent that made it.
150export function editRecords(tool: string, input: Record<string, unknown>, before: string | undefined, after: string | undefined): { path: string; old: string; new: string; line: number; isNew?: boolean }[] {
151  const path = editedPath(tool, input)
152  if (!path) return []
153  const lineOf = (text: string) => {
154    const at = after && text ? after.indexOf(text) : -1
155    return at < 0 ? 1 : after!.slice(0, at).split('\n').length
156  }
157  const str = (x: unknown) => (typeof x === 'string' ? x : '')
158  if (tool === 'Edit') return [{ path, old: str(input.old_string), new: str(input.new_string), line: lineOf(str(input.new_string)) }]
159  if (tool === 'MultiEdit') {
160    const edits = Array.isArray(input.edits) ? (input.edits as { old_string?: unknown; new_string?: unknown }[]) : []
161    return edits.map(e => ({ path, old: str(e.old_string), new: str(e.new_string), line: lineOf(str(e.new_string)) }))
162  }
163  if (tool === 'Write') return [{ path, old: before ?? '', new: str(input.content), line: 1, isNew: before === undefined }]
164  return [{ path, old: '', new: str(input.new_source), line: 1 }]
165}
166
167// "Draft  2 done  →  Refine  1 running": a workflow's phases in words.
168export function phaseWords(p: { phase: string; total: number; running: number; done: number; failed: number; stopped: number }): string {
169  const parts = [
170    p.running ? `${p.running} running` : '',
171    p.done ? `${p.done} done` : '',
172    p.failed ? `${p.failed} failed` : '',
173    p.stopped ? `${p.stopped} stopped` : '',
174  ].filter(Boolean)
175  return parts.join(', ') || 'waiting'
176}
177
178// The heading over a run's own answer: it says so when the pane keeps only its start.
179export function reportHeading(n: AgentNode): string {
180  const whole = n.kind === 'workflow' ? 'Final result' : 'Full report'
181  const shown = n.result?.length ?? 0
182  if (!n.resultLength || n.resultLength <= shown) return whole
183  return `${n.kind === 'workflow' ? 'Final result' : 'Report'} (first ${shown} of ${n.resultLength.toLocaleString('en-US')} characters)`
184}
185
186// A workflow's return value is often JSON: its strings, joined, read better than its braces.
187export function readableResult(s: string | undefined): string {
188  if (!s) return ''
189  const t = s.trim()
190  if (!t.startsWith('{') && !t.startsWith('[')) return plain(t)
191  try {
192    const strings: string[] = []
193    const walk = (v: unknown) => {
194      if (typeof v === 'string') strings.push(v)
195      else if (Array.isArray(v)) v.forEach(walk)
196      else if (v && typeof v === 'object') Object.values(v).forEach(walk)
197    }
198    walk(JSON.parse(t))
199    return plain(strings.join(' '))
200  } catch { return plain(t) }
201}
202
203export function changesLine(rows: readonly FileRow[]): string {
204  if (rows.length === 0) return 'No files changed'
205  const added = rows.reduce((a, r) => a + r.added, 0)
206  const removed = rows.reduce((a, r) => a + r.removed, 0)
207  return `Changed ${plural(rows.length, 'file')} (${diffstat(added, removed)})`
208}
209
210// A workflow's phases in order with their agents' counts: "Explore ✓3 → Verify ●2 ✓1".
211export function pipeline(wf: AgentNode, nodes: AgentNode[]) {
212  const kids = nodes.filter(n => n.parentId === wf.id)
213  const order = [...(wf.phases ?? [])]
214  for (const k of kids) if (!order.includes(k.phase ?? 'Agents')) order.push(k.phase ?? 'Agents')
215  return order.map(phase => ({ phase, ...counts(kids.filter(k => (k.phase ?? 'Agents') === phase)) }))
216}
217
218// The agents a scope covers: a run with everything under it, one phase, or one agent and its own subagents.
219export function scopeNodes(nodes: AgentNode[], scope: { kind: 'node'; id: string } | { kind: 'phase'; wfId: string; phase: string }): AgentNode[] {
220  if (scope.kind === 'phase') return nodes.filter(n => n.parentId === scope.wfId && (n.phase ?? 'Agents') === scope.phase)
221  const under = (id: string): AgentNode[] => nodes.filter(n => n.parentId === id).flatMap(k => [k, ...under(k.id)])
222  const root = nodes.find(n => n.id === scope.id)
223  return root ? [root, ...under(root.id)] : []
224}
225
226// ── emoji: a cat for a subagent; a workflow agent's own sea creature, fixed by its id ──
227const SEA = ['🐡', '🐠', '🐙', '🐟']
228const hash = (s: string) => {
229  let h = 2166136261
230  for (let i = 0; i < s.length; i++) h = Math.imul(h ^ s.charCodeAt(i), 16777619)
231  return h >>> 0
232}
233export const markFor = (n: Pick<AgentNode, 'id' | 'kind'>, inWorkflow: boolean): string =>
234  n.kind === 'workflow' ? '🌊' : n.kind === 'group' ? '🐾' : inWorkflow ? SEA[hash(n.id) % SEA.length]! : '🐱'
235
236// Markdown to one plain line: headings, emphasis, code marks, links and list bullets go.
237export function plain(s: string | undefined): string {
238  return (s ?? '')
239    .replace(/```[\s\S]*?```/g, ' ')
240    .replace(/^\s{0,3}#{1,6}\s+/gm, '')
241    .replace(/^\s*[-*+]\s+/gm, '')
242    .replace(/^\s*\d+\.\s+/gm, '')
243    .replace(/\[([^\]]+)\]\([^)]+\)/g, '$1')
244    .replace(/(\*\*|__|\*|_|`)/g, '')
245    .replace(/\s+/g, ' ')
246    .trim()
247}
248
249export const firstSentence = (s: string | undefined, max = 140) => {
250  const p = plain(s)
251  const m = /^(.+?[.!?])(\s|$)/.exec(p)
252  return clip(m?.[1] ?? p, max)
253}
254
255export function prettyModel(m: string | undefined): string | undefined {
256  if (!m) return undefined
257  const x = /(haiku|sonnet|opus|fable)(?:-(\d+)-(\d+))?/i.exec(m)
258  if (!x) return m
259  const name = x[1]![0]!.toUpperCase() + x[1]!.slice(1).toLowerCase()
260  return x[2] ? `${name} ${x[2]}.${x[3]}` : name
261}
262
263export function prettyType(n: Pick<AgentNode, 'kind' | 'type'>, inWorkflow: boolean): string {
264  if (n.kind === 'workflow') return 'Workflow'
265  if (n.kind === 'group') return 'Agent group'
266  const t = n.type
267  if (!t) return inWorkflow ? 'Workflow agent' : 'Agent'
268  const name = t.includes(':') ? t.split(':').pop()! : t
269  const words = name.replace(/[-_]/g, ' ')
270  return `${words[0]!.toUpperCase()}${words.slice(1)} agent`
271}
272
273export const whereLabel = (w: AgentNode['where']) =>
274  w === 'worktree' ? 'Own worktree' : w === 'remote' ? 'Remote' : 'Main checkout'
275
276export type JournalEntry = { agentId: string; label?: string; phase?: string; isDone: boolean }
277
278// A workflow run's journal.jsonl: a `started` line per agent (id, label, phase), a `result` line as each ends.
279export function parseJournal(text: string): JournalEntry[] {
280  const byId = new Map<string, JournalEntry>()
281  for (const line of text.split('\n')) {
282    if (!line.trim()) continue
283    let row: { type?: unknown; agentId?: unknown; label?: unknown; phase?: unknown }
284    try { row = JSON.parse(line) } catch { continue }
285    if (typeof row.agentId !== 'string') continue
286    const cur = byId.get(row.agentId) ?? { agentId: row.agentId, isDone: false }
287    if (row.type === 'started') {
288      if (typeof row.label === 'string') cur.label = row.label
289      if (typeof row.phase === 'string') cur.phase = row.phase
290    } else if (row.type === 'result') {
291      cur.isDone = true
292    }
293    byId.set(row.agentId, cur)
294  }
295  return [...byId.values()]
296}
297
298// The task an agent was given. A workflow agent's transcript opens with harness
299// frames: the relayed user request (skipped: it is the user's, not the agent's
300// task) and the computed task, whose text follows "follows:" indented two spaces.
301export function firstPrompt(jsonl: string): string | undefined {
302  for (const line of jsonl.split('\n').slice(0, 20)) {
303    let row: { message?: { role?: unknown; content?: unknown } }
304    try { row = JSON.parse(line) } catch { continue }
305    const m = row.message
306    if (m?.role !== 'user') continue
307    const text = typeof m.content === 'string'
308      ? m.content
309      : Array.isArray(m.content)
310        ? m.content.map(b => (b && typeof b === 'object' && 'text' in b ? String(b.text) : '')).join('\n').trim()
311        : ''
312    if (!text) continue
313    if (text.startsWith('[Workflow harness — user request]')) continue
314    if (text.startsWith('[Workflow harness')) {
315      const body = text.split(/follows:\s*\n/)[1]
316      return body ? body.split('\n').map(l => l.replace(/^ {2}/, '')).join('\n').trim() : undefined
317    }
318    return text
319  }
320  return undefined
321}
322
323// A digest reply: JSON with an outcome sentence and up to three points, tolerating fences and chatter.
324export function parseDigest(raw: string): { outcome?: string; points?: string[] } | undefined {
325  const json = /\{[\s\S]*\}/.exec(raw)?.[0]
326  if (!json) return undefined
327  try {
328    const d = JSON.parse(json) as { outcome?: unknown; points?: unknown }
329    const outcome = typeof d.outcome === 'string' ? plain(d.outcome).slice(0, 300) : undefined
330    const points = Array.isArray(d.points) ? d.points.filter((p): p is string => typeof p === 'string').map(p => plain(p).slice(0, 120)).slice(0, 3) : undefined
331    return { outcome, points }
332  } catch { return undefined }
333}
334
335// The report an agent handed back. Agents that end with a SubagentHandback call
336// leave no final text, so their report is that call's message; otherwise it is
337// the last text the agent wrote.
338export function handbackOf(transcript: string): string | undefined {
339  const lines = transcript.split('\n').filter(Boolean)
340  let lastText: string | undefined
341  for (let i = lines.length - 1; i >= 0; i--) {
342    let row: { message?: { role?: string; content?: unknown } }
343    try { row = JSON.parse(lines[i]!) } catch { continue }
344    const content = row.message?.role === 'assistant' && Array.isArray(row.message.content) ? row.message.content : []
345    for (const b of content as { type?: string; name?: string; text?: string; input?: { message?: unknown } }[]) {
346      if (b.type === 'tool_use' && b.name === 'SubagentHandback' && typeof b.input?.message === 'string') return b.input.message
347      if (b.type === 'text' && b.text?.trim() && lastText === undefined) lastText = b.text
348    }
349  }
350  return lastText
351}
352
353// A root folder as Claude Code names its projects folder: every character
354// that is not a letter or digit becomes '-'. Runs compare by this key.
355export const folderKey = (path: string) => path.replace(/[^a-zA-Z0-9]/g, '-')
356export const runKey = (n: { repo?: string; repoKey?: string }) => n.repoKey ?? (n.repo ? folderKey(n.repo) : undefined)
357
358// Why a finished agent has no report, in words, instead of a bare "No report".
359export function noReportReason(n: { status: string }): string {
360  if (n.status === 'running') return 'Still working.'
361  if (n.status === 'failed') return 'Stopped with an error before it reported.'
362  if (n.status === 'killed') return 'Stopped before it reported.'
363  return 'Finished without a written report.'
364}
365
366// Task text as a person reads it: runs recorded before the harness-aware reader kept the frames.
367export function taskText(prompt: string | undefined): string {
368  if (!prompt) return ''
369  if (prompt.startsWith('[Workflow harness — user request]')) return ''
370  if (prompt.startsWith('[Workflow harness')) return plain(prompt.split(/follows:\s*/)[1] ?? '')
371  return plain(prompt)
372}
373
374export function cleanTitle(raw: string): string | undefined {
375  const t = firstLine(raw).replace(/^["'`*#\s]+|["'`*.\s]+$/g, '').replace(/^title:\s*/i, '')
376  return t && t.length <= 80 ? t : undefined
377}
378
379export type Filter = 'all' | 'running' | 'failed'
380export type Group = 'none' | 'type' | 'where' | 'status'
381export const GROUPS: Group[] = ['none', 'type', 'where', 'status']
382export const GROUP_NAMES: Record<Group, string> = { none: 'no grouping', type: 'by type', where: 'by worktree', status: 'by status' }
383
384// A row of the run list or of a run's tree. `guide` is the tree's drawing to the
385// left of the row (├─ └─ │), `fold` a row that holds others and can open or close.
386export type Fold = { key: string; isOpen: boolean }
387export type Item =
388  | { kind: 'node'; node: AgentNode; species: Species; depth: number; guide?: string; fold?: Fold }
389  | { kind: 'phase'; key: string; wfId: string; phase: string; isOpen: boolean; total: number; done: number; failed: number; running: number; stopped: number; guide?: string }
390  | { kind: 'more'; key: string; count: number; guide?: string }
391  // a heading over rows; History's day headings carry a note and Older folds
392  | { kind: 'header'; text: string; count?: number; note?: string; isOpen?: boolean }
393  // a line under a cluster's row: its aspects, a file overlap, its combined outcome
394  | { kind: 'info'; tone: 'chips' | 'warn' | 'outcome'; nodeId: string; guide: string }
395  // a line of a pattern card on the History page: its title, evidence or what to try
396  | { kind: 'pattern'; tone: 'title' | 'evidence' | 'try'; text: string }
397
398export const isSelectable = (it: Item | undefined) => it !== undefined && it.kind !== 'header' && it.kind !== 'info' && it.kind !== 'pattern'
399
400// Live and History as one list. A run that just finished is in both, so each id
401// is kept once, and the live copy wins: it is the newer one.
402export function joinNodes(live: AgentNode[], history: AgentNode[]): AgentNode[] {
403  const seen = new Set(live.map(n => n.id))
404  return [...live, ...history.filter(n => !seen.has(n.id))]
405}
406
407export function childrenOf(nodes: AgentNode[], id: string) {
408  return nodes.filter(n => n.parentId === id)
409}
410
411export function counts(kids: AgentNode[]) {
412  const c = { total: kids.length, running: 0, done: 0, failed: 0, stopped: 0 }
413  for (const k of kids) {
414    if (k.status === 'running') c.running++
415    else if (k.status === 'failed') c.failed++
416    else if (k.status === 'killed') c.stopped++
417    else c.done++
418  }
419  return c
420}
421
422export const passes = (n: AgentNode, kids: AgentNode[], f: Filter) =>
423  f === 'all' ||
424  (f === 'running' && (n.status === 'running' || kids.some(k => k.status === 'running'))) ||
425  (f === 'failed' && (n.status === 'failed' || kids.some(k => k.status === 'failed')))
426
427const DAY = 86_400_000
428export const dayLabel = (t: number, now: number) => {
429  const startOf = (x: number) => { const d = new Date(x); d.setHours(0, 0, 0, 0); return d.getTime() }
430  const diff = Math.round((startOf(now) - startOf(t)) / DAY)
431  if (diff === 0) return 'Today'
432  if (diff === 1) return 'Yesterday'
433  return new Date(t).toLocaleDateString('en-US', { weekday: 'short', month: 'short', day: 'numeric' })
434}
435
436const STATUS_GROUP: Record<AgentNode['status'], string> = { running: 'Running', failed: 'Failed', done: 'Done', killed: 'Stopped' }
437const groupOf = (n: AgentNode, g: Group, now: number): string =>
438  g === 'type' ? prettyType(n, false).replace(/ agent$/, '') + (n.kind !== 'agent' ? 's' : ' agents')
439    : g === 'where' ? whereLabel(n.where)
440      : g === 'status' ? STATUS_GROUP[n.status]
441        : dayLabel(n.startedAt, now)
442
443// The top level: one row per subagent or workflow; a subagent's own subagents sit under it.
444// Live holds what is still running; a finished run moves to History. Rows sit under
445// group headers: the chosen grouping, or the day in History when there is none.
446export function topItems(
447  nodes: AgentNode[], filter: Filter, isHistory: boolean, now: number, group: Group = 'none',
448  flipped: readonly string[] = [], showDone: readonly string[] = [],
449): Item[] {
450  const ids = new Set(nodes.map(n => n.id))
451  const tops = nodes.filter(n => !n.parentId || !ids.has(n.parentId))
452  const sorted = isHistory
453    ? [...tops].sort((a, b) => b.startedAt - a.startedAt)
454    : [...tops].sort((a, b) => a.startedAt - b.startedAt)
455  const shown = sorted.filter(n => {
456    const kids = childrenOf(nodes, n.id)
457    if (!isHistory && n.status !== 'running' && !kids.some(k => k.status === 'running')) return false
458    return passes(n, kids, filter)
459  })
460  const useHeaders = group !== 'none' || isHistory
461  const buckets = new Map<string, AgentNode[]>()
462  for (const n of shown) {
463    const key = useHeaders ? groupOf(n, group, now) : ''
464    buckets.set(key, [...(buckets.get(key) ?? []), n])
465  }
466  const out: Item[] = []
467  for (const [key, list] of buckets) {
468    if (useHeaders) out.push({ kind: 'header', text: key, count: list.length })
469    // folded by default: the run list stays one row per run until one is opened
470    for (const n of list) emitTree(n, nodes, { filter, flipped, showDone }, out, { guide: '', prefix: '', depth: 0, defaultOpen: false })
471  }
472  return out
473}
474
475// ── the tree: a run and everything under it, with guide lines ─────────────
476
477type TreeOpts = { filter: Filter; flipped: readonly string[]; showDone: readonly string[] }
478type At = { guide: string; prefix: string; depth: number; defaultOpen: boolean }
479
480const isOpenNow = (key: string, byDefault: boolean, flipped: readonly string[]) => byDefault !== flipped.includes(key)
481const visibleKids = (nodes: AgentNode[], id: string, f: Filter) =>
482  childrenOf(nodes, id).filter(k => passes(k, childrenOf(nodes, k.id), f)).sort((a, b) => a.startedAt - b.startedAt)
483const branch = (prefix: string, isLast: boolean) => ({ guide: `${prefix}${isLast ? '└─ ' : '├─ '}`, prefix: `${prefix}${isLast ? '   ' : '│  '}` })
484
485// One node, then (when open) its cluster lines and its children: a group's members,
486// a workflow's phases and their agents, an agent's own subagents.
487function emitTree(n: AgentNode, nodes: AgentNode[], o: TreeOpts, out: Item[], at: At): void {
488  const isWorkflow = n.kind === 'workflow'
489  const kids = isWorkflow ? [] : visibleKids(nodes, n.id, o.filter)
490  const hasKids = isWorkflow ? childrenOf(nodes, n.id).length > 0 : kids.length > 0
491  // closed-by-default rows (the run list) and open-by-default rows (inside a run) keep separate keys
492  const key = `${at.defaultOpen ? 'o' : 'c'}:${n.id}`
493  const isOpen = hasKids && isOpenNow(key, at.defaultOpen, o.flipped)
494  out.push({ kind: 'node', node: n, species: speciesOf(n, !!n.phase), depth: at.depth, guide: at.guide, ...(hasKids ? { fold: { key, isOpen } } : {}) })
495  if (!isOpen) return
496  const more = hasKids ? `${at.prefix}│  ` : `${at.prefix}   `
497  if (n.kind === 'group') {
498    // no aspect chips here: the members are the rows right below
499    if (overlaps(scopeNodes(nodes, { kind: 'node', id: n.id }).filter(k => k.id !== n.id)).length) out.push({ kind: 'info', tone: 'warn', nodeId: n.id, guide: more })
500    if (n.summary && n.status !== 'running') out.push({ kind: 'info', tone: 'outcome', nodeId: n.id, guide: more })
501  }
502  if (isWorkflow) return emitPhases(n, nodes, o, out, at)
503  kids.forEach((k, i) => emitTree(k, nodes, o, out, { ...branch(at.prefix, i === kids.length - 1), depth: at.depth + 1, defaultOpen: true }))
504}
505
506// A workflow's phases: one folding row each; a phase with nothing running or failed
507// folds to its row, and finished agents past the first few fold to a "… N done" row.
508function emitPhases(wf: AgentNode, nodes: AgentNode[], o: TreeOpts, out: Item[], at: At): void {
509  const kids = childrenOf(nodes, wf.id).sort((a, b) => a.startedAt - b.startedAt)
510  const order = [...(wf.phases ?? [])]
511  for (const k of kids) if (!order.includes(k.phase ?? 'Agents')) order.push(k.phase ?? 'Agents')
512  const phases = order
513    .map(phase => ({ phase, list: kids.filter(k => (k.phase ?? 'Agents') === phase && passes(k, [], o.filter)) }))
514    .filter(p => p.list.length > 0)
515  phases.forEach(({ phase, list }, pi) => {
516    const c = counts(list)
517    const key = `${wf.id}:${phase}`
518    const isOpen = (c.running > 0 || c.failed > 0) !== o.flipped.includes(key)
519    const b = branch(at.prefix, pi === phases.length - 1)
520    out.push({ kind: 'phase', key, wfId: wf.id, phase, isOpen, ...c, guide: b.guide })
521    if (!isOpen) return
522    const failed = list.filter(k => k.status === 'failed')
523    const running = list.filter(k => k.status === 'running')
524    const done = list.filter(k => k.status !== 'running' && k.status !== 'failed').sort((a, z) => (z.endedAt ?? 0) - (a.endedAt ?? 0))
525    const doneShown = o.showDone.includes(key) || done.length <= SHOWN_DONE + 1 ? done : done.slice(0, SHOWN_DONE)
526    const rows = [...failed, ...running, ...doneShown]
527    const hidden = done.length - doneShown.length
528    rows.forEach((n, i) => emitTree(n, nodes, o, out, { ...branch(b.prefix, i === rows.length - 1 && hidden === 0), depth: at.depth + 2, defaultOpen: true }))
529    if (hidden > 0) out.push({ kind: 'more', key, count: hidden, guide: branch(b.prefix, true).guide })
530  })
531}
532
533// Inside an opened run: the run's own row first, then its whole tree, open.
534export function runTree(run: AgentNode, nodes: AgentNode[], filter: Filter, flipped: readonly string[], showDone: readonly string[]): Item[] {
535  const out: Item[] = []
536  emitTree(run, nodes, { filter, flipped, showDone }, out, { guide: '', prefix: '', depth: 0, defaultOpen: true })
537  return out
538}
539
540// Files two or more agents of a scope edited: where parallel work can collide.
541export function overlaps(scope: AgentNode[]): { path: string; by: AgentNode[] }[] {
542  return fileRows(scope)
543    .map(r => ({ path: r.path, by: [...new Map(r.by.map(b => [b.node.id, b.node])).values()] }))
544    .filter(r => r.by.length >= 2)
545}
546
547// The agents a run or a top-level view covers, for the board, the timeline and the insights.
548export const leafAgents = (scope: AgentNode[]) => scope.filter(n => n.kind === 'agent')
549
550const SHOWN_DONE = 3
551
552// Inside a workflow: agents grouped by phase. A phase with nothing running or failed
553// folds to its header; finished agents past the first few fold to a "… N done" row.
554export function workflowItems(
555  wf: AgentNode, nodes: AgentNode[], filter: Filter, flipped: readonly string[], showDone: readonly string[],
556): Item[] {
557  const kids = childrenOf(nodes, wf.id).sort((a, b) => a.startedAt - b.startedAt)
558  const order = [...(wf.phases ?? [])]
559  for (const k of kids) if (!order.includes(k.phase ?? 'Agents')) order.push(k.phase ?? 'Agents')
560  const out: Item[] = []
561  for (const phase of order) {
562    const inPhase = kids.filter(k => (k.phase ?? 'Agents') === phase && passes(k, [], filter))
563    if (inPhase.length === 0) continue
564    const c = counts(inPhase)
565    const key = `${wf.id}:${phase}`
566    const isOpen = (c.running > 0 || c.failed > 0) !== flipped.includes(key)
567    out.push({ kind: 'phase', key, wfId: wf.id, phase, isOpen, ...c })
568    if (!isOpen) continue
569    const failed = inPhase.filter(k => k.status === 'failed')
570    const running = inPhase.filter(k => k.status === 'running')
571    const done = inPhase.filter(k => k.status !== 'running' && k.status !== 'failed')
572      .sort((a, b) => (b.endedAt ?? 0) - (a.endedAt ?? 0))
573    const doneShown = showDone.includes(key) || done.length <= SHOWN_DONE + 1 ? done : done.slice(0, SHOWN_DONE)
574    for (const n of [...failed, ...running, ...doneShown]) out.push({ kind: 'node', node: n, species: 'sea', depth: 1 })
575    if (doneShown.length < done.length) out.push({ kind: 'more', key, count: done.length - doneShown.length })
576  }
577  return out
578}
579
580// Inside a run: a workflow's phases and agents, or a subagent with its own subagents.
581export function runItems(
582  run: AgentNode, nodes: AgentNode[], filter: Filter, flipped: readonly string[], showDone: readonly string[],
583): Item[] {
584  if (run.kind === 'workflow') return workflowItems(run, nodes, filter, flipped, showDone)
585  const out: Item[] = []
586  const walk = (n: AgentNode, depth: number) => {
587    out.push({ kind: 'node', node: n, species: 'cat', depth })
588    for (const k of childrenOf(nodes, n.id)) walk(k, depth + 1)
589  }
590  // a group lists its members in the order they started, each with its own subagents
591  if (run.kind === 'group') for (const k of childrenOf(nodes, run.id).filter(k => passes(k, [], filter)).sort((a, b) => a.startedAt - b.startedAt)) walk(k, 1)
592  else walk(run, 0)
593  return out
594}
595
596// Keep the client's props under the tree bound: drop bulky text first, then this session's
597// finished runs that History holds, then the oldest history, then any finished run left.
598export function fitProps<T extends { nodes: AgentNode[]; history: AgentNode[] }>(p: T, limit = 90_000): T {
599  const size = (x: unknown) => JSON.stringify(x).length
600  if (size(p) <= limit) return p
601  // a missing prompt or result stays missing: props that hold undefined are refused
602  const slim = (n: AgentNode): AgentNode => ({
603    ...n, ...(n.prompt !== undefined ? { prompt: n.prompt.slice(0, 160) } : {}),
604    ...(n.result !== undefined ? { result: n.result.slice(0, 300), ...(n.result.length > 300 ? { resultLength: n.resultLength ?? n.result.length } : {}) } : {}),
605  })
606  let next = { ...p, nodes: p.nodes.map(n => (n.status === 'running' ? n : slim(n))), history: p.history.map(slim) }
607  // A long session can pass the bound on its own runs. The live list does not show
608  // finished runs, History does: the ones it holds go first, and History keeps them.
609  const held = new Set(next.history.map(n => n.id))
610  next = dropFinished(next, limit, top => held.has(top.id))
611  while (size(next) > limit && next.history.length > 0) next = { ...next, history: next.history.slice(Math.ceil(next.history.length / 4)) }
612  return dropFinished(next, limit, () => true)
613}
614
615// This session's oldest finished runs go, whole, until the props fit, so no agent
616// loses its parent; running work stays. `may` says which runs can go.
617function dropFinished<T extends { nodes: AgentNode[] }>(p: T, limit: number, may: (top: AgentNode) => boolean): T {
618  const size = (x: unknown) => JSON.stringify(x).length
619  let over = size(p) - limit
620  if (over <= 0) return p
621  const byId = new Map(p.nodes.map(n => [n.id, n]))
622  const topOf = (n: AgentNode) => { let x = n; while (x.parentId && byId.has(x.parentId)) x = byId.get(x.parentId)!; return x }
623  const runs = new Map<AgentNode, AgentNode[]>()
624  for (const n of p.nodes) { const top = topOf(n); runs.set(top, [...(runs.get(top) ?? []), n]) }
625  const finished = [...runs].filter(([top, run]) => may(top) && run.every(n => n.status !== 'running')).sort(([a], [b]) => a.startedAt - b.startedAt)
626  const gone = new Set<AgentNode>()
627  for (const [top, run] of finished) {
628    if (over <= 0) break
629    gone.add(top)
630    over -= run.reduce((sum, n) => sum + size(n) + 1, 0)
631  }
632  return gone.size ? { ...p, nodes: p.nodes.filter(n => !gone.has(topOf(n))) } : p
633}
634
635// The engine refuses a Client whose props serialize past 100,000 characters, and the
636// pane then draws empty. The slack covers any difference in how the engine counts.
637export const PROPS_BOUND = 98_000
638
639// The view's whole props: everything beside the runs is measured, and the runs take
640// the room it leaves. An open file's own edits take at most half: its oldest go first.
641export function fitView<T extends { nodes: AgentNode[]; history: AgentNode[]; at: number }, R extends { diff?: { path: string; edits: EditRecord[] }; [key: string]: unknown }>(runs: T, rest: R, bound = PROPS_BOUND): T & R {
642  const size = (x: unknown) => JSON.stringify(x).length
643  let fixed = rest
644  if (rest.diff && size(rest.diff) > bound / 2) {
645    let over = size(rest.diff) - bound / 2
646    let cut = 0
647    while (over > 0 && cut < rest.diff.edits.length) over -= size(rest.diff.edits[cut++]) + 1
648    fixed = { ...rest, diff: { ...rest.diff, edits: rest.diff.edits.slice(cut) } }
649  }
650  const empty = { nodes: [], history: [], at: runs.at }
651  const room = bound - (size({ ...empty, ...fixed }) - size(empty))
652  return { ...fitProps(runs, room), ...fixed }
653}
654
655// An agent's transcript keeps every edit call it made, so a run recorded before
656// edits were kept can still show its diffs. Failed calls are left out; lines are
657// placed against the file as it is now, which is right unless a later edit moved them.
658export function transcriptEdits(text: string, agentId: string, now: string | undefined): EditRecord[] {
659  const calls: { id: string; tool: string; input: Record<string, unknown>; at: number }[] = []
660  const failed = new Set<string>()
661  for (const line of text.split('\n')) {
662    if (!line.trim()) continue
663    let row: { timestamp?: string; message?: { content?: unknown } }
664    try { row = JSON.parse(line) } catch { continue }
665    const content = Array.isArray(row.message?.content) ? (row.message!.content as Record<string, unknown>[]) : []
666    const at = row.timestamp ? Date.parse(row.timestamp) || 0 : 0
667    for (const b of content) {
668      if (b.type === 'tool_use' && typeof b.id === 'string' && typeof b.name === 'string' && b.input && typeof b.input === 'object')
669        calls.push({ id: b.id, tool: b.name, input: b.input as Record<string, unknown>, at })
670      if (b.type === 'tool_result' && b.is_error === true && typeof b.tool_use_id === 'string') failed.add(b.tool_use_id)
671    }
672  }
673  return calls
674    .filter(c => !failed.has(c.id) && editedPath(c.tool, c.input))
675    // A transcript can not tell whether a Write made a new file, so isNew is left out
676    // (never set to undefined: props that hold undefined are refused).
677    .flatMap(c => editRecords(c.tool, c.input, undefined, now).map(({ isNew: _unknown, ...r }, i) => ({
678      ...r, id: `${c.id}:${i}`, agentId, at: c.at,
679    })))
680}
681
hooks/report.ts 192 lines
1import type { AgentNode, Report } from '../types'
2import { childrenOf, counts, fileRows, firstSentence, noReportReason, phaseWords, pipeline, plain, readableResult, scopeNodes, type FileRow } from './list'
3
4// The short report a person reads when work finishes. The model writes the words
5// (result, done, decisions, problems, next); what changed and the totals come from
6// the mod's own records, so they are exact. Reports are written bottom-up: an agent
7// from its own report, a workflow phase from its agents' reports, a run from its
8// part reports. Each call reads one level down and is capped, so none grows with the run.
9
10// Simplified Technical English, about 60% of the way: what every report prompt says.
11export const REPORT_RULES = [
12  'Write in Simplified Technical English, about 60% of the way:',
13  '- One idea per sentence. At most 15 words in a sentence.',
14  '- Use active voice and plain words.',
15  '- Name files, agents and numbers exactly as the input gives them.',
16  '- Lead with the main point. No hedging, no filler, no praise.',
17  '- Keep linking words (because, so, only when) so the reader can follow the logic.',
18  '- Use only facts that are in the input. Do not invent. Write "unknown" when the input does not say.',
19  '- At most 3 items in each list. At most 120 words in total.',
20].join('\n')
21
22export const REPORT_SYSTEM = [
23  'You write the short report a person reads when AI agents finish a piece of work.',
24  REPORT_RULES,
25  'Reply with JSON only, no markdown:',
26  '{"result": "the verdict, then at most 1 more sentence", "done": ["what was done"],',
27  ' "decisions": [{"text": "a design choice the agents made", "source": "the agent or phase it came from"}],',
28  ' "problems": [{"text": "what is wrong or still open, and where", "source": "the agent or phase it came from"}],',
29  ' "next": "1 sentence: the next step, or empty"}',
30  'The first sentence of result is the verdict: at most 12 words, with the key number. A reader who stops there knows the outcome. Example: "Found 1 real error; 8 of 9 claims are overstated."',
31  'Each problem names the item it is about (a file, claim or agent) and what is wrong with it.',
32  'Use [] for an empty list. Decisions are only design choices the input states. Leave out files and line counts: the dashboard adds them from its own records.',
33  'A line "[… N characters left out by the dashboard …]" marks text the dashboard cut, not the agent. Never report that gap as missing, unfinished or unread work.',
34].join('\n')
35
36// The caps that keep every report call bounded, however big the run.
37export const CAP_EACH = 400
38export const CAP_ALL = 4000
39export const CAP_FINAL = 1500
40export const CAP_TASK = 500
41// Output caps: a report's JSON, with its lists and sources, runs past 400 tokens.
42export const REPORT_TOKENS = 800
43export const PART_TOKENS = 600
44// A report kept as raw JSON: its reply was cut, and the old parser kept the text.
45export const isRawReport = (s: string | undefined) => !!s && /^\s*(json\b|```|\{)/.test(s)
46
47// A model's reply as a report: tolerant of fences and chatter, and of the older
48// {outcome, points} digest shape. Fields it cannot read are left out, never undefined.
49export function parseReport(raw: string): Report | undefined {
50  const json = /\{[\s\S]*\}/.exec(raw)?.[0]
51  let d: Record<string, unknown>
52  try { d = JSON.parse(json ?? '') as Record<string, unknown> } catch {
53    // a reply cut at its token cap still holds its verdict: the result string comes first
54    const result = /"result"\s*:\s*("(?:[^"\\]|\\.)*")/.exec(raw)?.[1]
55    let text: unknown
56    try { text = result ? JSON.parse(result) : undefined } catch { text = undefined }
57    const t = typeof text === 'string' ? plain(text).slice(0, 300) : ''
58    return t ? { result: t } : undefined
59  }
60  const str = (x: unknown, n: number) => {
61    const t = typeof x === 'string' ? plain(x) : ''
62    return t ? t.slice(0, n) : undefined
63  }
64  const tagged = (x: unknown) => (Array.isArray(x) ? x : []).flatMap(i => {
65    const text = str(typeof i === 'string' ? i : (i as { text?: unknown } | null)?.text, 200)
66    if (!text) return []
67    const source = i && typeof i === 'object' ? str((i as { source?: unknown }).source, 60) : undefined
68    return [source ? { text, source } : { text }]
69  }).slice(0, 3)
70  const doneRaw = Array.isArray(d.done) ? d.done : Array.isArray(d.points) ? d.points : []
71  const done = doneRaw.map(p => str(typeof p === 'string' ? p : (p as { text?: unknown } | null)?.text, 160)).filter((p): p is string => !!p).slice(0, 3)
72  const out: Report = {}
73  const result = str(d.result, 300) ?? str(d.outcome, 300)
74  if (result) out.result = result
75  if (done.length) out.done = done
76  const decisions = tagged(d.decisions)
77  if (decisions.length) out.decisions = decisions
78  const problems = tagged(d.problems)
79  if (problems.length) out.problems = problems
80  const next = str(d.next, 200)
81  if (next) out.next = next
82  return Object.keys(out).length ? out : undefined
83}
84
85// The report a node shows: its own, else one shaped from what an older run kept
86// (summary as the result, points as what was done). No model call.
87export function reportOf(n: AgentNode): Report | undefined {
88  if (n.report) return n.report
89  const result = n.summary || (n.kind === 'workflow' ? firstSentence(readableResult(n.result), 300) : firstSentence(n.result, 300))
90  const out: Report = {}
91  if (result) out.result = result
92  if (n.points?.length) out.done = n.points.slice(0, 3)
93  return Object.keys(out).length ? out : undefined
94}
95
96const STATUS_WORD: Record<AgentNode['status'], string> = { running: 'running', done: 'done', failed: 'failed', killed: 'stopped' }
97
98// One line per part for the level above: its result and its problems, never its raw text.
99export function partLine(n: AgentNode): string {
100  const r = reportOf(n)
101  const problems = r?.problems?.map(p => p.text).join(' ') ?? ''
102  return `- ${n.label} [${STATUS_WORD[n.status]}]: ${r?.result ?? noReportReason(n)}${problems ? ` Problems: ${problems}` : ''}`.slice(0, CAP_EACH)
103}
104
105// Lines joined until the cap, so the input never grows with the run.
106export function capLines(lines: string[], cap = CAP_ALL): string {
107  let out = ''
108  for (const l of lines) {
109    if (out.length + l.length + 1 > cap) { out += `${out ? '\n' : ''}- … ${lines.length - out.split('\n').length} more not shown`; break }
110    out += `${out ? '\n' : ''}${l}`
111  }
112  return out
113}
114
115// A workflow phase's part report reads its agents' reports.
116export function partInput(wf: AgentNode, phase: string, nodes: AgentNode[]): string {
117  const agents = childrenOf(nodes, wf.id).filter(k => (k.phase ?? 'Agents') === phase).sort((a, b) => a.startedAt - b.startedAt)
118  return [
119    `Workflow: ${wf.label.slice(0, 200)}`,
120    `Part: the ${phase} phase, ${agents.length} agent${agents.length === 1 ? '' : 's'} (${phaseWords({ phase, ...counts(agents) })})`,
121    '',
122    'Agent reports:',
123    capLines(agents.map(partLine)),
124  ].join('\n')
125}
126
127// A long report keeps its start and its end, since agents put the verdict last.
128// The gap is named, so a cut text never reads as unfinished work. `whole` is the
129// length of the text before it was cut, when only a kept copy is at hand.
130const gapLine = (n: number) => `[… ${n.toLocaleString('en-US')} characters left out by the dashboard …]`
131export function cutReport(text: string, cap: number, whole = text.length): string {
132  if (text.length <= cap) return whole > text.length ? `${text}\n${gapLine(whole - text.length)}` : text
133  const tail = Math.floor(cap / 5)
134  const head = cap - tail
135  return `${text.slice(0, head)}\n${gapLine(whole - head - tail)}\n${text.slice(-tail)}`
136}
137
138// A run's report reads one level down: a single agent its own report text; a
139// cluster its members' reports; a workflow its phases' part reports. `full` is the
140// whole answer when it is at hand; else the kept copy is read, its cut named.
141export function runInput(n: AgentNode, nodes: AgentNode[], full?: string): string {
142  const source = full ?? n.result ?? ''
143  const lost = full === undefined && n.resultLength && n.result ? Math.max(0, n.resultLength - n.result.length) : 0
144  const task = `Task: ${(n.prompt ?? n.label).slice(0, CAP_TASK)}`
145  if (n.kind === 'group') {
146    const kids = childrenOf(nodes, n.id).sort((a, b) => a.startedAt - b.startedAt)
147    return [task, '', `Part reports, one per member (${kids.length}):`, capLines(kids.map(partLine))].join('\n')
148  }
149  if (n.kind === 'workflow') {
150    const parts = pipeline(n, nodes).map(p => {
151      const pr = n.partReports?.[p.phase]
152      const problems = pr?.problems?.map(x => `${x.text}${x.source ? ` [${x.source}]` : ''}`).join(' ') ?? ''
153      return `- ${p.phase} phase [${phaseWords(p)}]: ${pr?.result ?? 'unknown'}${problems ? ` Problems: ${problems}` : ''}`.slice(0, CAP_EACH)
154    })
155    const readable = readableResult(source)
156    const final = readable ? cutReport(readable, CAP_FINAL, readable.length + lost) : ''
157    return [task, '', `Part reports, one per phase (${parts.length}):`, capLines(parts), ...(final ? ['', `Final result: ${final}`] : [])].join('\n')
158  }
159  return [task, '', 'Report:', source ? cutReport(source, CAP_ALL, source.length + lost) : ''].join('\n')
160}
161
162// ── facts from records: what changed and the totals, never from the model ────
163export type Facts = {
164  files: FileRow[]
165  added: number
166  removed: number
167  agents: number
168  phases: number
169  ms: number
170  tokens: number
171}
172
173export function reportFacts(nodes: AgentNode[], scope: { kind: 'node'; id: string } | { kind: 'phase'; wfId: string; phase: string }, now: number): Facts {
174  const list = scopeNodes(nodes, scope)
175  const agents = list.filter(n => n.kind === 'agent')
176  const files = fileRows(list)
177  const root = scope.kind === 'node' ? nodes.find(n => n.id === scope.id) : undefined
178  const starts = list.map(n => n.startedAt).filter(Number.isFinite)
179  const ends = list.map(n => n.endedAt ?? now)
180  return {
181    files,
182    added: files.reduce((a, f) => a + f.added, 0),
183    removed: files.reduce((a, f) => a + f.removed, 0),
184    agents: agents.length,
185    phases: root?.kind === 'workflow' ? pipeline(root, nodes).length : 0,
186    ms: starts.length ? Math.max(0, Math.max(...ends) - Math.min(...starts)) : 0,
187    tokens: agents.reduce((a, n) => a + (n.tokens ?? 0), 0),
188  }
189}
190
191export const kTokens = (n: number) => (n >= 1_000_000 ? `${(n / 1_000_000).toFixed(1)}M` : n >= 1000 ? `${(n / 1000).toFixed(n >= 100_000 ? 0 : 1)}k` : String(n))
192
hooks/trace.ts 426 lines
1import type { AgentNode, TraceLane, TraceRow, TraceZoom } from '../types'
2import { describeTool, editedPath } from './list'
3import { treeOrder } from './lens'
4
5// The trail behind a run: what each agent did, in order, and how the agents
6// handed work to each other. Read from transcripts when a trace opens; pure here.
7
8export type TraceKind = 'spawn' | 'tool' | 'edit' | 'message' | 'handback' | 'report' | 'fail' | 'quiet' | 'note' | 'step'
9
10export type TraceEvent = {
11  agentId: string
12  at: number
13  kind: TraceKind
14  // the tool's name for a tool call, else the kind
15  name: string
16  summary: string
17  input?: string
18  output?: string
19  tokens?: number
20  // a spawn's child (its agent id when the result names it, else its description), a message's recipient
21  to?: string
22  // a message's sender, when it arrived from another agent or session
23  from?: string
24  path?: string
25  added?: number
26  removed?: number
27  error?: boolean
28}
29
30export const ZOOMS: TraceZoom[] = ['story', 'steps', 'raw']
31export const ZOOM_NAMES: Record<TraceZoom, string> = { story: 'Story', steps: 'Steps', raw: 'Raw' }
32export const QUIET_GAP = 120_000
33const EXCERPT = 160
34
35const oneLine = (s: string) => s.replace(/\s+/g, ' ').trim()
36export const excerpt = (s: unknown, n = EXCERPT): string | undefined => {
37  if (typeof s !== 'string') return undefined
38  const t = oneLine(s)
39  if (!t) return undefined
40  return t.length > n ? `${t.slice(0, n - 1)}…` : t
41}
42const baseName = (p: string) => p.split('/').filter(Boolean).pop() ?? p
43const lines = (s: unknown) => (typeof s === 'string' && s.length ? s.split('\n').length : 0)
44
45// The text of a tool result: a string, or text blocks.
46function resultText(content: unknown): string {
47  if (typeof content === 'string') return content
48  if (Array.isArray(content)) return content.map(b => (b && typeof b === 'object' && typeof (b as { text?: unknown }).text === 'string' ? (b as { text: string }).text : '')).join('\n')
49  return ''
50}
51
52// The few input fields a person reads, not the whole input.
53function inputText(name: string, input: Record<string, unknown>): string | undefined {
54  const s = (k: string) => (typeof input[k] === 'string' ? (input[k] as string) : '')
55  if (name === 'Bash') return excerpt(s('command'))
56  if (name === 'Read' || name === 'Write' || name === 'Edit' || name === 'MultiEdit') return excerpt(s('file_path'))
57  if (name === 'Grep' || name === 'Glob') return excerpt([s('pattern'), s('path')].filter(Boolean).join(' in '))
58  if (name === 'WebFetch') return excerpt(s('url'))
59  if (name === 'WebSearch') return excerpt(s('query'))
60  if (name === 'Agent' || name === 'Task') return excerpt(s('prompt'))
61  if (name === 'SendMessage') return excerpt(s('message') || s('content'))
62  if (name === 'SubagentHandback') return excerpt(s('message'))
63  const first = Object.entries(input).find(([, v]) => typeof v === 'string')
64  return first ? excerpt(String(first[1])) : undefined
65}
66
67// What a message that arrived says: who sent it and its first words.
68const INCOMING = /<(cross-session-message|agent-message)\b([^>]*)>([\s\S]*?)(?:<\/\1>|$)/g
69function incoming(text: string): { from: string; body: string }[] {
70  const out: { from: string; body: string }[] = []
71  for (const m of text.matchAll(INCOMING)) {
72    const attrs = m[2] ?? ''
73    const from = /from-name="([^"]*)"/.exec(attrs)?.[1] ?? /from="([^"]*)"/.exec(attrs)?.[1] ?? 'another session'
74    out.push({ from, body: m[3] ?? '' })
75  }
76  return out
77}
78
79type Row = { type?: string; timestamp?: string; message?: { role?: string; content?: unknown; usage?: Record<string, unknown> } }
80type Block = { type?: string; id?: string; name?: string; input?: Record<string, unknown>; text?: string; tool_use_id?: string; content?: unknown; is_error?: boolean }
81
82// A parse that can take a transcript in pieces: whole lines in, events out.
83export type Parse = { agentId: string; events: TraceEvent[]; pending: Map<string, number>; lastText?: { at: number; text: string }; handedBack: boolean; sawTask: boolean; lastAt: number; beforeTask: boolean }
84
85export const newParse = (agentId: string): Parse => ({ agentId, events: [], pending: new Map(), handedBack: false, sawTask: false, lastAt: 0, beforeTask: false })
86
87export function parseLines(p: Parse, text: string): Parse {
88  for (const line of text.split('\n')) {
89    if (!line.trim()) continue
90    let row: Row
91    try { row = JSON.parse(line) as Row } catch { continue }
92    const at = row.timestamp ? Date.parse(row.timestamp) : p.lastAt
93    if (Number.isFinite(at) && at > 0) p.lastAt = at
94    const content = row.message?.content
95    // A fork's transcript opens with the parent's own call that started it; its
96    // work begins at the first text it is given (the directive).
97    if (row.type === 'fork-context-ref') { p.beforeTask = true; continue }
98    if (p.beforeTask) {
99      const text = row.type === 'user' && (typeof content === 'string' || (Array.isArray(content) && (content as Block[]).some(b => b.type === 'text')))
100      if (text) { p.beforeTask = false; p.sawTask = true }
101      continue
102    }
103    if (row.type === 'assistant' && Array.isArray(content)) {
104      const u = row.message?.usage ?? {}
105      const num = (k: string) => (typeof u[k] === 'number' ? (u[k] as number) : 0)
106      let tokens: number | undefined = num('input_tokens') + num('cache_creation_input_tokens') + num('output_tokens') || undefined
107      for (const b of content as Block[]) {
108        if (b.type === 'text' && b.text?.trim()) p.lastText = { at: p.lastAt, text: b.text }
109        if (b.type !== 'tool_use' || !b.name) continue
110        const ev = toolEvent(p.agentId, p.lastAt, b.name, b.input ?? {})
111        if (tokens) { ev.tokens = tokens; tokens = undefined }
112        if (ev.kind === 'handback') p.handedBack = true
113        if (b.id) p.pending.set(b.id, p.events.length)
114        p.events.push(ev)
115      }
116    } else if (row.type === 'user') {
117      const blocks: Block[] = typeof content === 'string' ? [{ type: 'text', text: content }] : Array.isArray(content) ? (content as Block[]) : []
118      for (const b of blocks) {
119        if (b.type === 'tool_result' && b.tool_use_id) {
120          const i = p.pending.get(b.tool_use_id)
121          if (i === undefined) continue
122          p.pending.delete(b.tool_use_id)
123          const ev = p.events[i]!
124          const out = resultText(b.content)
125          const o = excerpt(out)
126          if (o) ev.output = o
127          if (b.is_error) ev.error = true
128          // a background spawn's result names the agent it started
129          const child = ev.kind === 'spawn' ? /agentId:\s*([a-z0-9]{8,})/i.exec(out)?.[1] : undefined
130          if (child) ev.to = child
131        } else if (b.type === 'text' && b.text) {
132          // the first user text is the task this agent was given, not a message
133          if (!p.sawTask) { p.sawTask = true; continue }
134          for (const m of incoming(b.text)) {
135            p.events.push({ agentId: p.agentId, at: p.lastAt, kind: 'message', name: 'message', summary: excerpt(m.body, 80) ?? 'a message', from: m.from, ...(excerpt(m.body) ? { input: excerpt(m.body) } : {}) })
136          }
137        }
138      }
139    }
140  }
141  return p
142}
143
144function toolEvent(agentId: string, at: number, name: string, input: Record<string, unknown>): TraceEvent {
145  const s = (k: string) => (typeof input[k] === 'string' ? (input[k] as string) : '')
146  const base = { agentId, at, name, ...(inputText(name, input) ? { input: inputText(name, input) } : {}) }
147  if (name === 'Agent' || name === 'Task') return { ...base, kind: 'spawn', summary: `started ${s('description') || s('name') || 'a subagent'}`, to: s('description') || s('name') }
148  if (name === 'SendMessage') return { ...base, kind: 'message', summary: excerpt(s('summary') || s('message') || s('content'), 80) ?? 'a message', to: s('to') || s('recipient') }
149  if (name === 'SubagentHandback') return { ...base, kind: 'handback', summary: excerpt(s('message').split('\n').find(l => l.trim()) ?? 'its report', 80) ?? 'its report' }
150  const path = editedPath(name, input)
151  if (path) {
152    const added = name === 'Write' ? lines(input.content) : lines(input.new_string)
153    const removed = name === 'Write' ? 0 : lines(input.old_string)
154    return { ...base, kind: 'edit', summary: `${name === 'Write' ? 'wrote' : 'edited'} ${baseName(path)}`, path, added, removed }
155  }
156  return { ...base, kind: 'tool', summary: describeTool(name, input).activity }
157}
158
159// The end of a parse: an agent that wrote a last text and handed nothing back reported that text.
160export function finishParse(p: Parse): TraceEvent[] {
161  const out = [...p.events]
162  if (!p.handedBack && p.lastText) {
163    out.push({ agentId: p.agentId, at: p.lastText.at, kind: 'report', name: 'report', summary: excerpt(p.lastText.text.split('\n').find(l => l.trim()) ?? '', 80) ?? 'its report', ...(excerpt(p.lastText.text) ? { input: excerpt(p.lastText.text) } : {}) })
164  }
165  return out
166}
167
168export const parseTranscript = (text: string, agentId: string): TraceEvent[] => finishParse(parseLines(newParse(agentId), text))
169
170// ── zoom: steps group runs of like tool calls; a story keeps a few beats ──────
171
172type Cls = 'read' | 'search' | 'run' | 'web' | 'other'
173const clsOf = (e: TraceEvent): Cls => {
174  if (e.name === 'Read' || e.name === 'LS') return 'read'
175  if (e.name === 'Grep' || e.name === 'Glob' || e.name === 'ToolSearch' || e.name === 'LSP') return 'search'
176  if (e.name === 'Bash' || e.name === 'Monitor') return 'run'
177  if (e.name === 'WebFetch' || e.name === 'WebSearch' || e.name.startsWith('mcp__')) return 'web'
178  return 'other'
179}
180const plural = (n: number, w: string) => `${n} ${w}${n === 1 ? '' : 's'}`
181// the folder most of the paths share, for "read 6 files in src/auth"
182function commonDir(paths: string[]): string {
183  const parts = paths.map(p => p.split('/').filter(Boolean).slice(0, -1))
184  if (!parts.length) return ''
185  let n = 0
186  while (parts.every(ps => ps[n] !== undefined && ps[n] === parts[0]![n])) n++
187  const dir = parts[0]!.slice(0, n)
188  return dir.slice(-2).join('/')
189}
190function groupText(cls: Cls, list: TraceEvent[]): string {
191  if (cls === 'read') {
192    const dir = commonDir(list.map(e => e.input ?? ''))
193    return `read ${plural(list.length, 'file')}${dir ? ` in ${dir}` : ''}`
194  }
195  if (cls === 'search') return `searched ${plural(list.length, 'time')}`
196  if (cls === 'run') return `ran ${plural(list.length, 'command')}`
197  if (cls === 'web') return plural(list.length, 'web call')
198  return `used ${plural(list.length, 'tool')}`
199}
200
201export type Step = TraceEvent & { count?: number; end?: number; error?: boolean }
202
203// Steps: consecutive tool calls of one kind become one row; edits to one file become one row.
204export function stepsOf(events: TraceEvent[]): Step[] {
205  const out: Step[] = []
206  for (const e of events) {
207    const last = out[out.length - 1]
208    if (last && last.agentId === e.agentId && e.kind === 'tool' && last.kind === 'tool' && clsOf(last) === clsOf(e)) {
209      const members = [...((last as Step & { members?: TraceEvent[] }).members ?? [last]), e]
210      Object.assign(last, { count: members.length, end: e.at, summary: groupText(clsOf(e), members), members, error: last.error || e.error,
211        tokens: (last.tokens ?? 0) + (e.tokens ?? 0) || undefined, output: e.output ?? last.output })
212      continue
213    }
214    if (last && last.agentId === e.agentId && e.kind === 'edit' && last.kind === 'edit' && last.path === e.path) {
215      const count = (last.count ?? 1) + 1
216      Object.assign(last, { count, end: e.at, summary: `${last.summary.split(' ×')[0]} ×${count}`, added: (last.added ?? 0) + (e.added ?? 0), removed: (last.removed ?? 0) + (e.removed ?? 0),
217        tokens: (last.tokens ?? 0) + (e.tokens ?? 0) || undefined })
218      continue
219    }
220    out.push({ ...e })
221  }
222  return out.map(({ ...s }) => { delete (s as { members?: unknown }).members; return s })
223}
224
225// A story: per agent, its own beats (spawns, edits, messages, hand-backs, reports)
226// stay, and its tool work folds into at most a few beats between them.
227export function storyOf(events: TraceEvent[], maxBeats = 8): Step[] {
228  const steps = stepsOf(events)
229  const byAgent = new Map<string, Step[]>()
230  for (const s of steps) byAgent.set(s.agentId, [...(byAgent.get(s.agentId) ?? []), s])
231  const out: Step[] = []
232  for (const agentId of [...new Set(steps.map(s => s.agentId))]) {
233    const list: Step[] = byAgent.get(agentId) ?? []
234    const keep = list.filter((s: Step) => s.kind !== 'tool')
235    const room = Math.max(3, maxBeats - keep.length)
236    // tool steps fold into `room` buckets of neighbours
237    const tools: Step[] = list.filter((s: Step) => s.kind === 'tool')
238    const size = Math.max(1, Math.ceil(tools.length / room))
239    const buckets: Step[] = []
240    for (let i = 0; i < tools.length; i += size) {
241      const part = tools.slice(i, i + size)
242      if (part.length === 1) { buckets.push(part[0]!); continue }
243      // a step keeps its first call's tool name, and steps group one class each
244      const tally = (c: Cls) => part.filter(t => clsOf(t) === c).reduce((a, t) => a + (t.count ?? 1), 0)
245      const bits = [
246        tally('read') ? `read ${plural(tally('read'), 'file')}` : '',
247        tally('search') ? `searched ${plural(tally('search'), 'time')}` : '',
248        tally('run') ? `ran ${plural(tally('run'), 'command')}` : '',
249        tally('web') ? plural(tally('web'), 'web call') : '',
250        tally('other') ? `used ${plural(tally('other'), 'other tool')}` : '',
251      ].filter(Boolean)
252      buckets.push({ ...part[0]!, summary: bits.join(', ') || `used ${plural(part.length, 'tool')}`, count: part.reduce((a, t) => a + (t.count ?? 1), 0), end: part[part.length - 1]!.end ?? part[part.length - 1]!.at,
253        error: part.some(t => t.error), tokens: part.reduce((a, t) => a + (t.tokens ?? 0), 0) || undefined })
254    }
255    out.push(...[...keep, ...buckets].sort((a, b) => a.at - b.at))
256  }
257  return out.sort((a, b) => a.at - b.at)
258}
259
260export const zoomed = (events: TraceEvent[], zoom: TraceZoom): Step[] => (zoom === 'raw' ? events.map(e => ({ ...e })) : zoom === 'steps' ? stepsOf(events) : storyOf(events))
261
262// ── lanes: one per agent, the main session first; rows in time order ─────────
263
264// Two letters a lane is known by: "review:bugs" → RB, "Fix cart totals" → FC.
265export function chipOf(label: string): string {
266  const words = label.split(/[^A-Za-z0-9]+/).filter(Boolean)
267  if (words.length >= 2) return (words[0]![0]! + words[1]![0]!).toUpperCase()
268  return (words[0] ?? label).slice(0, 2).toUpperCase().padEnd(2, ' ')
269}
270
271export const MAIN = 'main'
272
273// Builds a run's trace: its lanes, and its rows at a zoom.
274// `events` holds what each agent's transcript gave; an agent missing from it has no
275// transcript on disk, and its lane is built from what its node holds.
276// `stories`: agents whose steps a model wrote; at the story zoom those steps stand in for
277// their tool calls, spread over the time the agent ran, between its real edits and hand-backs.
278export function buildTrace(run: AgentNode, scope: AgentNode[], events: Map<string, TraceEvent[]>, now: number, zoom: TraceZoom, stories?: Map<string, string[]>): { lanes: TraceLane[]; rows: TraceRow[]; missing: number } {
279  // lanes in tree order: each agent, then the agents it spawned, so a child's lane sits by its parent's
280  const ordered = run.kind === 'agent'
281    ? [{ node: run, depth: 0 }, ...treeOrder(scope, run.id).map(r => ({ ...r, depth: r.depth + 1 }))]
282    : treeOrder(scope, run.id)
283  const seen = new Set(ordered.map(r => r.node.id))
284  for (const n of scope.filter(x => x.kind === 'agent' && !seen.has(x.id)).sort((a, b) => a.startedAt - b.startedAt)) ordered.push({ node: n, depth: 0 })
285  const agents = ordered.map(r => r.node)
286  const depthOf = new Map(ordered.map(r => [r.node.id, r.depth]))
287  const isAgent = new Set(agents.map(a => a.id))
288  const parentLane = (n: AgentNode) => (n.parentId && isAgent.has(n.parentId) ? n.parentId : MAIN)
289  const hasMain = agents.some(a => parentLane(a) === MAIN)
290  const laneIds = [...(hasMain ? [MAIN] : []), ...agents.map(a => a.id)]
291  const laneOf = new Map(laneIds.map((id, i) => [id, i]))
292  const all: TraceEvent[] = []
293  let missing = 0
294  // copies: linking a spawn to its child's lane must not change what the cache holds
295  const copies = new Map<string, TraceEvent[]>()
296  for (const a of agents) { const own = events.get(a.id); if (own) copies.set(a.id, own.map(e => ({ ...e }))) }
297  // which spawn events of a parent are linked to a child lane already
298  const linked = new Set<TraceEvent>()
299  for (const a of agents) {
300    const own = copies.get(a.id)
301    const parent = parentLane(a)
302    // the arrow into this lane: from its parent's own spawn call when that is in a transcript, else from the main session
303    const parentEvents = parent === MAIN ? undefined : copies.get(parent)
304    const spawn = parentEvents?.find(e => e.kind === 'spawn' && !linked.has(e) && (e.to === a.id || e.to === a.label))
305    if (spawn) { linked.add(spawn); spawn.to = a.id }
306    else all.push({ agentId: parent, at: a.startedAt, kind: 'spawn', name: 'spawn', summary: `started ${a.label}`, to: a.id, ...(excerpt(a.prompt) ? { input: excerpt(a.prompt) } : {}) })
307    // a story outlives its transcript: its steps show even when the file is gone
308    const story = zoom === 'story' ? stories?.get(a.id) : undefined
309    if (story?.length) {
310      const t0 = a.startedAt
311      const t1 = Math.max(t0 + story.length, a.endedAt ?? now)
312      story.forEach((text, i) => all.push({ agentId: a.id, at: Math.round(t0 + ((t1 - t0) * (i + 0.5)) / story.length), kind: 'step', name: 'step', summary: text }))
313    }
314    if (own && story?.length) {
315      all.push(...own.filter(e => e.kind !== 'tool'))
316    } else if (own) {
317      all.push(...own)
318    } else {
319      missing++
320      all.push({ agentId: a.id, at: a.startedAt, kind: 'note', name: 'note', summary: 'transcript no longer on disk' })
321      const said = a.report?.result ?? a.summary ?? a.result
322      if (said && a.status !== 'running') all.push({ agentId: a.id, at: a.endedAt ?? a.startedAt, kind: 'report', name: 'report', summary: excerpt(said, 80) ?? said, ...(excerpt(said) ? { input: excerpt(said) } : {}) })
323    }
324    if (a.status === 'failed' || a.status === 'killed') {
325      all.push({ agentId: a.id, at: a.endedAt ?? now, kind: 'fail', name: 'fail', summary: a.status === 'failed' ? 'failed' : 'stopped' })
326    }
327  }
328  // a hand-back or a last report goes to the lane that started the agent
329  for (const e of all) {
330    if ((e.kind === 'handback' || e.kind === 'report') && laneOf.has(e.agentId)) {
331      const a = agents.find(x => x.id === e.agentId)
332      if (a) e.to = parentLane(a)
333    }
334    // a spawn the parent made that matches no lane stays a plain row
335    if (e.kind === 'spawn' && e.to && !laneOf.has(e.to)) e.to = undefined
336  }
337  all.sort((a, b) => a.at - b.at)
338  const steps = zoomed(all, zoom)
339  // quiet gaps: a lane that called nothing for two minutes or more, while it ran
340  const withQuiet: Step[] = []
341  const lastAt = new Map<string, number>()
342  for (const s of steps) {
343    const prev = lastAt.get(s.agentId)
344    if (prev !== undefined && s.at - prev >= QUIET_GAP && s.agentId !== MAIN) {
345      withQuiet.push({ agentId: s.agentId, at: prev, kind: 'quiet', name: 'quiet', summary: `quiet ${mins(s.at - prev)}` })
346    }
347    lastAt.set(s.agentId, s.end ?? s.at)
348    withQuiet.push(s)
349  }
350  for (const a of agents) {
351    const prev = lastAt.get(a.id)
352    if (a.status === 'running' && prev !== undefined && now - prev >= QUIET_GAP) {
353      withQuiet.push({ agentId: a.id, at: prev, kind: 'quiet', name: 'quiet', summary: `quiet ${mins(now - prev)} so far` })
354    }
355  }
356  withQuiet.sort((a, b) => a.at - b.at)
357  const rows: TraceRow[] = withQuiet.map(s => compact(s, laneOf))
358  const lanes: TraceLane[] = laneIds.map((id, i) => {
359    const a = agents.find(x => x.id === id)
360    const idx = rows.flatMap((r, k) => (r.lane === i || r.to === i ? [k] : []))
361    return {
362      id, label: a ? a.label : 'Main session', chip: a ? chipOf(a.label) : 'MS', depth: a ? depthOf.get(a.id) ?? 0 : 0,
363      status: a ? a.status : run.status === 'running' ? 'running' : 'done',
364      from: idx.length ? Math.min(...idx) : 0, to: idx.length ? Math.max(...idx) : 0,
365    }
366  })
367  return { lanes, rows, missing }
368}
369
370const mins = (ms: number) => (ms < 60_000 ? `${Math.round(ms / 1000)}s` : `${Math.round(ms / 60_000)}m`)
371
372// A row as the view gets it: short keys, nothing undefined.
373function compact(s: Step, laneOf: Map<string, number>): TraceRow {
374  const r: TraceRow = { kind: s.kind, lane: laneOf.get(s.agentId) ?? 0, at: s.at, text: s.summary }
375  if (s.to !== undefined && laneOf.has(s.to)) r.to = laneOf.get(s.to)!
376  else if (s.to) r.target = s.to
377  if (s.from) r.from = s.from
378  if (s.count && s.count > 1) r.count = s.count
379  if (s.end && s.end !== s.at) r.end = s.end
380  if (s.input) r.input = s.input
381  if (s.output) r.output = s.output
382  if (s.tokens) r.tokens = s.tokens
383  if (s.path) r.path = s.path
384  if (s.added !== undefined && s.kind === 'edit') r.added = s.added
385  if (s.removed !== undefined && s.kind === 'edit') r.removed = s.removed
386  if (s.error) r.error = true
387  if (s.kind === 'tool' || s.kind === 'edit') r.name = s.name
388  return r
389}
390
391export const TRACE_WINDOW = 160
392
393// The rows the view gets: a window around where it reads, so props stay small.
394export function traceWindow(rows: TraceRow[], offset: number, size = TRACE_WINDOW): { offset: number; rows: TraceRow[] } {
395  const at = Math.max(0, Math.min(offset, Math.max(0, rows.length - size)))
396  return { offset: at, rows: rows.slice(at, at + size) }
397}
398
399// ── reading a trace: one lane only, the rows worth a look, and a search ──────
400
401// The rows of one lane: what it did, and the arrows into and out of it. The lanes
402// keep their places (and so their colours); their spans are measured again.
403export function onlyLane(rows: TraceRow[], lanes: TraceLane[], lane: number): { rows: TraceRow[]; lanes: TraceLane[] } {
404  const kept = rows.filter(r => r.lane === lane || r.to === lane)
405  return {
406    rows: kept,
407    lanes: lanes.map((L, i) => {
408      const idx = kept.flatMap((r, k) => (r.lane === i || r.to === i ? [k] : []))
409      return { ...L, from: idx.length ? Math.min(...idx) : 0, to: idx.length ? Math.max(...idx) : -1 }
410    }),
411  }
412}
413
414export const MARKS_KEPT = 400
415
416// Rows worth a look: a failure, a call that errored, a quiet gap.
417export const traceMarks = (rows: TraceRow[]): number[] =>
418  rows.flatMap((r, i) => (r.kind === 'fail' || r.error || r.kind === 'quiet' ? [i] : [])).slice(0, MARKS_KEPT)
419
420// Rows whose words hold the search, any case: the row's text, its tool, what went in and out.
421export function traceHits(rows: TraceRow[], query: string): number[] {
422  const q = query.trim().toLowerCase()
423  if (!q) return []
424  return rows.flatMap((r, i) => ([r.text, r.name, r.input, r.output, r.path, r.from, r.target].some(t => t?.toLowerCase().includes(q)) ? [i] : [])).slice(0, MARKS_KEPT)
425}
426
hooks/ai.ts 235 lines
1import type { AgentNode, Brief, PatternCard } from '../types'
2import { REPORT_RULES, capLines, reportOf } from './report'
3import { childrenOf, fileRows, plain, prettyModel, scopeNodes } from './list'
4import type { Step } from './trace'
5
6// The AI layer: who may write what, the prompts, what each call reads (capped, so
7// no call grows with the run or the history), and how each reply is read back.
8// Pure: the hooks make the calls, the view draws what comes back.
9
10// What the /config setting allows: nothing, Haiku only, or Haiku and Sonnet on demand.
11export type AiMode = 'off' | 'cheap' | 'full'
12export const AI_MODES: AiMode[] = ['off', 'cheap', 'full']
13export type Tier = 'haiku' | 'sonnet'
14export const aiAllows = (mode: AiMode, tier: Tier) => mode === 'full' || (mode === 'cheap' && tier === 'haiku')
15export const TIER_NAME: Record<Tier, string> = { haiku: 'Haiku', sonnet: 'Sonnet' }
16
17// The caps: one line, a whole input, how many rows a call reads.
18export const STORY_STEPS_IN = 40
19export const STORY_CAP = 3000
20export const EXPLAIN_CAP = 6000
21export const PATTERN_RUNS = 50
22export const PATTERNS_CAP = 8000
23const LINE = 300
24
25const clip = (s: string | undefined, n = LINE) => plain(s ?? '').slice(0, n)
26
27// ── story steps: what one agent did, in a few short steps ─────────────────────
28
29export const STORY_SYSTEM = [
30  'You turn the tool log of one AI agent into the few steps a person reads to follow what it did.',
31  REPORT_RULES,
32  'Write 3 to 8 steps, in the order they happened. Each step is one sentence that starts with a verb in the past tense.',
33  'Group many small calls into one step. Name files and commands as the log gives them.',
34  'Reply with JSON only, no markdown: {"steps": ["..."]}',
35].join('\n')
36
37// Each call in its own words (a shell call's own description), repeats folded, the beats
38// that are not tool calls always kept, and the rest sampled evenly: at most 40 lines.
39// A shell call with no description of its own reads as its command, not its first 40 characters.
40const said = (e: Step) => (e.kind === 'tool' && e.summary.startsWith('Running ') && e.input ? `ran ${clip(e.input, 140)}` : e.summary)
41
42export function storyLines(events: Step[], max = STORY_STEPS_IN): { lines: Step[]; dropped: number } {
43  const folded: Step[] = []
44  for (const e0 of events) {
45    const e = { ...e0, summary: said(e0) }
46    const last = folded[folded.length - 1]
47    if (last && last.kind === e.kind && last.summary === e.summary) { last.count = (last.count ?? 1) + (e.count ?? 1); last.error = last.error || e.error; continue }
48    folded.push({ ...e })
49  }
50  if (folded.length <= max) return { lines: folded, dropped: 0 }
51  const beats = folded.filter(e => e.kind !== 'tool')
52  const tools = folded.filter(e => e.kind === 'tool')
53  const room = Math.max(0, max - beats.length)
54  const every = tools.length / Math.max(1, room)
55  const kept = new Set(Array.from({ length: Math.min(room, tools.length) }, (_, i) => tools[Math.floor(i * every)]!))
56  const lines = folded.filter(e => e.kind !== 'tool' || kept.has(e)).slice(0, max)
57  return { lines, dropped: folded.length - lines.length }
58}
59
60// The agent's task, its calls in their own words (at most 40), and what it reported, capped.
61export function storyInput(n: AgentNode, events: Step[]): string {
62  const { lines, dropped } = storyLines(events)
63  const shown = lines.map(s => `- ${s.kind === 'tool' ? '' : `[${s.kind}] `}${clip(s.summary, 160)}${s.count && s.count > 1 ? ` (×${s.count})` : ''}${s.error ? ' [failed]' : ''}`)
64  const more = dropped ? [`- … ${dropped} more calls not shown`] : []
65  const said = reportOf(n)?.result ?? clip(n.result)
66  return [
67    `Agent: ${clip(n.label, 120)}`,
68    `Task: ${clip(n.prompt)}`,
69    '',
70    'Tool log:',
71    capLines([...shown, ...more], STORY_CAP),
72    ...(said ? ['', `It reported: ${clip(said)}`] : []),
73  ].join('\n')
74}
75
76const jsonOf = (raw: string): Record<string, unknown> | undefined => {
77  const json = /\{[\s\S]*\}/.exec(raw)?.[0]
78  if (!json) return undefined
79  try { return JSON.parse(json) as Record<string, unknown> } catch { return undefined }
80}
81const texts = (x: unknown, n: number, max: number): string[] =>
82  (Array.isArray(x) ? x : []).map(i => clip(typeof i === 'string' ? i : '', n)).filter(Boolean).slice(0, max)
83
84// A reply as story steps: the JSON asked for, else its bulleted or numbered lines.
85export function parseStory(raw: string): string[] | undefined {
86  const d = jsonOf(raw)
87  const fromJson = d ? texts(d.steps, 160, 8) : []
88  if (fromJson.length) return fromJson
89  const lines = raw.split('\n').map(l => /^\s*(?:[-*•]|\d+[.)])\s+(.+)$/.exec(l)?.[1]).filter((l): l is string => !!l).map(l => clip(l, 160)).slice(0, 8)
90  return lines.length ? lines : undefined
91}
92
93// ── explain this run: how the work hung together ─────────────────────────────
94
95export const EXPLAIN_SYSTEM = [
96  'You explain one finished or running piece of AI agent work to the person who asked for it.',
97  'Write in Simplified Technical English, about 60% of the way:',
98  '- One idea per sentence. At most 15 words in a sentence.',
99  '- Use active voice and plain words. Name agents, files and numbers exactly as the input gives them.',
100  '- No hedging, no filler, no praise. Use only facts in the input; write "unknown" when it does not say.',
101  '- At most 250 words in total. At most 5 items in each list.',
102  'Reply with JSON only, no markdown:',
103  '{"goal": "1 sentence: what the work set out to do",',
104  ' "who": [{"agent": "agent name", "did": "1 sentence"}],',
105  ' "connected": "1 or 2 sentences: how the parts fed each other",',
106  ' "outcome": "1 or 2 sentences: what it achieved",',
107  ' "open": ["what is still open or wrong"]}',
108  'The pane shows outcome first, as a heading. Its first sentence is the verdict: at most 12 words, with the key number.',
109].join('\n')
110
111// The run's own report, its part reports, each agent's steps or result, and what needs a look.
112export function explainInput(run: AgentNode, nodes: AgentNode[], insights: string[]): string {
113  const r = reportOf(run)
114  const scope = scopeNodes(nodes, { kind: 'node', id: run.id })
115  const agents = scope.filter(n => n.kind === 'agent').sort((a, b) => a.startedAt - b.startedAt)
116  const parts = Object.entries(run.partReports ?? {}).map(([phase, p]) => `- ${phase} phase: ${clip(p.result) || 'unknown'}${p.problems?.length ? ` Problems: ${p.problems.map(x => x.text).join(' ')}` : ''}`)
117  const agentLines = agents.map(a => {
118    const steps = a.story?.steps?.length ? a.story.steps.join(' ') : reportOf(a)?.result ?? clip(a.result) ?? ''
119    const parent = a.parentId && a.parentId !== run.id ? scope.find(p => p.id === a.parentId)?.label : undefined
120    return `- ${a.label} [${a.status}${a.phase ? `, ${a.phase} phase` : ''}${parent ? `, started by ${parent}` : ''}]: ${clip(steps) || 'no report'}`
121  })
122  const files = fileRows(scope).map(f => `${f.path} (+${f.added} −${f.removed})`)
123  return [
124    `Run: ${clip(run.label, 200)} (${run.kind}, ${run.status})`,
125    `Task: ${clip(run.prompt)}`,
126    '',
127    'Run report:',
128    capLines([
129      ...(r?.result ? [`- Result: ${clip(r.result)}`] : []),
130      ...(r?.decisions ?? []).map(d => `- Decision: ${clip(d.text)}${d.source ? ` [${d.source}]` : ''}`),
131      ...(r?.problems ?? []).map(p => `- Problem: ${clip(p.text)}${p.source ? ` [${p.source}]` : ''}`),
132      ...(r?.next ? [`- Next: ${clip(r.next)}`] : []),
133    ], 1500) || '- none',
134    ...(parts.length ? ['', 'Part reports:', capLines(parts, 1500)] : []),
135    '',
136    `Agents (${agents.length}):`,
137    capLines(agentLines, EXPLAIN_CAP - 3000),
138    ...(files.length ? ['', `Files changed: ${capLines(files.map(f => `- ${f}`), 600)}`] : []),
139    ...(insights.length ? ['', 'Needs a look:', capLines(insights.map(t => `- ${clip(t)}`), 600)] : []),
140  ].join('\n').slice(0, EXPLAIN_CAP)
141}
142
143// A reply as a brief. Fields it cannot read are left out, never undefined.
144export function parseBrief(raw: string): Omit<Brief, 'model' | 'at'> | undefined {
145  const d = jsonOf(raw)
146  if (!d) return undefined
147  const out: Omit<Brief, 'model' | 'at'> = {}
148  const goal = clip(typeof d.goal === 'string' ? d.goal : '')
149  if (goal) out.goal = goal
150  const who = (Array.isArray(d.who) ? d.who : []).flatMap(w => {
151    if (typeof w === 'string') return clip(w) ? [clip(w)] : []
152    const x = w as { agent?: unknown; did?: unknown } | null
153    const did = clip(typeof x?.did === 'string' ? x.did : '')
154    const agent = clip(typeof x?.agent === 'string' ? x.agent : '', 80)
155    return did ? [agent ? `${agent}: ${did}` : did] : []
156  }).slice(0, 5)
157  if (who.length) out.who = who
158  const connected = clip(typeof d.connected === 'string' ? d.connected : '')
159  if (connected) out.connected = connected
160  const outcome = clip(typeof d.outcome === 'string' ? d.outcome : '')
161  if (outcome) out.outcome = outcome
162  const open = texts(d.open, LINE, 5)
163  if (open.length) out.open = open
164  return Object.keys(out).length ? out : undefined
165}
166
167// ── patterns across runs ─────────────────────────────────────────────────────
168
169export const PATTERNS_SYSTEM = [
170  'You read a list of past AI agent runs and find what repeats: failures with one cause, files many runs change, costly agent types, slow phases.',
171  'Write in Simplified Technical English, about 60% of the way: one idea per sentence, at most 15 words, active voice, plain words, exact names and numbers.',
172  'Use only facts in the input. Each pattern must rest on at least 2 runs. No hedging, no filler.',
173  'Write 2 to 4 patterns. Each has a short title, one evidence sentence with numbers, one concrete thing to try, and the exact names of the runs it rests on.',
174  'Reply with JSON only, no markdown:',
175  '{"patterns": [{"title": "", "evidence": "", "try": "", "runs": ["run name"]}]}',
176].join('\n')
177
178const durationText = (ms: number) => (ms < 60_000 ? `${Math.round(ms / 1000)}s` : `${Math.round(ms / 60_000)}m`)
179
180// One compact row per run, newest first, at most 50 runs and 8,000 characters.
181export function patternsInput(runs: AgentNode[], nodes: AgentNode[]): string {
182  const rows = runs.slice(0, PATTERN_RUNS).map(run => {
183    const scope = scopeNodes(nodes, { kind: 'node', id: run.id })
184    const agents = scope.filter(n => n.kind === 'agent')
185    const r = reportOf(run)
186    const files = fileRows(scope)
187    const models = [...new Set(agents.map(a => prettyModel(a.model)).filter(Boolean))].join('/')
188    const tokens = agents.reduce((a, n) => a + (n.tokens ?? 0), 0) || run.tokens || 0
189    const failed = agents.filter(a => a.status === 'failed' || a.status === 'killed').map(a => `${a.label} (${a.status === 'failed' ? 'failed' : 'stopped'}${reportOf(a)?.result ? `: ${clip(reportOf(a)!.result, 80)}` : ''})`)
190    return clip([
191      `- "${clip(run.label, 100)}" [${run.status}] ${run.kind}${run.kind !== 'agent' ? `, ${childrenOf(nodes, run.id).length} parts` : ''}`,
192      models && `models ${models}`,
193      tokens && `${Math.round(tokens / 1000)}k tokens`,
194      run.endedAt && `${durationText(run.endedAt - run.startedAt)}`,
195      files.length && `files ${files.slice(0, 4).map(f => f.path.split('/').pop()).join(', ')}${files.length > 4 ? ` +${files.length - 4}` : ''}`,
196      r?.result && `result: ${clip(r.result, 120)}`,
197      r?.problems?.length && `problems: ${r.problems.map(p => clip(p.text, 80)).join('; ')}`,
198      failed.length && `failed: ${failed.join('; ')}`,
199    ].filter(Boolean).join(' · '), LINE + 120)
200  })
201  const more = runs.length > PATTERN_RUNS ? [`- … ${runs.length - PATTERN_RUNS} older runs not shown`] : []
202  return [`Runs, newest first (${Math.min(runs.length, PATTERN_RUNS)} of ${runs.length}):`, capLines([...rows, ...more], PATTERNS_CAP)].join('\n')
203}
204
205// A reply as pattern cards: each card keeps only the runs it names that exist, by id.
206export function parsePatterns(raw: string, runs: AgentNode[]): PatternCard[] | undefined {
207  const d = jsonOf(raw)
208  if (!d) return undefined
209  const byLabel = new Map(runs.map(r => [r.label.trim().toLowerCase(), r]))
210  const cards = (Array.isArray(d.patterns) ? d.patterns : []).flatMap(p => {
211    const x = p as { title?: unknown; evidence?: unknown; try?: unknown; runs?: unknown } | null
212    const title = clip(typeof x?.title === 'string' ? x.title : '', 90)
213    if (!title) return []
214    const card: PatternCard = { title, runs: [] }
215    const evidence = clip(typeof x?.evidence === 'string' ? x.evidence : '')
216    if (evidence) card.evidence = evidence
217    const tryIt = clip(typeof x?.try === 'string' ? x.try : '')
218    if (tryIt) card.try = tryIt
219    for (const name of texts(x?.runs, 200, 8)) {
220      const hit = byLabel.get(name.trim().toLowerCase().replace(/^"|"$/g, ''))
221      if (hit && !card.runs.some(r => r.id === hit.id)) card.runs.push({ id: hit.id, label: hit.label })
222    }
223    return [card]
224  }).slice(0, 4)
225  return cards.length ? cards : undefined
226}
227
228// "just now", "12m ago", "3h ago", "2d ago": how old an AI-written block is.
229export function ago(ms: number): string {
230  if (ms < 60_000) return 'just now'
231  if (ms < 3_600_000) return `${Math.round(ms / 60_000)}m ago`
232  if (ms < 48 * 3_600_000) return `${Math.round(ms / 3_600_000)}h ago`
233  return `${Math.round(ms / 86_400_000)}d ago`
234}
235
hooks/lens.ts 285 lines
1import type { AgentNode } from '../types'
2import { childrenOf, counts, firstSentence, overlaps, passes, pipeline, scopeNodes, type Filter } from './list'
3
4// Four ways to look at the same runs: their shape (tree), where they stand
5// (board), where the time went (timeline), and, inside a run, the trail of what
6// each agent did and handed to the others (trace). Pure: the view draws what these return.
7export type Lens = 'tree' | 'board' | 'timeline' | 'trace'
8export const LENSES: Lens[] = ['tree', 'board', 'timeline', 'trace']
9export const LENS_NAMES: Record<Lens, string> = { tree: 'Tree', board: 'Board', timeline: 'Timeline', trace: 'Trace' }
10// The lenses a place offers: a trace needs a run open.
11export const lensesFor = (hasRun: boolean): Lens[] => (hasRun ? LENSES : LENSES.filter(l => l !== 'trace'))
12
13export type Column = 'running' | 'done' | 'failed'
14export const COLUMNS: Column[] = ['running', 'done', 'failed']
15export const columnOf = (n: Pick<AgentNode, 'status'>): Column => (n.status === 'running' ? 'running' : n.status === 'done' ? 'done' : 'failed')
16
17export type Lane = { key: string; title: string; kind: 'phase' | 'cluster' | 'workflow' | 'agent' | 'singles'; cards: AgentNode[] }
18
19const byStart = (a: AgentNode, b: AgentNode) => a.startedAt - b.startedAt
20const agentsUnder = (nodes: AgentNode[], id: string) => scopeNodes(nodes, { kind: 'node', id }).filter(n => n.kind === 'agent')
21
22// The board's swimlanes. Inside a workflow: one lane per phase. Inside a cluster:
23// one lane for its members. Inside a subagent: one lane, it and its own subagents.
24// On the run list: one lane per workflow or cluster, and one for single agents.
25export function boardLanes(run: AgentNode | undefined, nodes: AgentNode[], tops: AgentNode[], filter: Filter): Lane[] {
26  const keep = (list: AgentNode[]) => list.filter(n => passes(n, [], filter)).sort(byStart)
27  if (run) {
28    if (run.kind === 'workflow') {
29      return pipeline(run, nodes)
30        .map(p => ({ key: `${run.id}:${p.phase}`, title: p.phase, kind: 'phase' as const, cards: keep(childrenOf(nodes, run.id).filter(k => (k.phase ?? 'Agents') === p.phase).flatMap(k => agentsUnder(nodes, k.id))) }))
31        .filter(l => l.cards.length > 0)
32    }
33    const kind = run.kind === 'group' ? 'cluster' : 'agent'
34    return [{ key: run.id, title: run.label, kind, cards: keep(agentsUnder(nodes, run.id).filter(n => run.kind === 'agent' || n.id !== run.id)) }]
35  }
36  const lanes: Lane[] = []
37  const singles: AgentNode[] = []
38  for (const t of tops) {
39    if (t.kind === 'agent') { singles.push(...agentsUnder(nodes, t.id)); continue }
40    const cards = keep(agentsUnder(nodes, t.id))
41    if (cards.length) lanes.push({ key: t.id, title: t.label, kind: t.kind === 'group' ? 'cluster' : 'workflow', cards })
42  }
43  if (singles.length) lanes.push({ key: 'singles', title: 'Single agents', kind: 'singles', cards: keep(singles) })
44  return lanes
45}
46
47// depth: how far under the run's own agents a bar sits (0 = spawned by the run).
48// hidden: a folded bar's agents not shown.
49export type TimeRow = { kind: 'bar'; node: AgentNode; depth?: number; hidden?: number } | { kind: 'label'; text: string }
50
51// Agents in tree order: each agent, then the agents it spawned, each level by start.
52// Clusters and workflows in between hold agents but are not rows themselves.
53// `folded` ids keep their agents out and count them on the folded row.
54export function treeOrder(nodes: AgentNode[], rootId: string, folded: ReadonlySet<string> = new Set()): { node: AgentNode; depth: number; hidden?: number }[] {
55  const out: { node: AgentNode; depth: number; hidden?: number }[] = []
56  const walk = (id: string, depth: number) => {
57    for (const k of childrenOf(nodes, id).sort(byStart)) {
58      if (k.kind !== 'agent') { walk(k.id, depth); continue }
59      if (folded.has(k.id)) {
60        const n = agentsUnder(nodes, k.id).filter(x => x.id !== k.id).length
61        out.push({ node: k, depth, ...(n ? { hidden: n } : {}) })
62        continue
63      }
64      out.push({ node: k, depth })
65      walk(k.id, depth + 1)
66    }
67  }
68  walk(rootId, 0)
69  return out
70}
71
72const foldedSet = (keys: readonly string[]) => new Set(keys.filter(k => k.startsWith('tl:')).map(k => k.slice(3)))
73const asBars = (list: { node: AgentNode; depth: number; hidden?: number }[]): TimeRow[] =>
74  list.map(r => ({ kind: 'bar' as const, node: r.node, depth: r.depth, ...(r.hidden ? { hidden: r.hidden } : {}) }))
75
76// The timeline's rows: on the run list one bar per run; inside a workflow its agents
77// under phase labels; inside a cluster or a subagent every agent under it.
78export function timelineRows(run: AgentNode | undefined, nodes: AgentNode[], tops: AgentNode[], filter: Filter, folds: readonly string[] = []): TimeRow[] {
79  if (!run) return tops.filter(n => passes(n, childrenOf(nodes, n.id), filter)).map(node => ({ kind: 'bar' as const, node }))
80  if (run.kind === 'workflow') {
81    const out: TimeRow[] = []
82    for (const p of pipeline(run, nodes)) {
83      // each of the phase's agents, then the agents it spawned under it
84      const folded = foldedSet(folds)
85      const list = childrenOf(nodes, run.id).filter(k => (k.phase ?? 'Agents') === p.phase && passes(k, [], filter)).sort(byStart)
86        .flatMap(k => (k.kind !== 'agent'
87          ? treeOrder(nodes, k.id, folded)
88          : folded.has(k.id)
89            ? [{ node: k, depth: 0, ...(agentsUnder(nodes, k.id).length > 1 ? { hidden: agentsUnder(nodes, k.id).length - 1 } : {}) }]
90            : [{ node: k, depth: 0 }, ...treeOrder(nodes, k.id, folded).map(r => ({ ...r, depth: r.depth + 1 }))]))
91      if (!list.length) continue
92      out.push({ kind: 'label', text: p.phase })
93      out.push(...asBars(list))
94    }
95    return out
96  }
97  // a run that is an agent leads with its own bar; its sub-agents sit under it
98  const folded = foldedSet(folds)
99  const under = treeOrder(nodes, run.id, folded).filter(r => passes(r.node, [], filter))
100  return asBars(run.kind === 'agent' ? [{ node: run, depth: 0 }, ...under.map(r => ({ ...r, depth: r.depth + 1 }))] : under)
101}
102
103// A live run's agents as status groups: running, then failed or stopped, then done;
104// each group by start time.
105const GROUP_ORDER = ['running', 'failed', 'killed', 'done'] as const
106export function liveGroups(nodes: AgentNode[], runId: string): { status: AgentNode['status']; nodes: AgentNode[] }[] {
107  const agents = agentsUnder(nodes, runId).filter(n => n.id !== runId).sort(byStart)
108  return GROUP_ORDER.map(status => ({ status, nodes: agents.filter(n => n.status === status) })).filter(g => g.nodes.length)
109}
110
111// The run list's timeline, opened up: each run as a heading with its agents under
112// it, newest runs first (at most `maxRuns`), so the picture shows who ran when.
113// A run that is one agent stays one bar, with no heading.
114export function listTimelineRows(nodes: AgentNode[], tops: AgentNode[], maxRuns = 8): { rows: TimeRow[]; runs: number; hidden: number } {
115  const shown = [...tops].sort((a, b) => b.startedAt - a.startedAt).slice(0, maxRuns).sort(byStart)
116  const rows: TimeRow[] = []
117  for (const top of shown) {
118    if (top.kind === 'agent' && !childrenOf(nodes, top.id).length) { rows.push({ kind: 'bar', node: top }); continue }
119    rows.push({ kind: 'label', text: top.label })
120    for (const node of agentsUnder(nodes, top.id).filter(n => n.id !== top.id || top.kind === 'agent').sort(byStart)) rows.push({ kind: 'bar', node })
121  }
122  return { rows, runs: shown.length, hidden: Math.max(0, tops.length - shown.length) }
123}
124
125// ── insights: what needs a look, each pointing at the item it names ─────────
126
127export const QUIET_MS = 120_000
128export type Insight = { kind: 'quiet' | 'overlap' | 'failed' | 'slow' | 'tokens'; text: string; target?: string; tone: 'warn' | 'bad' | 'info' }
129
130const mins = (ms: number) => (ms < 60_000 ? `${Math.max(1, Math.round(ms / 1000))}s` : `${Math.round(ms / 60_000)}m`)
131const short = (p: string) => p.split('/').filter(Boolean).pop() ?? p
132const kTok = (n: number) => (n >= 1_000_000 ? `${(n / 1_000_000).toFixed(1)}M` : n >= 1000 ? `${Math.round(n / 1000)}k` : String(n))
133const list2 = (names: string[]) => (names.length <= 2 ? names.join(', ') : `${names.slice(0, 2).join(', ')} +${names.length - 2}`)
134
135// The scope is every node the view shows (a run's subtree, or the tab's runs).
136export function insights(scope: AgentNode[], all: AgentNode[], now: number): Insight[] {
137  const agents = scope.filter(n => n.kind === 'agent')
138  const out: Insight[] = []
139  for (const n of agents) {
140    if (n.status !== 'running') continue
141    const since = now - (n.lastToolAt ?? n.startedAt)
142    if (since >= QUIET_MS) out.push({ kind: 'quiet', tone: 'warn', target: n.id, text: `${n.label} made no tool call for ${mins(since)}.` })
143  }
144  for (const o of overlaps(agents)) {
145    out.push({ kind: 'overlap', tone: 'warn', target: o.by[0]!.id, text: `${o.by.length} agents edited ${short(o.path)}: ${list2(o.by.map(b => b.label))}.` })
146  }
147  const failed = agents.filter(n => n.status === 'failed')
148  if (failed.length) out.push({ kind: 'failed', tone: 'bad', target: failed[0]!.id, text: `${failed.length} agent${failed.length === 1 ? '' : 's'} failed: ${list2(failed.map(f => f.label))}.` })
149  // the slowest phase of each workflow in scope, when it took most of the time
150  for (const wf of scope.filter(n => n.kind === 'workflow')) {
151    const spans = pipeline(wf, all).map(p => {
152      const list = childrenOf(all, wf.id).filter(k => (k.phase ?? 'Agents') === p.phase)
153      const start = Math.min(...list.map(k => k.startedAt))
154      const end = Math.max(...list.map(k => k.endedAt ?? now))
155      return { phase: p.phase, ms: Math.max(0, end - start) }
156    }).filter(p => Number.isFinite(p.ms))
157    if (spans.length < 2 || spans.some(p => p.ms <= 0)) continue
158    const total = spans.reduce((a, p) => a + p.ms, 0)
159    const top = [...spans].sort((a, b) => b.ms - a.ms)[0]!
160    const share = total > 0 ? Math.round((top.ms / total) * 100) : 0
161    if (share >= 60 && total >= 10_000) out.push({ kind: 'slow', tone: 'info', target: wf.id, text: `The ${top.phase} phase took ${share}% of the time.` })
162  }
163  const spent = agents.filter(n => (n.tokens ?? 0) > 0)
164  if (spent.length >= 2) {
165    const total = spent.reduce((a, n) => a + (n.tokens ?? 0), 0)
166    const top = [...spent].sort((a, b) => (b.tokens ?? 0) - (a.tokens ?? 0))[0]!
167    out.push({ kind: 'tokens', tone: 'info', target: top.id, text: `${top.label} used ${Math.round(((top.tokens ?? 0) / total) * 100)}% of the tokens (${kTok(top.tokens ?? 0)} of ${kTok(total)}).` })
168  }
169  return out
170}
171
172// A cluster's aspects: what each member covers, with how it went.
173export const aspects = (nodes: AgentNode[], groupId: string) =>
174  childrenOf(nodes, groupId).sort(byStart).map(k => ({ node: k, text: firstSentence(k.label, 40) }))
175
176// Done of total, for a roll-up: finished (done, failed or stopped) out of all.
177export const rollup = (list: AgentNode[]) => {
178  const c = counts(list)
179  return { ...c, finished: c.total - c.running }
180}
181
182// ── where the time went: the chain that set the end time, and the idle time ──
183
184// Agents count as one after another when the later one starts within this of the earlier one's end.
185const SLACK_MS = 3000
186const endOf = (n: AgentNode, now: number) => (n.status === 'running' ? now : n.endedAt ?? now)
187
188export type CriticalPath = { ids: string[]; ms: number; span: number }
189
190// The critical path: the agent that ended last, then, going back in time, the agent
191// that ended last before it started, and so on. Shortening any of them shortens the
192// run; the others ran beside them. Needs two agents or more.
193export function criticalPath(agents: AgentNode[], now: number): CriticalPath | undefined {
194  const list = agents.filter(n => n.kind === 'agent')
195  if (list.length < 2) return undefined
196  const t0 = Math.min(...list.map(n => n.startedAt))
197  const t1 = Math.max(...list.map(n => endOf(n, now)))
198  const latest = (xs: AgentNode[]) => xs.reduce((a, b) => (endOf(b, now) > endOf(a, now) || (endOf(b, now) === endOf(a, now) && b.startedAt < a.startedAt) ? b : a))
199  const chain: AgentNode[] = [latest(list)]
200  for (;;) {
201    const cur = chain[chain.length - 1]!
202    const before = list.filter(n => !chain.includes(n) && endOf(n, now) <= cur.startedAt + SLACK_MS)
203    if (!before.length) break
204    chain.push(latest(before))
205  }
206  chain.reverse()
207  return { ids: chain.map(n => n.id), ms: chain.reduce((a, n) => a + Math.max(0, endOf(n, now) - n.startedAt), 0), span: t1 - t0 }
208}
209
210export type Gap = { from: number; to: number }
211
212// Stretches inside a run when none of its agents ran: the main session thinking,
213// or waiting for the person. Short gaps are noise and are left out.
214export function idleGaps(agents: AgentNode[], now: number): { gaps: Gap[]; ms: number } {
215  const spans = agents.filter(n => n.kind === 'agent').map(n => ({ from: n.startedAt, to: endOf(n, now) })).sort((a, b) => a.from - b.from)
216  if (spans.length < 2) return { gaps: [], ms: 0 }
217  const span = Math.max(...spans.map(s => s.to)) - spans[0]!.from
218  const least = Math.max(5000, span * 0.03)
219  const gaps: Gap[] = []
220  let reach = spans[0]!.to
221  for (const s of spans.slice(1)) {
222    if (s.from - reach >= least) gaps.push({ from: reach, to: s.from })
223    reach = Math.max(reach, s.to)
224  }
225  return { gaps, ms: gaps.reduce((a, g) => a + g.to - g.from, 0) }
226}
227
228// ── cost: tokens by model family ─────────────────────────────────────────────
229
230const FAMILIES = ['Fable', 'Opus', 'Sonnet', 'Haiku'] as const
231export const modelFamily = (m: string | undefined): string => FAMILIES.find(f => m?.toLowerCase().includes(f.toLowerCase())) ?? (m ? 'Other' : 'Unknown')
232
233// What the agents of a scope spent, per model family, most first.
234export function spendByModel(scope: AgentNode[]): { model: string; tokens: number; agents: number }[] {
235  const by = new Map<string, { model: string; tokens: number; agents: number }>()
236  for (const n of scope) {
237    if (n.kind !== 'agent' || !n.tokens) continue
238    const model = modelFamily(n.model)
239    const cur = by.get(model) ?? { model, tokens: 0, agents: 0 }
240    cur.tokens += n.tokens
241    cur.agents += 1
242    by.set(model, cur)
243  }
244  return [...by.values()].sort((a, b) => b.tokens - a.tokens)
245}
246
247// Tokens a node and everything under it spent.
248export const tokensUnder = (nodes: AgentNode[], n: AgentNode) =>
249  n.kind === 'agent' ? n.tokens ?? 0 : scopeNodes(nodes, { kind: 'node', id: n.id }).filter(k => k.kind === 'agent').reduce((a, k) => a + (k.tokens ?? 0), 0) || (n.tokens ?? 0)
250
251// ── flags: an insight, shown on the row it is about ──────────────────────────
252
253export type Flag = { tone: 'warn' | 'bad' | 'info'; text: string }
254
255// A short tag per row that needs a look: agents that edited a file another agent
256// also edited, the agent that spent the most, a workflow's slowest phase, and the
257// agent that ended last on the critical path. Keys: node ids, "phase:<wf>:<phase>".
258export function rowFlags(scope: AgentNode[], all: AgentNode[], now: number): Map<string, Flag> {
259  const out = new Map<string, Flag>()
260  const agents = scope.filter(n => n.kind === 'agent')
261  for (const o of overlaps(agents)) for (const b of o.by) if (!out.has(b.id)) out.set(b.id, { tone: 'warn', text: `⚠ shares ${short(o.path)}` })
262  const spent = agents.filter(n => (n.tokens ?? 0) > 0)
263  if (spent.length >= 3) {
264    const total = spent.reduce((a, n) => a + (n.tokens ?? 0), 0)
265    const top = [...spent].sort((a, b) => (b.tokens ?? 0) - (a.tokens ?? 0))[0]!
266    const share = Math.round(((top.tokens ?? 0) / total) * 100)
267    if (share >= 40 && !out.has(top.id)) out.set(top.id, { tone: 'info', text: `▲ ${share}% of tokens` })
268  }
269  for (const wf of scope.filter(n => n.kind === 'workflow')) {
270    const spans = pipeline(wf, all).map(p => {
271      const list = childrenOf(all, wf.id).filter(k => (k.phase ?? 'Agents') === p.phase)
272      return { phase: p.phase, ms: Math.max(...list.map(k => endOf(k, now))) - Math.min(...list.map(k => k.startedAt)) }
273    }).filter(p => Number.isFinite(p.ms) && p.ms > 0)
274    if (spans.length < 2) continue
275    const total = spans.reduce((a, p) => a + p.ms, 0)
276    const top = [...spans].sort((a, b) => b.ms - a.ms)[0]!
277    const share = Math.round((top.ms / total) * 100)
278    if (share >= 50) out.set(`phase:${wf.id}:${top.phase}`, { tone: 'info', text: `slowest · ${share}% of time` })
279  }
280  const path = criticalPath(agents, now)
281  const last = path && path.ids.length >= 2 ? path.ids[path.ids.length - 1]! : undefined
282  if (last && !out.has(last)) out.set(last, { tone: 'info', text: '◆ ended last' })
283  return out
284}
285
hooks/desktop/svg.ts 334 lines
1import type { NodeStatus } from '../../types'
2import type { ThemeName } from '../theme'
3import { ART, type ArtSet, type Slot } from './sprites'
4
5// Every picture the desktop view draws, as SVG source strings. An Svg element is
6// drawn as an image, where currentColor means nothing, so every colour is written
7// out from the desk tokens. Sizes are CSS pixels.
8
9// The desktop can not tell its light or dark mode to a plugin, so these tokens are
10// mid-tone hues that read on both; text and grounds stay the surface's own.
11export type DeskTokens = {
12  name: ThemeName
13  // the pixel art drawn in place of line icons; minimal has none
14  art?: ArtSet
15  // the empty states' titles, and what the empty Live scene shows (its alt text)
16  words: { emptyLive: string; emptyHistory: string; scene: string }
17  accent: string
18  ok: string
19  warn: string
20  bad: string
21  stop: string
22  muted: string
23  rule: string
24  add: string
25  del: string
26  lanes: string[]
27}
28
29export const DESK: Record<ThemeName, DeskTokens> = {
30  minimal: {
31    name: 'minimal', accent: '#3b82f6', ok: '#16a34a', warn: '#d97706', bad: '#dc2626', stop: '#6b7280',
32    muted: '#6b7280', rule: '#9ca3af', add: '#16a34a', del: '#dc2626',
33    lanes: ['#3b82f6', '#8b5cf6', '#0891b2', '#0d9488', '#ea580c', '#64748b'],
34    words: { emptyLive: 'Nothing is running right now.', emptyHistory: 'No finished runs yet.', scene: '' },
35  },
36  kitty: {
37    name: 'kitty', accent: '#e8735a', ok: '#4d9e5c', warn: '#d9893b', bad: '#d9566e', stop: '#9b7f86',
38    muted: '#9b7f86', rule: '#d8b8a8', add: '#4d9e5c', del: '#d9566e',
39    lanes: ['#e8735a', '#a874c4', '#3aa6c4', '#3ea58f', '#d9893b', '#9b7f86'],
40    art: ART.kitty,
41    words: { emptyLive: 'No cats out.', emptyHistory: 'No cats have come home yet.', scene: 'A cat asleep on a keyboard' },
42  },
43  fish: {
44    name: 'fish', accent: '#2f8fc4', ok: '#2f9e6a', warn: '#d9973b', bad: '#d9566e', stop: '#7c8fa0',
45    muted: '#7c8fa0', rule: '#a9c3d4', add: '#2f9e6a', del: '#d9566e',
46    lanes: ['#2f8fc4', '#8b6fd6', '#2aa198', '#d9893b', '#c06c9f', '#7c8fa0'],
47    art: ART.fish,
48    words: { emptyLive: 'Lines are dry.', emptyHistory: 'Nothing in the bucket yet.', scene: 'A rod propped on a dock at night, a fish asleep below' },
49  },
50  dog: {
51    name: 'dog', accent: '#c98a3c', ok: '#4d9e5c', warn: '#c99a1f', bad: '#d9566e', stop: '#9b8670',
52    muted: '#9b8670', rule: '#d8c2a8', add: '#4d9e5c', del: '#d9566e',
53    lanes: ['#c98a3c', '#6f8fd6', '#3ea58f', '#c06c9f', '#8fa62a', '#9b8670'],
54    art: ART.dog,
55    words: { emptyLive: 'No dogs out.', emptyHistory: 'No dogs are back from walks yet.', scene: 'A dog asleep by its dog house' },
56  },
57}
58
59// Running wears the theme's own accent (fish water, kitty coral), so a live run looks
60// like its theme; done is calm, so running and failed stand out. Amber (warn) means
61// "needs a look" only. Status never rests on red vs green: a glyph or word goes with it.
62export const statusColor = (t: DeskTokens, s: NodeStatus) =>
63  s === 'running' ? t.accent : s === 'done' ? t.muted : s === 'failed' ? t.bad : t.stop
64
65const esc = (s: string) => s.replace(/&/g, '&amp;').replace(/</g, '&lt;').replace(/>/g, '&gt;').replace(/"/g, '&quot;')
66
67// ── pixel sprites ────────────────────────────────────────────────────────────
68// One rect per run of same-coloured pixels in a row, so a 16×16 sprite stays a
69// few hundred characters and the 64×40 scene stays far under the 131072 cap.
70function spriteRects(grid: readonly string[], pal: Record<string, string>, dx = 0): string {
71  let out = ''
72  grid.forEach((row, y) => {
73    let x = 0
74    while (x < row.length) {
75      const ch = row[x]!
76      if (ch === '.') { x++; continue }
77      let end = x + 1
78      while (end < row.length && row[end] === ch) end++
79      out += `<rect x="${x + dx}" y="${y}" width="${end - x}" height="1" fill="${pal[ch]}"/>`
80      x = end
81    }
82  })
83  return out
84}
85
86export const SPRITE_FOR: Record<NodeStatus, Slot> = { running: 'walk0', done: 'done', failed: 'failed', killed: 'stopped' }
87
88export function spriteSvg(art: ArtSet, name: Slot, px: number): string {
89  const grid = art.pix[name]
90  const w = grid[0]!.length
91  const h = grid.length
92  const scale = px / Math.max(w, h)
93  return `<svg xmlns="http://www.w3.org/2000/svg" width="${Math.round(w * scale)}" height="${Math.round(h * scale)}" viewBox="0 0 ${w} ${h}" shape-rendering="crispEdges">${spriteRects(grid, art.pal)}</svg>`
94}
95
96// The running sprite walks one frame per redraw tick (the pane redraws each second).
97// A plain image: an interactive Svg would sit in a sandboxed frame, which drew a white
98// box and blanked on every redraw.
99export const walkSlot = (now: number): Slot => (['walk0', 'walk1', 'walk2', 'walk3'] as const)[Math.floor(now / 1000) % 4]!
100
101// ── minimal: one line-icon set, 16 px grid ───────────────────────────────────
102const ICON: Record<string, string> = {
103  workflow: '<circle cx="3.75" cy="4.25" r="1.75"/><circle cx="12.25" cy="4.25" r="1.75"/><circle cx="8" cy="11.75" r="1.75"/><path d="M4.8 5.7 7.1 10.2M11.2 5.7 8.9 10.2"/>',
104  group: '<rect x="2.5" y="5.5" width="8" height="8" rx="2"/><path d="M5.5 3h5.5a2 2 0 0 1 2 2v5.5"/>',
105  agent: '<circle cx="8" cy="8" r="5.25"/><circle cx="8" cy="8" r="1.6" fill="COLOR" stroke="none"/>',
106  running: '<circle cx="8" cy="8" r="5.75" opacity=".25"/><path d="M8 2.25a5.75 5.75 0 0 1 5.75 5.75"/>',
107  done: '<circle cx="8" cy="8" r="6"/><path d="m5.3 8.2 1.85 1.85L10.8 6.2"/>',
108  failed: '<circle cx="8" cy="8" r="6"/><path d="m5.9 5.9 4.2 4.2m0-4.2-4.2 4.2"/>',
109  killed: '<circle cx="8" cy="8" r="6"/><rect x="6" y="6" width="4" height="4" rx="1" fill="COLOR" stroke="none"/>',
110  quiet: '<circle cx="8" cy="8" r="6"/><path d="M6 6.5h4l-4 3.5h4"/>',
111  worktree: '<circle cx="4.5" cy="3.5" r="1.5"/><circle cx="4.5" cy="12.5" r="1.5"/><circle cx="11.5" cy="5" r="1.5"/><path d="M4.5 5v6M11.5 6.5c0 3-7 1.8-7 4.5"/>',
112  file: '<path d="M4 2.25h5l3 3v8.5H4Z"/><path d="M9 2.25v3h3"/>',
113  warn: '<path d="M8 2.5 14 13H2Z"/><path d="M8 6.5v3M8 11.2v.1"/>',
114  info: '<circle cx="8" cy="8" r="6"/><path d="M8 7.5v3.5M8 5v.1"/>',
115  empty: '<circle cx="8" cy="8" r="6" stroke-dasharray="2 2"/>',
116}
117
118export function iconSvg(name: string, color: string, px = 16): string {
119  const body = (ICON[name] ?? ICON.agent!).replace(/COLOR/g, color)
120  return `<svg xmlns="http://www.w3.org/2000/svg" width="${px}" height="${px}" viewBox="0 0 16 16" fill="none" stroke="${color}" stroke-width="1.5" stroke-linecap="round" stroke-linejoin="round">${body}</svg>`
121}
122
123// ── small charts ─────────────────────────────────────────────────────────────
124
125// A bar split by status: done, running, failed, stopped, then the empty track.
126export function statusBarSvg(t: DeskTokens, c: { done: number; running: number; failed: number; stopped: number; total: number }, w = 96, h = 6): string {
127  const total = Math.max(1, c.total)
128  const parts: [number, string][] = [[c.done, statusColor(t, 'done')], [c.running, statusColor(t, 'running')], [c.failed, statusColor(t, 'failed')], [c.stopped, statusColor(t, 'killed')]]
129  let x = 0
130  let rects = `<rect x="0" y="0" width="${w}" height="${h}" rx="${h / 2}" fill="${t.rule}" opacity=".35"/>`
131  for (const [n, color] of parts) {
132    if (!n) continue
133    const pw = (n / total) * w
134    rects += `<rect x="${x.toFixed(1)}" y="0" width="${pw.toFixed(1)}" height="${h}" fill="${color}"/>`
135    x += pw
136  }
137  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}"><clipPath id="c"><rect width="${w}" height="${h}" rx="${h / 2}"/></clipPath><g clip-path="url(#c)">${rects}</g></svg>`
138}
139
140// Lines added and removed as two proportional bars, the larger side scaled to `w`.
141export function diffBarSvg(t: DeskTokens, added: number, removed: number, max: number, w = 60, h = 6): string {
142  const m = Math.max(1, max)
143  const a = Math.max(added ? 2 : 0, Math.round((added / m) * w))
144  const r = Math.max(removed ? 2 : 0, Math.round((removed / m) * w))
145  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}"><rect x="0" y="0" width="${a}" height="${h}" rx="1" fill="${t.add}"/><rect x="${a + (a && r ? 1 : 0)}" y="0" width="${Math.min(r, w - a)}" height="${h}" rx="1" fill="${t.del}"/></svg>`
146}
147
148// Runs per day: bars from a data-derived scale, its extremes labelled.
149export function sparkSvg(t: DeskTokens, perDay: number[], w = 140, h = 34): string {
150  const max = Math.max(1, ...perDay)
151  const n = perDay.length || 1
152  const bw = (w - (n - 1) * 3) / n
153  const chartH = h - 12
154  const bars = perDay.map((v, i) => {
155    const bh = v ? Math.max(2, (v / max) * chartH) : 1
156    const isToday = i === n - 1
157    return `<rect x="${(i * (bw + 3)).toFixed(1)}" y="${(chartH - bh).toFixed(1)}" width="${bw.toFixed(1)}" height="${bh.toFixed(1)}" rx="1.5" fill="${isToday ? t.accent : t.rule}"/>`
158  }).join('')
159  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}">${bars}<text x="0" y="${h - 1}" font-size="9" font-family="-apple-system, sans-serif" fill="${t.muted}">7 days ago</text><text x="${w}" y="${h - 1}" font-size="9" font-family="-apple-system, sans-serif" fill="${t.muted}" text-anchor="end">today · max ${max}</text></svg>`
160}
161
162// ── the timeline: one bar per agent on a shared ruler ────────────────────────
163export type TimeBar = { label: string; start: number; end: number; status: NodeStatus; isHeader?: boolean; isSelected?: boolean; isCritical?: boolean }
164
165// `idle`: stretches when no agent ran, shaded across every row.
166export type TimelineOpts = { idle?: { from: number; to: number }[] }
167
168// Type sizes for the pictures. An Svg is the one place the pane sets its own type
169// size, so labels match the native text (about 13 px) instead of shrinking below it.
170export const PIC = { body: 13, small: 12, head: 12, rowH: 32, barH: 14, font: 'font-family="-apple-system, BlinkMacSystemFont, sans-serif"' } as const
171// About how many characters of 13 px text fit in a width.
172const fits = (px: number, size: number = PIC.body) => Math.max(6, Math.floor(px / (size * 0.56)))
173// The height a timeline of these rows draws at, for the Svg box.
174export const timelineHeight = (rows: number) => 30 + rows * PIC.rowH + 6
175
176// The pane's timeline draws its labels as native text (they follow the theme and
177// can be pressed), so its pictures are a ruler and one strip per bar.
178const QUARTERS = [0, 0.25, 0.5, 0.75, 1]
179export const STRIP_H = 24
180export function rulerSvg(t: DeskTokens, from: number, to: number, w: number): string {
181  const span = Math.max(1, to - from)
182  const pad = 4
183  const marks = QUARTERS.map(f => {
184    const tx = pad + f * (w - 2 * pad - 56)
185    return `<text x="${tx.toFixed(1)}" y="15" font-size="${PIC.small}" fill="${t.muted}" text-anchor="${f === 0 ? 'start' : f === 1 ? 'end' : 'middle'}" ${PIC.font}>${esc(clockOff(span * f))}</text>`
186  }).join('')
187  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="20" viewBox="0 0 ${w} 20">${marks}</svg>`
188}
189export function stripSvg(t: DeskTokens, b: TimeBar, from: number, to: number, w: number, idleGaps: { from: number; to: number }[] = []): string {
190  const span = Math.max(1, to - from)
191  const pad = 4
192  const plot = w - 2 * pad - 56
193  const x = (at: number) => pad + ((at - from) / span) * plot
194  const h = STRIP_H
195  const mid = h / 2
196  const grid = QUARTERS.map(f => `<line x1="${(pad + f * plot).toFixed(1)}" y1="0" x2="${(pad + f * plot).toFixed(1)}" y2="${h}" stroke="${t.rule}" stroke-opacity=".3"/>`).join('')
197  const idle = idleGaps.map(g => {
198    const x0 = x(Math.max(from, g.from))
199    const x1 = x(Math.min(to, g.to))
200    return x1 - x0 < 1 ? '' : `<rect x="${x0.toFixed(1)}" y="0" width="${(x1 - x0).toFixed(1)}" height="${h}" fill="${t.rule}" opacity=".16"/>`
201  }).join('')
202  const x0 = x(b.start)
203  const x1 = Math.max(x0 + 4, x(b.end))
204  const color = statusColor(t, b.status)
205  const crit = b.isCritical ? ` stroke="${t.accent}" stroke-width="2.5"` : ''
206  const live = b.status === 'running' ? `<rect x="${(x1 - 8).toFixed(1)}" y="${mid - PIC.barH / 2}" width="8" height="${PIC.barH}" fill="${color}" opacity=".5"/>` : ''
207  const bar = `<rect x="${x0.toFixed(1)}" y="${mid - PIC.barH / 2}" width="${(x1 - x0).toFixed(1)}" height="${PIC.barH}" rx="4" fill="${color}" opacity="${b.status === 'running' ? 0.75 : 0.92}"${crit}/>`
208  const dur = `<text x="${(x1 + 6).toFixed(1)}" y="${mid + 4}" font-size="${PIC.small}" fill="${t.muted}" ${PIC.font}>${esc(clockOff(b.end - b.start).slice(1))}</text>`
209  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}">${idle}${grid}${bar}${live}${dur}</svg>`
210}
211
212export function timelineSvg(t: DeskTokens, bars: TimeBar[], from: number, to: number, w: number, opts: TimelineOpts = {}): string {
213  // labels get their own column; bars never run under them
214  const LABEL = Math.min(300, Math.max(150, Math.round(w * 0.32)))
215  const DUR = 64
216  const plot = Math.max(80, w - LABEL - DUR - 12)
217  const span = Math.max(1, to - from)
218  const rowH = PIC.rowH
219  const top = 30
220  const h = timelineHeight(bars.length)
221  const F = PIC.font
222  const x = (at: number) => LABEL + ((at - from) / span) * plot
223  const ticks = [0, 0.25, 0.5, 0.75, 1].map(f => {
224    const tx = LABEL + f * plot
225    return `<line x1="${tx}" y1="${top - 6}" x2="${tx}" y2="${h}" stroke="${t.rule}" stroke-opacity=".3"/><text x="${tx}" y="16" font-size="${PIC.small}" fill="${t.muted}" text-anchor="${f === 0 ? 'start' : f === 1 ? 'end' : 'middle'}" ${F}>${esc(clockOff(span * f))}</text>`
226  }).join('')
227  const idle = (opts.idle ?? []).map(g => {
228    const x0 = x(Math.max(from, g.from))
229    const x1 = x(Math.min(to, g.to))
230    return x1 - x0 < 1 ? '' : `<rect x="${x0.toFixed(1)}" y="${top - 6}" width="${(x1 - x0).toFixed(1)}" height="${h - top + 6}" fill="${t.rule}" opacity=".16"><title>idle ${esc(clockOff(g.to - g.from).slice(1))}</title></rect>`
231  }).join('')
232  const rows = bars.map((b, i) => {
233    const y = top + i * rowH
234    const mid = y + rowH / 2
235    if (b.isHeader) {
236      // a run or phase heading: full width, with a rule above it
237      return `<line x1="0" y1="${y + 2}" x2="${w}" y2="${y + 2}" stroke="${t.rule}" stroke-opacity=".45"/><text x="0" y="${mid + 6}" font-size="${PIC.head}" font-weight="700" fill="${t.muted}" ${F}>${esc(clip(b.label, fits(w, PIC.head)))}</text>`
238    }
239    const x0 = x(b.start)
240    const x1 = Math.max(x0 + 4, x(b.end))
241    const color = statusColor(t, b.status)
242    const sel = b.isSelected ? `<rect x="0" y="${y + 2}" width="${w}" height="${rowH - 4}" fill="${t.accent}" opacity=".14" rx="5"/>` : ''
243    const live = b.status === 'running' ? `<rect x="${x1 - 8}" y="${mid - PIC.barH / 2}" width="8" height="${PIC.barH}" fill="${color}" opacity=".5"/>` : ''
244    // the critical path: an accent outline, and the label in bold
245    const crit = b.isCritical ? ` stroke="${t.accent}" stroke-width="2.5"` : ''
246    const weight = b.isCritical ? ' font-weight="600"' : ''
247    const label = `<text x="12" y="${mid + 5}" font-size="${PIC.body}" fill="${t.muted}"${weight} ${F}>${esc(clip(b.label, fits(LABEL - 20)))}<title>${esc(b.label)}</title></text>`
248    const bar = `<rect x="${x0.toFixed(1)}" y="${mid - PIC.barH / 2}" width="${(x1 - x0).toFixed(1)}" height="${PIC.barH}" rx="4" fill="${color}" opacity="${b.status === 'running' ? 0.75 : 0.92}"${crit}/>`
249    const dur = `<text x="${(x1 + 6).toFixed(1)}" y="${mid + 4}" font-size="${PIC.small}" fill="${t.muted}" ${F}>${esc(clockOff(b.end - b.start).slice(1))}</text>`
250    return `${sel}${label}${bar}${live}${dur}`
251  }).join('')
252  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}">${idle}${ticks}${rows}</svg>`
253}
254
255// ── the trace: lanes on a shared time axis, arrows between them ──────────────
256export type TraceMark = { lane: number; to?: number; at: number; kind: string; text: string; isSelected?: boolean }
257
258// `focus`: the lane of the agent picked elsewhere; the other lanes draw faint.
259export function traceSvg(t: DeskTokens, lanes: { label: string; chip: string; status: NodeStatus; depth?: number }[], marks: TraceMark[], from: number, to: number, w: number, focus?: number): string {
260  const LABEL = Math.min(240, Math.max(140, Math.round(w * 0.28)))
261  const plot = Math.max(80, w - LABEL - 20)
262  const span = Math.max(1, to - from)
263  const laneH = 40
264  const h = 24 + lanes.length * laneH + 8
265  const x = (at: number) => LABEL + ((at - from) / span) * plot
266  const yOf = (lane: number) => 24 + lane * laneH + laneH / 2
267  const color = (lane: number) => t.lanes[lane % t.lanes.length]!
268  const ruler = [0, 0.5, 1].map(f => `<text x="${LABEL + f * plot}" y="14" font-size="${PIC.small}" fill="${t.muted}" text-anchor="${f === 0 ? 'start' : f === 1 ? 'end' : 'middle'}" font-family="-apple-system, sans-serif">${esc(clockOff(span * f))}</text>`).join('')
269  const faint = (lane: number) => (focus !== undefined && focus >= 0 && lane !== focus ? ' opacity=".3"' : '')
270  const laneRows = lanes.map((l, i) => {
271    const y = yOf(i)
272    // a sub-agent's lane is indented under the lane that spawned it
273    const dx = Math.min(3, l.depth ?? 0) * 12
274    return `<g${faint(i)}><circle cx="${8 + dx}" cy="${y}" r="4" fill="${statusColor(t, l.status)}"/><text x="${18 + dx}" y="${y + 5}" font-size="${PIC.body}" fill="${t.muted}" font-family="-apple-system, sans-serif">${esc(clip(l.label, fits(LABEL - 26 - dx)))}</text><line x1="${LABEL}" y1="${y}" x2="${LABEL + plot}" y2="${y}" stroke="${color(i)}" stroke-opacity=".35" stroke-width="2"/></g>`
275  }).join('')
276  const arrows = marks.filter(m => m.to !== undefined && m.to !== m.lane).map(m => {
277    const x0 = x(m.at)
278    const y0 = yOf(m.lane)
279    const y1 = yOf(m.to!)
280    const dash = m.kind === 'message' ? ' stroke-dasharray="4 3"' : m.kind === 'handback' ? ' stroke-dasharray="1.5 3"' : ''
281    return `<path d="M${x0.toFixed(1)} ${y0} L${x0.toFixed(1)} ${y1 + (y1 > y0 ? -5 : 5)}" stroke="${color(m.lane)}" stroke-width="1.5"${dash}/><path d="M${(x0 - 4).toFixed(1)} ${y1 + (y1 > y0 ? -8 : 8)} L${x0.toFixed(1)} ${y1 + (y1 > y0 ? -2 : 2)} L${(x0 + 4).toFixed(1)} ${y1 + (y1 > y0 ? -8 : 8)}" fill="none" stroke="${color(m.lane)}" stroke-width="1.5"/>`
282  }).join('')
283  const dots = marks.map(m => {
284    const cx = x(m.at)
285    const cy = yOf(m.lane)
286    const c = m.kind === 'fail' ? t.bad : color(m.lane)
287    const ring = m.isSelected ? `<circle cx="${cx.toFixed(1)}" cy="${cy}" r="7" fill="none" stroke="${t.accent}" stroke-width="2"/>` : ''
288    const shape = m.kind === 'edit'
289      ? `<rect x="${(cx - 4).toFixed(1)}" y="${cy - 4}" width="8" height="8" transform="rotate(45 ${cx.toFixed(1)} ${cy})" fill="${c}"/>`
290      : m.kind === 'fail'
291        ? `<path d="M${(cx - 4).toFixed(1)} ${cy - 4}l8 8m0-8-8 8" stroke="${c}" stroke-width="2"/>`
292        : m.kind === 'quiet'
293          ? `<rect x="${(cx - 6).toFixed(1)}" y="${cy - 3}" width="12" height="6" fill="${t.rule}" opacity=".6"/>`
294          : `<circle cx="${cx.toFixed(1)}" cy="${cy}" r="3.5" fill="${c}"/>`
295    return `<g${faint(m.lane)}>${ring}${shape}<title>${esc(m.text)}</title></g>`
296  }).join('')
297  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w}" height="${h}" viewBox="0 0 ${w} ${h}">${ruler}${laneRows}${arrows}${dots}</svg>`
298}
299
300// ── a picture to save: a white page with a title, a subtitle and a legend over the drawing ──
301// `inner` is a whole <svg> of `innerH` rows; it is placed as a nested svg, so its own
302// coordinates stay as they are.
303export function pictureSvg(t: DeskTokens, title: string, subtitle: string, legend: string[], inner: string, w: number, innerH: number): string {
304  const PAD = 24
305  const head = 64
306  const foot = legend.length ? 28 : 8
307  const h = head + innerH + foot + PAD
308  const font = 'font-family="-apple-system, Helvetica, Arial, sans-serif"'
309  // legend items one after another, spaced by their own length (about 5.6 px a character at 11 px)
310  let lx = PAD
311  const keys = legend.map(k => {
312    const el = `<text x="${lx}" y="${head + innerH + 22}" font-size="11" fill="${t.muted}" ${font}>${esc(k)}</text>`
313    lx += Math.round(k.length * 5.6) + 28
314    return el
315  }).join('')
316  const body = inner.replace(/^<svg /, `<svg x="${PAD}" y="${head}" `)
317  return `<svg xmlns="http://www.w3.org/2000/svg" width="${w + PAD * 2}" height="${h}" viewBox="0 0 ${w + PAD * 2} ${h}">`
318    + `<rect width="100%" height="100%" fill="#ffffff"/>`
319    + `<text x="${PAD}" y="${PAD + 12}" font-size="17" font-weight="600" fill="#111827" ${font}>${esc(clip(title, 90))}</text>`
320    + `<text x="${PAD}" y="${PAD + 32}" font-size="12" fill="${t.muted}" ${font}>${esc(clip(subtitle, 140))}</text>`
321    + `${body}${keys}</svg>`
322}
323
324// ── helpers ──────────────────────────────────────────────────────────────────
325export const clip = (s: string, n: number) => (s.length > n ? `${s.slice(0, n - 1)}…` : s)
326
327function clockOff(ms: number): string {
328  const s = Math.round(ms / 1000)
329  if (s < 60) return `+${s}s`
330  const m = Math.floor(s / 60)
331  if (m < 60) return `+${m}m${s % 60 ? ` ${String(s % 60).padStart(2, '0')}s` : ''}`
332  return `+${Math.floor(m / 60)}h ${String(m % 60).padStart(2, '0')}m`
333}
334
hooks/desktop/pane.tsx 941 lines
1import type { AgentNode, DeskUi, EditRecord, PatternsDoc, TraceZoom, ViewProps } from '../../types'
2import { HISTORY_FILTERS, HISTORY_FILTER_NAMES, historyItems, historyStats, outcomeOf, runTokens } from '../history'
3import { boardLanes, criticalPath, idleGaps, insights, listTimelineRows, liveGroups, rollup, timelineRows, type Lane } from '../lens'
4import {
5  childrenOf, counts, fileRows, folderKey, joinNodes, lineDiff, noReportReason, overlaps, pipeline, prettyModel, prettyType, runKey,
6  runTree, scopeNodes, shortPaths, topItems, type Item,
7} from '../list'
8import { kTokens, reportFacts, reportOf } from '../report'
9import { ZOOMS, ZOOM_NAMES } from '../trace'
10import { unifiedHunks } from '../view'
11import {
12  BriefBlock, Chip, Empty, Heading, KindMark, PlainHeader, ReportBlock, SectionLabel, StatusMark, STATUS_GLYPH, STATUS_WORD, aiLabel, briefMarkdown, changeTotals, clock, duration, factsOf, metaLine, num,
13  mdText, outputMarkdown, tint, tokensOf, type Els, type Fact, type Part,
14} from './parts'
15import { STRIP_H, clip, diffBarSvg, iconSvg, rulerSvg, sparkSvg, spriteSvg, statusBarSvg, statusColor, stripSvg, traceSvg, walkSlot, type DeskTokens, type TimeBar } from './svg'
16
17// The desktop's own view of agent-tree: native controls, Svg pictures and pixel
18// cats, drawn straight into the pane (a Client's elements have no Svg). It takes
19// the same data the terminal view gets and the desk state; presses call `acts`,
20// which the hooks module turns into $.state writes.
21
22export type DeskActs = {
23  set: (patch: Partial<DeskUi>) => void
24  openDiff: (path: string | null) => void
25  askTrace: (run: string | null, zoom: TraceZoom, offset: number) => void
26  /** Ask Sonnet for a run's brief, or for patterns across runs (the hooks check ai: full again). */
27  explain: (run: string) => void
28  patterns: () => void
29  /** Save a run's timeline or trace as a picture in ~/Downloads/agent-tree (the hooks say where). */
30  exportPic: (run: string, lens: 'timeline' | 'trace', zoom: TraceZoom, focus?: string) => void
31}
32
33// Below this many columns nothing fits well, so the pane says so. The desktop
34// lays panes out in character cells, as the terminal does; a cell is about 7.5 px.
35export const MIN_COLUMNS = 60
36export const WIDE_COLUMNS = 120
37const CELL_PX = 7.5
38
39export function drawDesktop(els: Els, data: ViewProps, ui: DeskUi, acts: DeskActs, columns: number) {
40  const { Box, Text } = els
41  const t = tokensOf(data.theme ?? 'minimal')
42  const now = data.at
43  if (columns < MIN_COLUMNS) {
44    return (
45      <Box flexDirection="column" alignItems="center" paddingY={2}>
46        <Text color={t.muted}>Widen the pane to at least 480 px to see your agents.</Text>
47      </Box>
48    )
49  }
50  const here = data.repo ? folderKey(data.repo) : undefined
51  const history = ui.onlyRepo && here
52    ? (() => {
53      const byId = new Map(data.history.map(n => [n.id, n]))
54      const top = (n: AgentNode) => { let x = n; while (x.parentId && byId.has(x.parentId)) x = byId.get(x.parentId)!; return x }
55      return data.history.filter(n => runKey(top(n)) === here)
56    })()
57    : data.history
58  const pool = ui.tab === 'live' ? data.nodes : history
59  const all = joinNodes(data.nodes, data.history)
60  const run = ui.run ? (pool.find(n => n.id === ui.run) ?? all.find(n => n.id === ui.run)) : undefined
61  const wide = columns >= WIDE_COLUMNS
62  const ctx: Ctx = { els, t, ui, acts, now, all, pool, wide, columns, data }
63
64  return (
65    <Box flexDirection="column" gap={1} paddingX={1} paddingY={1}>
66      {Header(ctx, history, run)}
67      {Insights(ctx, run)}
68      {run ? RunView(ctx, run) : ui.tab === 'live' ? LiveList(ctx) : HistoryPage(ctx, history)}
69    </Box>
70  )
71}
72
73type Ctx = {
74  els: Els; t: DeskTokens; ui: DeskUi; acts: DeskActs; now: number; all: AgentNode[]; pool: AgentNode[]
75  wide: boolean; columns: number; data: ViewProps
76}
77
78const openRun = (c: Ctx, id: string | null) => {
79  c.acts.set({ run: id, sel: null, view: 'overview', file: null, traceOffset: 0, confirm: '', note: '', ...(id === null && c.ui.lens === 'trace' ? { lens: 'tree' as const } : {}) })
80  if (c.ui.file) c.acts.openDiff(null)
81  if (c.ui.lens === 'trace') c.acts.askTrace(id, c.ui.zoom, 0)
82}
83
84// A segmented control: one Button per option, the chosen one drawn as primary.
85function Segmented<T extends string>(c: Ctx, key: string, options: readonly [T, string, string?][], current: T, pick: (v: T) => void) {
86  const { Box, Button } = c.els
87  return (
88    <Box flexDirection="row" gap={0}>
89      {options.map(([v, label, hotkey]) => (
90        <Button key={`${key}:${v}`} label={label} {...(hotkey ? { hotkey } : {})} {...(v === current ? { variant: 'primary' as const } : {})} onPress={() => pick(v)} />
91      ))}
92    </Box>
93  )
94}
95
96// ── header: what you see, where, and how it is going ──────────────────────────
97function Header(c: Ctx, history: AgentNode[], run: AgentNode | undefined) {
98  const { Box, Text, Button, Input, Svg } = c.els
99  const { t, ui } = c
100  const liveTops = c.data.nodes.filter(n => !n.parentId || !c.data.nodes.some(m => m.id === n.parentId))
101  const running = liveTops.filter(n => n.status === 'running').length
102  const histRuns = history.filter(n => !n.parentId || !history.some(m => m.id === n.parentId)).length
103  const cnt = counts(c.pool.filter(n => n.kind === 'agent'))
104  // Board last: it is the view used least
105  const lenses: [DeskUi['lens'], string][] = [['tree', 'Tree'], ['timeline', 'Timeline'], ...(run ? [['trace', 'Trace'] as [DeskUi['lens'], string]] : []), ['board', 'Board']]
106  // a count draws in its colour only when it is not zero, so the eye lands on what is there
107  const tally = (n: number, word: string, color: string) => <Text color={n ? color : t.muted} {...(n ? { bold: true } : {})}>{n} {word}</Text>
108  const lensBar = Segmented(c, 'lens', lenses, ui.lens, v => {
109    c.acts.set({ lens: v, traceOffset: 0 })
110    c.acts.askTrace(v === 'trace' && run ? run.id : null, ui.zoom, 0)
111  })
112  // a run is open: one row of controls, so its summary card sits near the top.
113  // The run's name shows here only when the card below is about a part of it.
114  if (run) {
115    const inPart = !!ui.sel && ui.sel !== run.id
116    return (
117      <Box flexDirection="column" gap={1}>
118        <Box flexDirection="row" columnGap={2} rowGap={1} flexWrap="wrap" alignItems="center">
119          <Button key="back" plain label={`‹ ${ui.tab === 'live' ? 'Live' : 'History'}`} onPress={() => openRun(c, null)} />
120          {lensBar}
121          <Box flexGrow={1} flexShrink={1} minWidth={0} overflow="hidden">
122            {inPart ? <Button key="crumb" plain dimColor label={`in ${run.label}`} onPress={() => c.acts.set({ sel: null, file: null })} /> : null}
123          </Box>
124          {ExplainButton(c, run)}
125        </Box>
126        {ui.note ? <Text color={t.warn}>{ui.note}</Text> : null}
127        {ui.confirm === 'explain' ? ConfirmRow(c, 'explain', 'Write a new brief? It asks Sonnet again.', () => c.acts.explain(run.id)) : null}
128      </Box>
129    )
130  }
131  return (
132    <Box flexDirection="column" gap={1}>
133      {/* row 1: what you look at */}
134      <Box flexDirection="row" columnGap={2} rowGap={1} flexWrap="wrap" alignItems="center">
135        <Box flexDirection="row" gap={1} alignItems="center">
136          {t.art
137            ? <Svg source={spriteSvg(t.art, 'group', 20)} alt="Agents" width={20} height={20} />
138            : <Svg source={iconSvg('workflow', t.accent, 18)} alt="Agents" width={18} height={18} />}
139          <Text bold>Agents</Text>
140        </Box>
141        {Segmented(c, 'tab', [['live', `Live ${running}`, '1'], ['history', `History ${histRuns}`, '2']], ui.tab, v => {
142          c.acts.set({ tab: v, run: null, sel: null, file: null, view: 'overview', ...(ui.lens === 'trace' ? { lens: 'tree' as const } : {}) })
143          if (ui.lens === 'trace') c.acts.askTrace(null, ui.zoom, 0)
144        })}
145        {Segmented(c, 'scope', [['repo', 'This repo', 'r'], ['all', 'All repos']], ui.onlyRepo ? 'repo' : 'all', v => c.acts.set({ onlyRepo: v === 'repo' }))}
146      </Box>
147      {/* row 2: how you look at it */}
148      <Box flexDirection="row" columnGap={2} rowGap={1} flexWrap="wrap" alignItems="center">
149        {lensBar}
150        {ui.tab === 'history'
151          ? <Box flexGrow={1} minWidth={24}><Input key="search" placeholder="Search names and outcomes" value={ui.query} onInput={(v: string) => c.acts.set({ query: v })} onSubmit={(v: string) => c.acts.set({ query: v })} /></Box>
152          : null}
153      </Box>
154      {/* row 3: one quiet status line */}
155      <Box flexDirection="row" columnGap={1} flexWrap="wrap">
156        {tally(cnt.running, `${STATUS_GLYPH.running} running`, statusColor(t, 'running'))}<Text color={t.muted}>·</Text>
157        {tally(cnt.done, `${STATUS_GLYPH.done} done`, t.muted)}<Text color={t.muted}>·</Text>
158        {tally(cnt.failed + cnt.stopped, `${STATUS_GLYPH.failed} failed or stopped`, t.bad)}<Text color={t.muted}>·</Text>
159        <Text color={t.muted}>{ui.onlyRepo && c.data.repo ? shortHome(c.data.repo) : 'all repos'}</Text><Text color={t.muted}>·</Text>
160        <Text color={c.data.ai === 'off' ? t.muted : t.accent}>AI · {c.data.ai ?? 'cheap'}</Text>
161        <Text color={t.muted}>(change in /config)</Text>
162      </Box>
163      {ui.note ? <Text color={t.warn}>{ui.note}</Text> : null}
164    </Box>
165  )
166}
167
168const shortHome = (p: string) => p.replace(/^\/Users\/[^/]+/, '~')
169
170const isFull = (c: Ctx) => c.data.ai === 'full'
171
172// Explain this run: Sonnet, on Full only; with a brief there it asks first.
173function ExplainButton(c: Ctx, run: AgentNode) {
174  const { Button } = c.els
175  const writing = !!c.data.explaining?.includes(run.id)
176  const label = writing ? 'Writing the brief…' : run.explain ? 'Regenerate brief' : 'Explain this run'
177  return (
178    <Button key="explain" label={label} hotkey="e" {...(isFull(c) ? {} : { dimColor: true })} onPress={() => {
179      if (!isFull(c)) return c.acts.set({ note: 'Explain needs ai: full in /config. It asks Sonnet, on demand.' })
180      if (writing) return
181      if (run.explain) return c.acts.set({ confirm: 'explain', note: '', view: 'overview' })
182      c.acts.set({ confirm: '', note: '', view: 'overview' })
183      c.acts.explain(run.id)
184    }} />
185  )
186}
187
188// A small confirm row for a Sonnet job that would write over what is there.
189function ConfirmRow(c: Ctx, what: 'explain' | 'patterns', question: string, go: () => void) {
190  const { Box, Text, Button } = c.els
191  return (
192    <Box flexDirection="row" gap={2} alignItems="center">
193      <Text color={c.t.warn}>{question}</Text>
194      <Button key={`${what}:yes`} label="Yes, ask Sonnet" variant="primary" onPress={() => { c.acts.set({ confirm: '' }); go() }} />
195      <Button key={`${what}:no`} plain label="Cancel" onPress={() => c.acts.set({ confirm: '' })} />
196    </Box>
197  )
198}
199
200// ── the insights strip: what needs a look, each naming the item it is about ──
201function Insights(c: Ctx, run: AgentNode | undefined) {
202  const { Box, Text, Button, Svg } = c.els
203  const { t } = c
204  if (!run && c.ui.tab === 'history') return null
205  const scope = run ? scopeNodes(c.all, { kind: 'node', id: run.id }) : c.pool
206  const list = insights(scope, c.all, c.now)
207  if (!list.length) return null
208  const go = (it: (typeof list)[number]) => {
209    if (!it.target) return
210    if (run) c.acts.set({ sel: it.target, view: it.kind === 'overlap' ? 'changes' : 'overview' })
211    else {
212      const byId = new Map(c.all.map(n => [n.id, n]))
213      let top = byId.get(it.target)
214      while (top?.parentId && byId.has(top.parentId)) top = byId.get(top.parentId)
215      if (top) c.acts.set({ run: top.id, sel: it.target, view: it.kind === 'overlap' ? 'changes' : 'overview', file: null })
216    }
217  }
218  // one insight per line; warnings and failures in a box, plain notes as a quiet line under it
219  const line = (it: (typeof list)[number], i: number) => (
220    <Box key={`ins-${i}`} flexDirection="row" gap={1} alignItems="center">
221      <Svg source={iconSvg(it.tone === 'bad' ? 'failed' : it.kind === 'quiet' ? 'quiet' : it.tone === 'info' ? 'info' : 'warn', it.tone === 'bad' ? t.bad : it.tone === 'warn' ? t.warn : t.muted, 14)} alt={it.kind} width={14} height={14} />
222      <Box flexShrink={1}><Button key={`insight:${i}`} plain {...(it.tone === 'info' ? { dimColor: true } : {})} label={it.text} onPress={() => go(it)} /></Box>
223    </Box>
224  )
225  const loud = list.map((it, i) => [it, i] as const).filter(([it]) => it.tone !== 'info')
226  const quiet = list.map((it, i) => [it, i] as const).filter(([it]) => it.tone === 'info')
227  return (
228    <Box flexDirection="column" gap={1}>
229      {loud.length
230        ? (
231          <Box flexDirection="column" backgroundColor={tint(loud.some(([it]) => it.tone === 'bad') ? t.bad : t.warn)} paddingX={2} paddingY={1}>
232            <Text bold color={loud.some(([it]) => it.tone === 'bad') ? t.bad : t.warn}>Needs a look ({loud.length})</Text>
233            {loud.map(([it, i]) => line(it, i))}
234          </Box>
235        )
236        : null}
237      {quiet.length ? <Box flexDirection="column">{quiet.map(([it, i]) => line(it, i))}</Box> : null}
238    </Box>
239  )
240}
241
242// ── Live, no run open: one card per running run ──────────────────────────────
243function LiveList(c: Ctx) {
244  const { Box } = c.els
245  const items = topItems(c.data.nodes, 'all', false, c.now).filter((it): it is Extract<Item, { kind: 'node' }> => it.kind === 'node' && it.depth === 0)
246  if (c.ui.lens === 'board') return Board(c, boardLanes(undefined, c.data.nodes, items.map(i => i.node), 'all'), undefined)
247  if (c.ui.lens === 'timeline') return Timeline(c, undefined, items.map(i => i.node))
248  if (!items.length) {
249    return Empty(c.els, c.t, c.t.words.emptyLive, 'Subagents and workflows appear here while they run, then move to History.')
250  }
251  return <Box flexDirection="column" gap={1}>{items.map(it => RunCard(c, it.node, c.data.nodes))}</Box>
252}
253
254// A live run: its name in bold with its counts, then one row per agent grouped by
255// status (running, then failed or stopped, then done, which folds). No tinted box:
256// weight, glyphs and spacing carry the order.
257function RunCard(c: Ctx, n: AgentNode, nodes: AgentNode[]) {
258  const { Box, Text, Button } = c.els
259  const { t, ui } = c
260  const scope = scopeNodes(nodes, { kind: 'node', id: n.id })
261  const agents = scope.filter(k => k.kind === 'agent' && k.id !== n.id)
262  const files = fileRows(scope)
263  const ch = changeTotals(files)
264  const clash = n.kind === 'group' ? overlaps(agents) : []
265  const cn = counts(agents)
266  const sum = [cn.running ? `${cn.running} running` : '', cn.failed + cn.stopped ? `${cn.failed + cn.stopped} failed or stopped` : '', cn.done ? `${cn.done} done` : ''].filter(Boolean).join(' · ')
267  const open = (k: AgentNode) => c.acts.set({ run: n.id, sel: k.id, file: null })
268  const doneKey = `done:${n.id}`
269  const row = (k: AgentNode) => {
270    const step = k.status === 'running' ? (k.activity ?? k.lastTool ?? '') : (reportOf(k)?.result ?? '')
271    const quiet = isQuiet(k, c.now)
272    return (
273      <Box key={`lr-${k.id}`} flexDirection="row" gap={1} alignItems="center" paddingLeft={2} hover={{ backgroundColor: tint(t.accent, '14') }}>
274        {StatusMark(c.els, t, k.status, 14, quiet)}
275        <Box flexShrink={1} minWidth={10} overflow="hidden"><Button key={`lsel:${k.id}`} plain label={clip(k.label, 48)} onPress={() => open(k)} /></Box>
276        <Box flexGrow={1} flexShrink={1} minWidth={0} overflow="hidden">
277          {quiet
278            ? <Text color={t.warn} wrap="truncate-end">⚑ quiet {duration(c.now - (k.lastToolAt ?? k.startedAt))}</Text>
279            : <Text color={t.muted} wrap="truncate-end">{step ? `· ${step}` : ''}</Text>}
280        </Box>
281        <Box flexShrink={0}><Text color={t.muted}>{duration((k.endedAt ?? c.now) - k.startedAt)}{k.tokens ? ` · ${kTokens(k.tokens)}` : ''}</Text></Box>
282      </Box>
283    )
284  }
285  return (
286    <Box key={`card-${n.id}`} flexDirection="column" paddingBottom={1}>
287      <Box flexDirection="row" gap={1} alignItems="center" flexWrap="wrap">
288        {StatusMark(c.els, t, n.status)}
289        {KindMark(c.els, t, n.kind)}
290        <Button key={`run:${n.id}`} plain label={clip(n.label, 70)} onPress={() => openRun(c, n.id)} />
291        <Text color={t.muted}>{sum ? `· ${sum}` : ''}</Text>
292      </Box>
293      <Box paddingLeft={2}><Text color={t.muted}>{metaLine(n, c.now)}{files.length ? ` · ${files.length} file${files.length === 1 ? '' : 's'} +${num(ch.added)} −${num(ch.removed)}` : ''}</Text></Box>
294      {n.kind === 'agent' && !agents.length ? null : liveGroups(nodes, n.id).map(g => {
295        const isDone = g.status === 'done'
296        const isOpen = !isDone || ui.flipped.includes(doneKey)
297        return (
298          <Box key={`lg-${n.id}-${g.status}`} flexDirection="column" paddingTop={1}>
299            <Box flexDirection="row" gap={1} alignItems="center" paddingLeft={2}>
300              {isDone
301                ? <Button key={`fold:${doneKey}`} plain label={`${isOpen ? '▾' : '▸'} ${STATUS_GLYPH.done} DONE ${g.nodes.length}`} onPress={() => c.acts.set({ flipped: toggle(ui.flipped, doneKey) })} />
302                : <Text color={statusColor(t, g.status)} bold>{STATUS_GLYPH[g.status]} {STATUS_WORD[g.status].toUpperCase()} {g.nodes.length}</Text>}
303            </Box>
304            {isOpen ? g.nodes.map(row) : null}
305          </Box>
306        )
307      })}
308      {clash.map(o => <Text key={`clash-${o.path}`} color={t.warn}>⚠ {o.path.split('/').pop()} edited by {o.by.length} members ({o.by.map(b => b.label).join(', ')})</Text>)}
309    </Box>
310  )
311}
312
313// ── History, no run open: numbers, filters, runs by day ──────────────────────
314function HistoryPage(c: Ctx, history: AgentNode[]) {
315  const { Box, Text, Button, Svg } = c.els
316  const { t, ui } = c
317  if (ui.lens === 'board') return Board(c, boardLanes(undefined, history, history.filter(n => !n.parentId || !history.some(m => m.id === n.parentId)), 'all'), undefined)
318  if (ui.lens === 'timeline') return Timeline(c, undefined, history.filter(n => !n.parentId || !history.some(m => m.id === n.parentId)).slice(0, 30))
319  const stats = historyStats(history, c.now)
320  const items = historyItems(history, c.now, { filter: ui.hfilter, query: ui.query, olderOpen: ui.olderOpen })
321  const stat = (value: string, label: string) => (
322    <Box flexDirection="column">
323      <Text bold>{value}</Text>
324      <Text color={t.muted}>{label}</Text>
325    </Box>
326  )
327  return (
328    <Box flexDirection="column" gap={1}>
329      <Box flexDirection="row" gap={4} alignItems="flex-end" flexWrap="wrap">
330        {stat(String(stats.runs), 'runs')}
331        {stat(`${stats.okPct}%`, 'finished OK')}
332        {stat(kTokens(stats.tokens), 'tokens')}
333        <Svg source={sparkSvg(t, stats.perDay)} alt={`Runs per day for 7 days: ${stats.perDay.join(', ')}`} width={140} height={34} />
334        {c.data.ai !== 'off' || c.data.aiWeek ? stat(kTokens(c.data.aiWeek ?? 0), 'AI tokens this week') : null}
335      </Box>
336      <Box flexDirection="row" gap={2} alignItems="center" flexWrap="wrap">
337        {Segmented(c, 'hfilter', HISTORY_FILTERS.map(f => [f, HISTORY_FILTER_NAMES[f].replace(/^./, ch => ch.toUpperCase())] as [typeof f, string]), ui.hfilter, v => c.acts.set({ hfilter: v }))}
338        {ui.query ? <Button key="clear-search" plain label={`Clear “${clip(ui.query, 20)}”`} onPress={() => c.acts.set({ query: '' })} /> : null}
339      </Box>
340      {!ui.query && ui.hfilter === 'all' ? Patterns(c, c.data.patterns) : null}
341      {items.length === 0
342        ? Empty(c.els, t, t.words.emptyHistory, ui.query || ui.hfilter !== 'all' ? 'Nothing matches the search or filter.' : 'Finished runs land here.')
343        : (
344          <Box flexDirection="column">
345            {items.map((it, i) => {
346              if (it.kind === 'header') {
347                return (
348                  <Box key={`h-${i}`} flexDirection="row" gap={2} paddingTop={1}>
349                    <Text bold>{it.text}</Text>
350                    <Text color={t.muted}>{it.note ?? ''}</Text>
351                    {it.isOpen === false || (it.text === 'Older')
352                      ? <Button key="older" plain label={ui.olderOpen ? 'Hide' : 'Show'} onPress={() => c.acts.set({ olderOpen: !ui.olderOpen })} />
353                      : null}
354                  </Box>
355                )
356              }
357              if (it.kind !== 'node') return null
358              return HistoryRow(c, it.node, history)
359            })}
360          </Box>
361        )}
362    </Box>
363  )
364}
365
366// Patterns across runs: Sonnet's cards, each with its evidence, one thing to try, and its runs.
367function Patterns(c: Ctx, doc: PatternsDoc | undefined) {
368  const { Box, Text, Button, Svg } = c.els
369  const { t, ui } = c
370  if (!isFull(c) && !doc) return null
371  const busy = !!c.data.patternsBusy
372  const label = busy ? 'writing… (Sonnet)' : doc ? aiLabel(doc, c.now) : 'Sonnet looks for what repeats across your runs.'
373  const press = () => {
374    if (!isFull(c)) return c.acts.set({ note: 'Patterns need ai: full in /config. They ask Sonnet, on demand.' })
375    if (busy) return
376    if (doc) return c.acts.set({ confirm: 'patterns', note: '', patternsOpen: true })
377    c.acts.set({ confirm: '', note: '', patternsOpen: true })
378    c.acts.patterns()
379  }
380  return (
381    <Box flexDirection="column" gap={1} backgroundColor={tint(t.rule)} paddingX={2} paddingY={1}>
382      <Box flexDirection="row" gap={1} alignItems="center" flexWrap="wrap">
383        {doc ? <Button key="patterns:fold" plain label={ui.patternsOpen ? '▾' : '▸'} onPress={() => c.acts.set({ patternsOpen: !ui.patternsOpen })} /> : null}
384        <Text bold>Patterns across runs</Text>
385        <Box flexGrow={1}><Text color={t.muted}>{label}</Text></Box>
386        <Button key="patterns:go" label={busy ? 'Looking…' : doc ? 'Regenerate' : 'Find patterns'} hotkey="g" {...(isFull(c) ? {} : { dimColor: true })} onPress={press} />
387      </Box>
388      {ui.confirm === 'patterns' ? ConfirmRow(c, 'patterns', 'Look for patterns again? It asks Sonnet again.', () => c.acts.patterns()) : null}
389      {doc && ui.patternsOpen
390        ? doc.cards.map((card, i) => (
391          <Box key={`pat-${i}`} flexDirection="column" paddingLeft={1}>
392            <Box flexDirection="row" gap={1} alignItems="center">
393              <Svg source={iconSvg('warn', t.warn, 14)} alt="Pattern" width={14} height={14} />
394              <Text bold>{card.title}</Text>
395            </Box>
396            {card.evidence ? <Text color={t.muted}>{card.evidence}</Text> : null}
397            {card.try ? <Text><Text color={t.accent} bold>Try: </Text>{card.try}</Text> : null}
398            {card.runs.length
399              ? (
400                <Box flexDirection="row" gap={1} flexWrap="wrap">
401                  {card.runs.map(r => <Button key={`prun:${i}:${r.id}`} plain label={`↳ ${clip(r.label, 40)}`} onPress={() => openRun(c, r.id)} />)}
402                </Box>
403              )
404              : null}
405          </Box>
406        ))
407        : null}
408    </Box>
409  )
410}
411
412function HistoryRow(c: Ctx, n: AgentNode, history: AgentNode[]) {
413  const { Box, Text, Button } = c.els
414  const { t } = c
415  const files = fileRows(scopeNodes(history, { kind: 'node', id: n.id }))
416  const ch = changeTotals(files)
417  const tok = runTokens(history, n)
418  const outcome = outcomeOf(n) || noReportReason(n)
419  return (
420    <Box key={`hr-${n.id}`} flexDirection="row" gap={1} alignItems="center">
421      {StatusMark(c.els, t, n.status)}
422      <Box width={2}>{KindMark(c.els, t, n.kind, 14)}</Box>
423      <Box width={c.wide ? 34 : 24}><Button key={`run:${n.id}`} plain label={clip(n.label, c.wide ? 34 : 24)} onPress={() => openRun(c, n.id)} /></Box>
424      <Box flexGrow={1}><Text color={t.muted} wrap="truncate-end">{outcome}</Text></Box>
425      {c.wide ? <Box width={14}><Text color={files.length ? t.add : t.muted}>{files.length ? `+${num(ch.added)} −${num(ch.removed)}` : '—'}</Text></Box> : null}
426      <Box width={8}><Text color={t.muted}>{duration((n.endedAt ?? c.now) - n.startedAt)}</Text></Box>
427      {c.wide ? <Box width={7}><Text color={t.muted}>{tok ? kTokens(tok) : ''}</Text></Box> : null}
428    </Box>
429  )
430}
431
432// ── a run: the chosen lens beside (or above) the detail of what is picked ────
433function RunView(c: Ctx, run: AgentNode) {
434  const { Box } = c.els
435  const { ui } = c
436  const nodes = c.all
437  const target = targetOf(ui.sel, nodes) ?? { kind: 'node' as const, node: run }
438  // Only the tree sits beside the detail, and only when both get room. The pictures
439  // (timeline, trace, board) need the full width, so they always sit above it.
440  const side = c.wide && ui.lens === 'tree'
441  const treeCols = Math.max(52, Math.round(c.columns * 0.4))
442  const full = c.columns - 4
443  const lens = ui.lens === 'board'
444    ? Board(c, boardLanes(run, nodes, [], 'all'), run, full)
445    : ui.lens === 'timeline'
446      ? Timeline(c, run, [], full)
447      : ui.lens === 'trace'
448        ? Trace(c, run, full)
449        : Tree(c, run)
450  const detail = Detail(c, run, target)
451  // a run that is one agent has a one-row tree that only repeats the card's title
452  const lone = ui.lens === 'tree' && run.kind === 'agent' && !childrenOf(nodes, run.id).length
453  if (lone) return detail
454  return side
455    ? (
456      <Box flexDirection="row" gap={2}>
457        <Box flexDirection="column" width={treeCols} flexShrink={0} overflow="hidden">{lens}</Box>
458        <Box flexDirection="column" flexGrow={1} flexShrink={1} minWidth={40}>{detail}</Box>
459      </Box>
460    )
461    : <Box flexDirection="column" gap={2}>{lens}{detail}</Box>
462}
463
464type Target = { kind: 'node'; node: AgentNode } | { kind: 'phase'; wf: AgentNode; phase: string }
465
466function targetOf(sel: string | null, nodes: AgentNode[]): Target | undefined {
467  if (!sel) return undefined
468  if (sel.startsWith('phase:')) {
469    const [, wfId, ...rest] = sel.split(':')
470    const wf = nodes.find(n => n.id === wfId)
471    return wf ? { kind: 'phase', wf, phase: rest.join(':') } : undefined
472  }
473  const node = nodes.find(n => n.id === sel)
474  return node ? { kind: 'node', node } : undefined
475}
476
477const toggle = (list: string[], key: string) => (list.includes(key) ? list.filter(k => k !== key) : [...list, key])
478
479// ── Tree: workflow → phase → agent, cluster → members, subagents under parents ─
480function Tree(c: Ctx, run: AgentNode) {
481  const { Box, Text, Button, Svg } = c.els
482  const { t, ui } = c
483  const items = runTree(run, c.all, 'all', ui.flipped, ui.flipped)
484  // the picked row gets a clear tinted ground, and every row lights under the pointer,
485  // so rows read as pressable; its label never has to share space with a marker
486  const pickedBg = tint(t.accent, '40')
487  const hoverBg = { backgroundColor: tint(t.accent, '14') }
488  const byId = new Map(c.all.map(x => [x.id, x]))
489  // a sub-agent (spawned by an agent, not by the run) draws dim, one step down
490  const isSub = (n: AgentNode) => n.kind === 'agent' && !!n.parentId && byId.get(n.parentId)?.kind === 'agent' && n.parentId !== run.id
491  const INDENT = 3
492  // the right-hand facts sit in one block that never shrinks, so they line up and never spill
493  const facts = (parts: unknown[]) => <Box flexShrink={0} flexDirection="row" gap={1} alignItems="center">{parts}</Box>
494  const label = (key: string, text: string, onPress: () => void, dim = false) => (
495    <Box flexGrow={1} flexShrink={1} minWidth={10} overflow="hidden"><Button key={key} plain {...(dim ? { dimColor: true } : {})} label={text} onPress={onPress} /></Box>
496  )
497  const fold = (key: string, isOpen: boolean) => (
498    <Box width={2} flexShrink={0}><Button key={`fold:${key}`} plain label={isOpen ? '▾' : '▸'} onPress={() => c.acts.set({ flipped: toggle(ui.flipped, key) })} /></Box>
499  )
500  const noFold = <Box width={2} flexShrink={0} />
501  return (
502    <Box flexDirection="column" gap={0}>
503      {items.map((it, i) => {
504        if (it.kind === 'node') {
505          const n = it.node
506          const isSel = (ui.sel ?? run.id) === n.id
507          const files = n.kind === 'agent' ? fileRows([n]) : []
508          const ch = changeTotals(files)
509          const kids = n.kind === 'agent' ? [] : scopeNodes(c.all, { kind: 'node', id: n.id }).filter(k => k.kind === 'agent')
510          const r = rollup(kids)
511          return (
512            <Box key={`tn-${n.id}`} flexDirection="row" gap={1} alignItems="center" paddingLeft={it.depth * INDENT} {...(n.id === run.id ? { paddingBottom: 1 } : {})} hover={hoverBg} {...(isSel ? { backgroundColor: pickedBg } : {})}>
513              {it.fold ? fold(it.fold.key, it.fold.isOpen) : noFold}
514              {StatusMark(c.els, t, n.status, 16, isQuiet(n, c.now))}
515              {KindMark(c.els, t, n.kind)}
516              {n.id === run.id
517                // the run itself: bold, the top of the hierarchy (pressing the crumb or Esc returns to it)
518                ? <Box key={`rlabel:${n.id}`} flexGrow={1} flexShrink={1} minWidth={10} overflow="hidden"><Text bold wrap="truncate-end">{n.label}</Text></Box>
519                : label(`sel:${n.id}`, n.label, () => c.acts.set({ sel: n.id, file: null }), isSub(n))}
520              {facts([
521                kids.length ? <Svg key="bar" source={statusBarSvg(t, r, 48, 5)} alt={`${r.finished} of ${r.total}`} width={48} height={5} /> : null,
522                kids.length ? <Text key="n" color={t.muted}>{r.finished}/{r.total}</Text> : null,
523                files.length ? <Text key="d" color={t.add}>+{ch.added} <Text color={t.del}>−{ch.removed}</Text></Text> : null,
524                <Box key="ms" width={8} justifyContent="flex-end"><Text color={t.muted}>{duration((n.endedAt ?? c.now) - n.startedAt)}</Text></Box>,
525              ])}
526            </Box>
527          )
528        }
529        if (it.kind === 'phase') {
530          const key = `phase:${it.wfId}:${it.phase}`
531          const isSel = ui.sel === key
532          return (
533            <Box key={`tp-${it.key}`} flexDirection="row" gap={1} alignItems="center" paddingLeft={INDENT} {...(isSel ? { backgroundColor: pickedBg } : {})}>
534              {fold(it.key, it.isOpen)}
535              {label(`sel:${key}`, `${it.phase} phase`, () => c.acts.set({ sel: key, file: null }))}
536              {facts([
537                <Svg key="bar" source={statusBarSvg(t, it, 48, 5)} alt={`${it.done} of ${it.total}`} width={48} height={5} />,
538                <Box key="n" width={8} justifyContent="flex-end"><Text color={t.muted}>{it.total - it.running}/{it.total}</Text></Box>,
539              ])}
540            </Box>
541          )
542        }
543        if (it.kind === 'more') {
544          return <Box key={`tm-${i}`} paddingLeft={INDENT * 2 + 3}><Button key={`more:${it.key}`} plain label={`Show ${it.count} more finished`} onPress={() => c.acts.set({ flipped: toggle(ui.flipped, it.key) })} /></Box>
545        }
546        if (it.kind === 'info' && it.tone === 'warn') {
547          const o = overlaps(scopeNodes(c.all, { kind: 'node', id: it.nodeId }).filter(k => k.id !== it.nodeId))[0]
548          return o ? <Box key={`tw-${i}`} paddingLeft={INDENT * 2 + 3}><Text color={t.warn}>⚠ {o.by.length} members edited {o.path.split('/').pop()}</Text></Box> : null
549        }
550        if (it.kind === 'info' && it.tone === 'outcome') {
551          const n = c.all.find(x => x.id === it.nodeId)
552          // the outcome sits under the row it belongs to, indented past the marks
553          return n ? <Box key={`to-${i}`} paddingLeft={INDENT + 7} paddingBottom={1}><Text color={t.muted}>{clip(reportOf(n)?.result ?? '', 160)}</Text></Box> : null
554        }
555        return null
556      })}
557    </Box>
558  )
559}
560
561const isQuiet = (n: AgentNode, now: number) => n.status === 'running' && now - (n.lastToolAt ?? n.startedAt) >= 120_000
562
563// ── Board: one card per lane, its agents by status, full names and outcomes ────
564// Three fixed status columns squeezed every name into a third of the width, and
565// most of them stood empty. Now status is the order and the mark: running first,
566// then failed or stopped, then done.
567const BOARD_ORDER: Record<AgentNode['status'], number> = { running: 0, failed: 1, killed: 2, done: 3 }
568const BOARD_CAP = 12
569
570function Board(c: Ctx, lanes: Lane[], run: AgentNode | undefined, cols = c.columns - 4) {
571  const { Box, Text, Button } = c.els
572  const { t, ui } = c
573  if (!lanes.length) return Empty(c.els, t, 'Nothing to put on the board.', 'Agents show up here as cards, by status.')
574  const pick = (k: AgentNode) => {
575    if (run) return c.acts.set({ sel: k.id, file: null })
576    const byId = new Map(c.all.map(n => [n.id, n]))
577    let top: AgentNode | undefined = k
578    while (top?.parentId && byId.has(top.parentId)) top = byId.get(top.parentId)
579    if (top) c.acts.set({ run: top.id, sel: k.id, file: null })
580  }
581  const summary = (cards: AgentNode[]) => {
582    const cn = counts(cards)
583    return [cn.running ? `${cn.running} running` : '', cn.failed + cn.stopped ? `${cn.failed + cn.stopped} failed or stopped` : '', cn.done ? `${cn.done} done` : ''].filter(Boolean).join(' · ')
584  }
585  // agents as tiles, tinted by status: two to a row when each still gets 48 columns
586  const tileW = cols >= 100 ? Math.floor((cols - 1) / 2) : undefined
587  return (
588    <Box flexDirection="column" gap={1}>
589      {!run ? <Text color={t.muted}>Each section is one run. Press an agent to open its run.</Text> : null}
590      {lanes.map(l => {
591        const cards = [...l.cards].sort((a, b) => BOARD_ORDER[a.status] - BOARD_ORDER[b.status] || a.startedAt - b.startedAt)
592        const bad = cards.some(k => k.status === 'failed' || k.status === 'killed')
593        return (
594          <Box key={`lane-${l.key}`} flexDirection="column" gap={1}>
595            <Box flexDirection="column">
596              {Heading(c.els, l.title, `h-lane-${l.key}`)}
597              <Text color={bad ? t.bad : t.muted}>{summary(cards)}</Text>
598            </Box>
599            <Box flexDirection="row" flexWrap="wrap" gap={1}>
600              {cards.slice(0, BOARD_CAP).map(k => {
601                const outcome = k.status === 'running' ? (k.activity ?? '') : (reportOf(k)?.result ?? '')
602                const isSel = ui.sel === k.id
603                return (
604                  <Box key={`card-${k.id}`} flexDirection="column" backgroundColor={tint(isSel ? t.accent : statusColor(t, k.status), isSel ? '33' : '1a')} paddingX={1}
605                    {...(tileW ? { width: tileW } : { flexGrow: 1 })}>
606                    <Box flexDirection="row" gap={1} alignItems="center">
607                      {StatusMark(c.els, t, k.status, 14, isQuiet(k, c.now))}
608                      <Box flexGrow={1} flexShrink={1} minWidth={10} overflow="hidden"><Button key={`bsel:${k.id}`} plain label={k.label} onPress={() => pick(k)} /></Box>
609                      <Box flexShrink={0}><Text color={t.muted}>{duration((k.endedAt ?? c.now) - k.startedAt)}</Text></Box>
610                    </Box>
611                    {outcome ? <Box paddingLeft={3}><Text color={t.muted}>{clip(outcome, 120)}</Text></Box> : null}
612                  </Box>
613                )
614              })}
615            </Box>
616            {cards.length > BOARD_CAP ? <Text color={t.muted}>and {cards.length - BOARD_CAP} more</Text> : null}
617          </Box>
618        )
619      })}
620    </Box>
621  )
622}
623
624// ── Timeline: bars on a shared ruler ──────────────────────────────────────────
625function Timeline(c: Ctx, run: AgentNode | undefined, tops: AgentNode[], cols = c.columns - 4) {
626  const { Box, Text, Button, Svg } = c.els
627  const { t, ui } = c
628  // on the run list, each run opens into its agents (newest 8 runs), so the bars are not 4 thin lines
629  const list = run ? undefined : listTimelineRows(c.all, tops)
630  // inside a run, sub-agents sit under the agent that spawned them, and fold
631  const rows = run ? timelineRows(run, c.all, tops, 'all', ui.flipped) : list!.rows
632  // inside a run: the chain that set its end time, outlined, and the idle time, shaded
633  const agents = rows.flatMap(r => (r.kind === 'bar' ? [r.node] : []))
634  const path = run ? criticalPath(agents, c.now) : undefined
635  const idle = run ? idleGaps(agents, c.now) : { gaps: [], ms: 0 }
636  const onPath = new Set(path?.ids ?? [])
637  if (!agents.length) return Empty(c.els, t, 'No timeline yet.', 'Bars appear as agents start and finish.')
638  const from = Math.min(...agents.map(n => n.startedAt))
639  const to = Math.max(...agents.map(n => n.endedAt ?? c.now))
640  // labels are native text in their own column (they follow the theme and can be
641  // pressed); each bar is a strip picture as wide as the rest of the pane
642  const LABEL = Math.max(18, Math.min(44, Math.round(cols * 0.32)))
643  const w = Math.max(200, Math.round((cols - LABEL - 2) * CELL_PX))
644  const pick = (n: AgentNode) => {
645    if (run) return c.acts.set({ sel: n.id, file: null })
646    const byId = new Map(c.all.map(x => [x.id, x]))
647    let top: AgentNode | undefined = n
648    while (top?.parentId && byId.has(top.parentId)) top = byId.get(top.parentId)
649    if (top) c.acts.set({ run: top.id, sel: n.id, file: null })
650  }
651  // one quiet line of facts: how long it took and where the time went (no card, no tiles)
652  const span = to - from
653  const cn = counts(agents)
654  const failed = cn.failed + cn.stopped
655  const facts: Fact[] = run
656    ? [
657      { text: `took ${duration(span)}` },
658      ...(path && path.ids.length ? [{ text: `critical path ${duration(path.ms)} · ${path.ids.length} agent${path.ids.length === 1 ? '' : 's'}`, color: t.accent }] : []),
659      ...(idle.ms ? [{ text: `idle ${duration(idle.ms)}`, ...(idle.ms >= span * 0.2 ? { color: t.warn } : {}) }] : []),
660      { text: `${agents.length} agents` },
661    ]
662    : [
663      { text: `${list!.runs} run${list!.runs === 1 ? '' : 's'}${list!.hidden ? ` (${list!.hidden} older hidden)` : ''}` },
664      { text: `${agents.length} agents over ${duration(span)}` },
665      ...(failed ? [{ text: `${STATUS_GLYPH.failed} ${failed} failed or stopped`, color: t.bad }] : []),
666    ]
667  const key = [run && path ? 'Outlined bars: critical path' : '', run && idle.ms ? 'shaded: idle' : '', 'press a name to open it'].filter(Boolean).join(' · ')
668  return (
669    <Box flexDirection="column" gap={1}>
670      <Box key="facts-timeline"><Text color={t.muted}>{facts.map((f, i) => <Text key={`tf-${i}`} {...(f.color ? { color: f.color } : {})}>{i ? ' · ' : ''}{f.text}</Text>)}</Text></Box>
671      <Box flexDirection="row" columnGap={2} alignItems="center" flexWrap="wrap">
672        <Box flexGrow={1} flexShrink={1}><Text color={t.muted}>{key.replace(/^./, ch => ch.toUpperCase())}.</Text></Box>
673        {run ? <Button key="save-timeline" plain label="Save picture" hotkey="x" onPress={() => c.acts.exportPic(run.id, 'timeline', ui.zoom)} /> : null}
674      </Box>
675      <Box flexDirection="column" gap={0}>
676        <Box flexDirection="row" gap={1}>
677          <Box width={LABEL} flexShrink={0} />
678          <Svg source={rulerSvg(t, from, to, w)} alt={`Timeline of ${agents.length} agents over ${duration(to - from)}`} width={w} height={20} />
679        </Box>
680        {rows.map((r, i) => {
681          if (r.kind === 'label') {
682            // a run or phase starts a section, as in the report
683            return <Box key={`tlh-${i}`} paddingTop={i ? 1 : 0}>{Heading(c.els, r.text, `h-tl-${i}`)}</Box>
684          }
685          const n = r.node
686          const isSel = ui.sel === n.id
687          const bar: TimeBar = { label: n.label, start: n.startedAt, end: n.endedAt ?? c.now, status: n.status, isCritical: onPath.has(n.id) }
688          const depth = r.depth ?? 0
689          // a bar with sub-agents under it (shown, or folded away) gets a fold control
690          const next = rows[i + 1]
691          const hasKids = !!r.hidden || (next?.kind === 'bar' && (next.depth ?? 0) > depth)
692          const foldKey = `tl:${n.id}`
693          return (
694            <Box key={`tl-${n.id}`} flexDirection="row" gap={1} alignItems="center" hover={{ backgroundColor: tint(t.accent, '14') }} {...(isSel ? { backgroundColor: tint(t.accent, '40') } : {})}>
695              <Box width={LABEL} flexShrink={0} overflow="hidden" paddingLeft={1 + depth * 2} flexDirection="row">
696                {run
697                  ? <Box width={2} flexShrink={0}>{hasKids ? <Button key={`fold:${foldKey}`} plain label={ui.flipped.includes(foldKey) ? '▸' : '▾'} onPress={() => c.acts.set({ flipped: toggle(ui.flipped, foldKey) })} /> : null}</Box>
698                  : null}
699                <Box flexShrink={1} minWidth={0} overflow="hidden">
700                  <Button key={`tsel:${n.id}`} plain {...(depth > 0 || (run && !onPath.has(n.id)) ? { dimColor: true } : {})} label={r.hidden ? `${n.label} +${r.hidden}` : n.label} onPress={() => pick(n)} />
701                </Box>
702              </Box>
703              <Svg source={stripSvg(t, bar, from, to, w, idle.gaps)} alt={`${n.label}: ${STATUS_WORD[n.status]}, ${duration(bar.end - bar.start)}`} width={w} height={STRIP_H} />
704            </Box>
705          )
706        })}
707      </Box>
708    </Box>
709  )
710}
711
712// ── Trace: lanes on a time axis, arrows for spawns, messages, hand-backs ──────
713function Trace(c: Ctx, run: AgentNode, cols: number) {
714  const { Box, Text, Button, Svg } = c.els
715  const { t, ui } = c
716  const tr = c.data.trace
717  const zoomBar = Segmented(c, 'zoom', ZOOMS.map(z => [z, ZOOM_NAMES[z]] as [TraceZoom, string]), ui.zoom, z => {
718    c.acts.set({ zoom: z, traceOffset: 0 })
719    c.acts.askTrace(run.id, z, 0)
720  })
721  if (!tr || tr.run !== run.id) {
722    return (
723      <Box flexDirection="column" gap={1}>
724        {zoomBar}
725        <Text color={t.muted}>Reading the transcripts…</Text>
726        <Button key="read-trace" plain label="Read the trail now" onPress={() => c.acts.askTrace(run.id, ui.zoom, 0)} />
727      </Box>
728    )
729  }
730  const lanes = tr.lanes.map(l => ({ label: l.label, chip: l.chip, status: l.status, ...(l.depth ? { depth: l.depth } : {}) }))
731  const timed = tr.rows.filter(r => r.at > 0)
732  const from = timed.length ? Math.min(...timed.map(r => r.at)) : c.now
733  const to = timed.length ? Math.max(...timed.map(r => r.end ?? r.at)) : c.now
734  const w = Math.max(320, Math.round(cols * CELL_PX))
735  const marks = tr.rows.map(r => ({ lane: r.lane, ...(r.to !== undefined ? { to: r.to } : {}), at: r.at || from, kind: r.kind, text: r.text }))
736  // the agent picked in the tree or the timeline: its lane stands out, the others fade
737  const focus = ui.sel ? tr.lanes.findIndex(l => l.id === ui.sel) : -1
738  const svgH = 24 + lanes.length * 40 + 8
739  return (
740    <Box flexDirection="column" gap={1}>
741      <Box flexDirection="row" gap={2} alignItems="center">
742        {zoomBar}
743        <Text color={t.muted}>{tr.lanes.length} lanes · {tr.total} events{tr.missing ? ` · ${tr.missing} transcript${tr.missing === 1 ? '' : 's'} no longer on disk` : ''}{tr.loading ? ' · reading…' : ''}</Text>
744        {ui.zoom === 'story' && tr.storyBy ? <Text color={t.accent}>Story · {tr.storyBy}</Text> : null}
745        <Button key="save-trace" plain label="Save picture" hotkey="x" onPress={() => c.acts.exportPic(run.id, 'trace', ui.zoom, ui.sel ?? undefined)} />
746      </Box>
747      <Svg source={traceSvg(t, lanes, marks, from, to, w, focus >= 0 ? focus : undefined)} alt={`Trace of ${tr.lanes.length} agents`} width={w} height={svgH} />
748      <Box flexDirection="column">
749        {tr.rows.map((r, i) => (
750          <Box key={`tr-${tr.offset + i}`} flexDirection="row" gap={1}>
751            <Box width={8}><Text color={t.muted}>{r.at ? clock(r.at) : ''}</Text></Box>
752            {Chip(c.els, t, tr.lanes[r.lane]?.chip ?? '··', t.lanes[r.lane % t.lanes.length])}
753            <Box flexGrow={1}><Text {...(r.kind === 'fail' ? { color: t.bad } : r.kind === 'quiet' ? { color: t.muted } : {})} wrap="truncate-end">{r.kind === 'spawn' ? '↳ ' : r.kind === 'handback' ? '↩ ' : r.kind === 'message' ? '✉ ' : ''}{r.text}</Text></Box>
754            {r.kind === 'edit' && r.path
755              ? <Button key={`trdiff:${tr.offset + i}`} plain label="diff" onPress={() => { c.acts.set({ view: 'changes', file: r.path! }); c.acts.openDiff(r.path!) }} />
756              : null}
757          </Box>
758        ))}
759      </Box>
760      {tr.total > tr.rows.length
761        ? (
762          <Box flexDirection="row" gap={2}>
763            {tr.offset > 0 ? <Button key="trace-prev" plain label="‹ Earlier" onPress={() => { const o = Math.max(0, tr.offset - tr.rows.length); c.acts.set({ traceOffset: o }); c.acts.askTrace(run.id, ui.zoom, o) }} /> : null}
764            <Text color={t.muted}>{tr.offset + 1}–{tr.offset + tr.rows.length} of {tr.total}</Text>
765            {tr.offset + tr.rows.length < tr.total ? <Button key="trace-next" plain label="Later ›" onPress={() => { const o = tr.offset + tr.rows.length; c.acts.set({ traceOffset: o }); c.acts.askTrace(run.id, ui.zoom, o) }} /> : null}
766          </Box>
767        )
768        : null}
769    </Box>
770  )
771}
772
773// ── the detail of what is picked: header, then Overview, Changes or Output ───
774function Detail(c: Ctx, run: AgentNode, target: Target) {
775  const { Box, Text, Svg, Markdown, Button } = c.els
776  const { t, ui } = c
777  const scope = target.kind === 'node'
778    ? scopeNodes(c.all, { kind: 'node', id: target.node.id })
779    : scopeNodes(c.all, { kind: 'phase', wfId: target.wf.id, phase: target.phase })
780  const files = fileRows(scope)
781  const names = shortPaths(files.map(f => f.path))
782  const head = target.kind === 'node' ? target.node : undefined
783  const title = head ? head.label : `${target.kind === 'phase' ? target.phase : ''} phase`
784  const status = head ? head.status : (() => {
785    const cn = counts(scope)
786    return cn.running ? 'running' as const : cn.failed ? 'failed' as const : cn.stopped ? 'killed' as const : 'done' as const
787  })()
788  const quiet = head ? isQuiet(head, c.now) : false
789  const big = t.art
790    ? status === 'running' && !quiet
791      ? <Svg source={spriteSvg(t.art, walkSlot(c.now), 48)} alt="Running" width={48} height={48} />
792      : <Svg source={spriteSvg(t.art, quiet ? 'quiet' : head?.kind === 'workflow' ? 'workflow' : head?.kind === 'group' ? 'group' : status === 'done' ? 'done' : status === 'failed' ? 'failed' : 'stopped', 48)} alt={STATUS_WORD[status]} width={48} height={48} />
793    : <Svg source={iconSvg(quiet ? 'quiet' : status, quiet ? t.warn : statusColor(t, status), 28)} alt={STATUS_WORD[status]} width={28} height={28} />
794  const meta = head
795    ? [prettyType(head, !!head.phase), prettyModel(head.model), duration((head.endedAt ?? c.now) - head.startedAt), clock(head.startedAt)].filter(Boolean).join(' · ')
796    : `${scope.length} agents`
797  const tabs = Segmented(c, 'view', [['overview', 'Overview', 'o'], ['changes', `Changes ${files.length}`, 'c'], ['output', 'Output', 'u']], ui.view, v => {
798    c.acts.set({ view: v, file: null })
799    if (ui.file) c.acts.openDiff(null)
800  })
801  // the parts of a run: a workflow's phases, or a cluster's members
802  const parts: Part[] = head?.kind === 'workflow'
803    ? pipeline(head, c.all).map(p => ({
804      id: `phase:${head.id}:${p.phase}`, label: p.phase,
805      status: p.running ? 'running' as const : p.failed ? 'failed' as const : p.stopped ? 'killed' as const : 'done' as const,
806      result: head.partReports?.[p.phase]?.result ?? `${p.total - p.running} of ${p.total} agents finished`,
807      meta: `${p.total} agent${p.total === 1 ? '' : 's'}`,
808    }))
809    : head?.kind === 'group'
810      ? childrenOf(c.all, head.id).map(k => ({ id: k.id, label: k.label, status: k.status, result: reportOf(k)?.result ?? noReportReason(k) }))
811      : []
812  let body
813  if (ui.view === 'changes') body = Changes(c, scope, files, names)
814  else if (ui.view === 'output') {
815    const md = target.kind === 'node'
816      ? outputMarkdown(target.node, childrenOf(c.all, target.node.id))
817      : [`### ${target.phase} phase`, target.wf.partReports?.[target.phase]?.result ?? '', ...scope.map(k => `- **${k.label}** — ${reportOf(k)?.result ?? noReportReason(k)}`)].filter(Boolean).join('\n\n')
818    const brief = target.kind === 'node' && target.node.id === run.id && (run.explain || c.data.explaining?.includes(run.id))
819      ? `${briefMarkdown(run.explain, !!c.data.explaining?.includes(run.id), c.now)}\n\n---\n\n`
820      : ''
821    body = <Markdown key="output" text={brief + md} />
822  } else if (head) {
823    const prs = Object.values(head.partReports ?? {}).filter(p => p.model)
824    const partsBy = prs.length ? aiLabel({ model: prs[0]!.model, tokens: prs.reduce((a, p) => a + (p.tokens ?? 0), 0), at: Math.max(...prs.map(p => p.at ?? 0)) || undefined }, c.now) : ''
825    const writing = !!c.data.explaining?.includes(head.id)
826    const showBrief = head.id === run.id && (head.explain || writing)
827    body = (
828      <Box flexDirection="column" gap={1}>
829        {showBrief ? BriefBlock(c.els, t, head.explain, writing, c.now) : null}
830        {ReportBlock(c.els, t, head, c.all, c.now, parts, id => c.acts.set({ sel: id, file: null }), partsBy)}
831      </Box>
832    )
833  } else {
834    const pr = target.kind === 'phase' ? target.wf.partReports?.[target.phase] : undefined
835    body = (
836      <Box flexDirection="column" gap={1}>
837        {pr?.problems?.length
838          ? (
839            <Box key="attention" flexDirection="column">
840              <Box flexDirection="row" gap={1} alignItems="center">
841                <Svg source={iconSvg('warn', t.bad, 16)} alt="Needs your attention" width={16} height={16} />
842                <Text color={t.bad} bold>Needs your attention ({pr.problems.length})</Text>
843              </Box>
844              <Markdown key="pproblems" text={pr.problems.map(p => `- ${mdText(p.text)}`).join('\n')} />
845            </Box>
846          )
847          : null}
848        {Heading(c.els, `Agents (${scope.length})`, 'h-agents')}
849        {scope.map(k => (
850          <Box key={`pa-${k.id}`} flexDirection="column">
851            <Box flexDirection="row" gap={1} alignItems="center">
852              {StatusMark(c.els, t, k.status, 14)}
853              <Box flexGrow={1} flexShrink={1} overflow="hidden"><Button key={`psel:${k.id}`} plain label={k.label} onPress={() => c.acts.set({ sel: k.id })} /></Box>
854              <Box flexShrink={0}><Text color={t.muted}>{duration((k.endedAt ?? c.now) - k.startedAt)}</Text></Box>
855            </Box>
856            <Box paddingLeft={3}><Text color={t.muted}>{clip(reportOf(k)?.result ?? noReportReason(k), 200)}</Text></Box>
857          </Box>
858        ))}
859        {pr?.model ? <Text color={t.muted}>Part report by {aiLabel(pr, c.now)}</Text> : null}
860      </Box>
861    )
862  }
863  // the card: status, verdict and numbers in one glance; every view below shares it
864  const factScope = target.kind === 'node' ? { kind: 'node' as const, id: target.node.id } : { kind: 'phase' as const, wfId: target.wf.id, phase: target.phase }
865  const facts = reportFacts(c.all, factScope, c.now)
866  // a live agent has no verdict yet: it shows what it is doing now instead
867  const live = !!head && head.status === 'running' && !reportOf(head)
868  const result = head
869    ? live ? undefined : reportOf(head)?.result ?? noReportReason(head)
870    : target.kind === 'phase' ? target.wf.partReports?.[target.phase]?.result ?? `${counts(scope).done} of ${scope.length} agents done.` : ''
871  const nowText = live && head
872    ? [head.activity ?? head.lastTool ?? 'Starting', `${head.tools} tool call${head.tools === 1 ? '' : 's'}`, head.lastToolAt ? `last ${duration(c.now - head.lastToolAt)} ago` : ''].filter(Boolean).join(' · ')
873    : undefined
874  const problems = head ? (reportOf(head)?.problems?.length ?? 0) : target.kind === 'phase' ? (target.wf.partReports?.[target.phase]?.problems?.length ?? 0) : 0
875  const color = quiet ? t.warn : statusColor(t, status)
876  return (
877    <Box flexDirection="column" gap={1}>
878      {PlainHeader(c.els, t, { id: 'detail', big, status, statusWord: quiet ? 'Quiet' : STATUS_WORD[status], color, title, meta, ...(result ? { result } : {}), ...(nowText ? { now: nowText } : {}), facts: factsOf(t, facts, problems) })}
879      {quiet && head ? <Text color={t.warn}>No tool call for {duration(c.now - (head.lastToolAt ?? head.startedAt))}. Last: {head.activity ?? head.lastTool ?? 'unknown'}.</Text> : null}
880      {tabs}
881      {body}
882    </Box>
883  )
884}
885
886function Changes(c: Ctx, scope: AgentNode[], files: ReturnType<typeof fileRows>, names: Map<string, string>) {
887  const { Box, Text, Button, Svg, Code } = c.els
888  const { t, ui } = c
889  if (!files.length) return <Text color={t.muted}>No files were changed here.</Text>
890  if (ui.file) {
891    const row = files.find(f => f.path === ui.file)
892    const ids = new Set(scope.map(n => n.id))
893    const edits: EditRecord[] = c.data.diff?.path === ui.file ? c.data.diff.edits.filter(r => ids.has(r.agentId)) : []
894    const byId = new Map(c.all.map(n => [n.id, n]))
895    return (
896      <Box flexDirection="column" gap={1}>
897        <Box flexDirection="row" gap={2} alignItems="center">
898          <Button key="files" plain label="‹ All files" onPress={() => { c.acts.set({ file: null }); c.acts.openDiff(null) }} />
899          <Text bold>{names.get(ui.file) ?? ui.file}</Text>
900          {row ? <Text color={t.add}>+{num(row.added)} <Text color={t.del}>−{num(row.removed)}</Text></Text> : null}
901        </Box>
902        {c.data.diff?.path !== ui.file
903          ? <Text color={t.muted}>Loading the diff…</Text>
904          : edits.length === 0
905            ? <Text color={t.muted}>No saved edits for this file in this scope.</Text>
906            : edits.map(rec => {
907              const lines = lineDiff(rec.old, rec.new, rec.line)
908              const hunks = unifiedHunks(lines)
909              const who = byId.get(rec.agentId)
910              const added = lines.filter(l => l.op === '+').length
911              const removed = lines.filter(l => l.op === '-').length
912              return (
913                <Box key={`edit-${rec.id}`} flexDirection="column">
914                  <Box flexDirection="row" gap={1} alignItems="center">
915                    {Chip(c.els, t, who ? clip(who.label, 30) : rec.agentId.slice(0, 8), t.accent)}
916                    <Text color={t.muted}>line {rec.line} · {clock(rec.at)}</Text>
917                    <Text color={t.add}>+{added} <Text color={t.del}>−{removed}</Text></Text>
918                  </Box>
919                  {hunks.map((hunk, i) => <Code key={`hunk-${rec.id}-${i}`} source={hunk} format="diff" path={rec.path} wrap="wrap" />)}
920                </Box>
921              )
922            })}
923      </Box>
924    )
925  }
926  const max = Math.max(1, ...files.map(f => f.added + f.removed))
927  return (
928    <Box flexDirection="column">
929      {files.map(f => (
930        <Box key={`file-${f.path}`} flexDirection="row" gap={1} alignItems="center">
931          <Svg source={iconSvg('file', t.muted, 14)} alt="File" width={14} height={14} />
932          <Box flexGrow={1}><Button key={`file:${f.path}`} plain label={clip(names.get(f.path) ?? f.path, 50)} onPress={() => { c.acts.set({ file: f.path }); c.acts.openDiff(f.path) }} /></Box>
933          <Svg source={diffBarSvg(t, f.added, f.removed, max)} alt={`+${f.added} −${f.removed}`} width={60} height={6} />
934          <Box width={14}><Text color={t.add}>+{num(f.added)} <Text color={t.del}>−{num(f.removed)}</Text></Text></Box>
935          <Text color={t.muted}>{clip(f.by.map(b => b.node.label).join(', '), 30)}</Text>
936        </Box>
937      ))}
938    </Box>
939  )
940}
941
hooks/desktop/state.ts 36 lines
1import type { DeskUi } from '../../types'
2
3// The desktop view's own state: which tab, run, item and view are open, and how the
4// lists are filtered. It lives in $.state (key "desk"), written by Button presses.
5export const DESK_DEFAULT: DeskUi = {
6  tab: 'live', run: null, sel: null, view: 'overview', lens: 'tree', onlyRepo: true, file: null,
7  query: '', hfilter: 'all', olderOpen: false, flipped: [], zoom: 'story', traceOffset: 0,
8  confirm: '', note: '', patternsOpen: true,
9}
10
11const oneOf = <T extends string>(x: unknown, all: readonly T[], d: T): T => (all.includes(x as T) ? (x as T) : d)
12const str = (x: unknown) => (typeof x === 'string' ? x : null)
13
14// State from an older shape, or none, read with every field checked and defaulted.
15export function deskUi(raw: unknown): DeskUi {
16  const s = (raw ?? {}) as Partial<Record<keyof DeskUi, unknown>>
17  return {
18    tab: oneOf(s.tab, ['live', 'history'] as const, 'live'),
19    run: str(s.run),
20    sel: str(s.sel),
21    view: oneOf(s.view, ['overview', 'changes', 'output'] as const, 'overview'),
22    lens: oneOf(s.lens, ['tree', 'board', 'timeline', 'trace'] as const, 'tree'),
23    onlyRepo: s.onlyRepo !== false,
24    file: str(s.file),
25    query: typeof s.query === 'string' ? s.query : '',
26    hfilter: oneOf(s.hfilter, ['all', 'failed', 'changed'] as const, 'all'),
27    olderOpen: s.olderOpen === true,
28    flipped: Array.isArray(s.flipped) ? s.flipped.filter((x): x is string => typeof x === 'string') : [],
29    zoom: oneOf(s.zoom, ['story', 'steps', 'raw'] as const, 'story'),
30    traceOffset: typeof s.traceOffset === 'number' && Number.isFinite(s.traceOffset) ? Math.max(0, Math.floor(s.traceOffset)) : 0,
31    confirm: oneOf(s.confirm, ['', 'explain', 'patterns'] as const, ''),
32    note: typeof s.note === 'string' ? s.note : '',
33    patternsOpen: s.patternsOpen !== false,
34  }
35}
36
hooks/view.tsx 2059 lines
1import type { ClientModule, ClientSurface, JsonValue } from 'claude-code'
2
3import type { Act, AgentNode, Brief, EditRecord, PatternsDoc, TraceRow, TraceView, TraceZoom, ViewProps, Wheel } from '../types'
4import {
5  COLUMNS, LENSES, LENS_NAMES, aspects, boardLanes, columnOf, criticalPath, idleGaps, insights, lensesFor, modelFamily, rowFlags, spendByModel,
6  timelineRows, tokensUnder, type Column, type Flag, type Insight, type Lane, type Lens, type TimeRow,
7} from './lens'
8import { compareRuns, previousOf, verdict, type Metric } from './compare'
9import {
10  GROUPS, GROUP_NAMES, childrenOf, counts, dayLabel, diffCounts, fileRows, firstSentence, isSelectable, lineDiff,
11  noReportReason, overlaps, phaseWords, pipeline, plain, prettyModel, prettyType, readableResult, reportHeading, runTree, scopeNodes, shortPaths,
12  taskText, topItems, whereLabel, workSummary, type DiffLine, type FileRow, type Filter, type Group, type Item,
13  folderKey, joinNodes, runKey,
14} from './list'
15import { cellWidth, fit, kindGlyph, padEnd, padStart, themeNameOf, themeOf, type Theme } from './theme'
16import {
17  HISTORY_FILTERS, HISTORY_FILTER_NAMES, historyItems, historyStats, outcomeOf, runTokens, sparkline, type HistoryFilter,
18} from './history'
19import { kTokens, reportFacts, reportOf, type Facts } from './report'
20import { ZOOMS, ZOOM_NAMES } from './trace'
21import { ago } from './ai'
22
23type Tab = 'live' | 'history'
24type ViewName = 'agents' | 'changes' | 'output'
25type State = {
26  tab: Tab
27  // the run opened (a workflow, a cluster or a top-level subagent), or null for the run list
28  path: string | null
29  view: ViewName
30  // how the agents are drawn: their tree, a board by status, or a timeline
31  lens: Lens
32  sel: number
33  first: number
34  // the agents view's selection, kept while Changes or Output show its scope
35  agentSel: number
36  // what that selection was (a node id, or phase:<workflow>:<phase>), so any lens finds it again
37  focus: string | null
38  // the file whose diff the Changes view shows, or null for its file list
39  diffFile: string | null
40  filter: Filter
41  group: Group
42  flipped: string[]
43  showDone: string[]
44  tick: number
45  // The engine time last handed in, and the tick it arrived on: now = that + ticks since.
46  atSeen: number
47  tickAtSeen: number
48  // History shows only this repository's runs
49  onlyRepo: boolean
50  // the key overlay
51  help: boolean
52  // the last wheel move applied; -1 until the first props arrive
53  wheelSeen: number
54  // the insight `i` last jumped to; -1 before the first
55  insight: number
56  // History: which runs the page keeps, the search words, whether typing goes to
57  // the search line, and whether runs older than a week show
58  hfilter: HistoryFilter
59  query: string
60  searching: boolean
61  olderOpen: boolean
62  // the trace: how close it reads, what was last asked of the hooks and when,
63  // and the row to come back to after a diff
64  zoom: TraceZoom
65  traceAsk: string
66  traceAskTick: number
67  traceAt: number
68  // a short line in the footer (how to turn AI on, "press e again"), and the tick it was set
69  note: string
70  noteTick: number
71  // a second press within a few ticks writes the brief or the patterns again
72  confirm: '' | 'explain' | 'patterns'
73  confirmTick: number
74  // History: whether the patterns across runs show
75  patternsOpen: boolean
76  // Where the keys go, as on a remote: the content, or one of the two bars above it
77  // (the caption's views and lenses, the Live and History tabs). Arrows switch tabs
78  // only in a bar; ↑ on the first row goes up to it, ↓ comes back. `barAt` is the
79  // item the bar's cursor is on.
80  zone: Zone
81  barAt: number
82  // the agent picked in another lens, whose lane the trace opens on and marks;
83  // `traceJump` until the trace has come and the jump is made
84  traceFocus: string | null
85  traceJump: boolean
86  // the trace cut to one lane (its agent id), and the words searched in it
87  traceLane: string | null
88  tquery: string
89  // a run marked to compare with the next one m is pressed on; two runs side by side
90  mark: string | null
91  compare: [string, string] | null
92  // the last picture note shown
93  exportSeen: number
94}
95type Zone = 'content' | 'caption' | 'tabs'
96
97const TICK_MS = 500
98// every key the pane takes, for ? help
99const KEYS_HELP: [string, string][] = [
100  ['j k  ↑ ↓', 'move, or scroll the text'], ['↑ on the top row', 'up to the bar: views and lenses, then Live · History'],
101  ['in a bar  ← →', 'switch; ↓ or enter goes back down to the list'], ['PgUp PgDn', 'a page at a time'], ['g G', 'first, last'], ['enter', 'open'],
102  ['space  ← →', 'fold or unfold in the tree; ← goes up to the parent'], ['v', 'view: tree, board, timeline; in a run, trace'],
103  ['1 2  a c o', 'straight to live, history; agents, changes, output'], ['b  ⌫', 'back'],
104  ['i', 'next thing that needs a look'], ['f', 'filter: all, running, failed · history: all, failed, changed files'], ['s', 'group the run list'],
105  ['/', 'search history: names and outcomes; in a trace, its rows; enter keeps, ctrl+u clears'], ['o', 'show or hide history older than a week'],
106  ['r', 'this repo · all repos (history)'],
107  ['m', 'mark a run; m on a second run compares the two'], ['=', 'compare a run with its last run of the same work'],
108  ['trace  n p', 'next, previous failure or quiet gap; with a search, its matches'], ['trace  f', 'only the lane of the row you are on; f again for all'],
109  ['z', 'trace: story, steps, raw'], ['n p', 'next, previous file in a diff'],
110  ['x', 'save the run\'s timeline or trace as a picture (SVG, and PNG with rsvg-convert)'],
111  ['e', 'explain this run: a brief from Sonnet (ai: full); twice to write it again'],
112  ['g', 'history: patterns across runs from Sonnet (ai: full); twice to look again'],
113  ['p', 'history: show or hide the patterns'],
114  ['wheel', 'move, or scroll'], ['?', 'close this help'],
115]
116// its rows: a blank row, then the list
117const KEYS_HELP_COUNT = KEYS_HELP.length + 1
118const MIN_COLUMNS = 60
119const CARDS_PER_CELL = 4
120const DEFAULT_STATE: State = {
121  tab: 'live', path: null, view: 'agents', lens: 'tree', sel: 0, first: 0, agentSel: 0, focus: null, diffFile: null,
122  filter: 'all', group: 'none', flipped: [], showDone: [], tick: 0, atSeen: 0, tickAtSeen: 0, onlyRepo: true, help: false,
123  wheelSeen: -1, insight: -1, hfilter: 'all', query: '', searching: false, olderOpen: false,
124  zoom: 'story', traceAsk: '', traceAskTick: -100, traceAt: 0,
125  note: '', noteTick: -100, confirm: '', confirmTick: -100, patternsOpen: true,
126  zone: 'content', barAt: 0, traceFocus: null, traceJump: false, traceLane: null, tquery: '', mark: null, compare: null, exportSeen: 0,
127}
128const FILTERS: Filter[] = ['all', 'running', 'failed']
129// a note shows for 8 ticks (4 s); a confirm waits 6 ticks (3 s) for the second press
130const NOTE_TICKS = 8
131const CONFIRM_TICKS = 6
132const PATTERNS_TITLE = 'Patterns across runs'
133const VIEWS: ViewName[] = ['agents', 'changes', 'output']
134
135const arrayOf = <T,>(x: unknown): T[] => (Array.isArray(x) ? (x as T[]) : [])
136
137// Props and local state come from outside this module (the hooks, a previous
138// version of this view), so each field is checked and defaulted, never assumed.
139export function viewProps(raw: unknown): ViewProps {
140  const p = (raw ?? {}) as Partial<ViewProps>
141  const diff = p.diff && typeof p.diff.path === 'string' ? { path: p.diff.path, edits: arrayOf<EditRecord>(p.diff.edits) } : undefined
142  const w = p.wheel as Partial<Wheel> | undefined
143  return {
144    nodes: arrayOf(p.nodes), history: arrayOf(p.history), at: typeof p.at === 'number' ? p.at : 0, diff,
145    ...(typeof p.repo === 'string' ? { repo: p.repo } : {}),
146    theme: themeNameOf(p.theme),
147    wheel: { seq: typeof w?.seq === 'number' ? w.seq : 0, by: typeof w?.by === 'number' ? w.by : 0 },
148    ...(traceOf(p.trace) ? { trace: traceOf(p.trace) } : {}),
149    ai: p.ai === 'off' || p.ai === 'full' ? p.ai : 'cheap',
150    aiWeek: typeof p.aiWeek === 'number' ? p.aiWeek : 0,
151    explaining: arrayOf<string>(p.explaining).filter(x => typeof x === 'string'),
152    patternsBusy: p.patternsBusy === true,
153    ...(patternsOf(p.patterns) ? { patterns: patternsOf(p.patterns) } : {}),
154    ...(p.exported && typeof p.exported.seq === 'number' && typeof p.exported.text === 'string' ? { exported: { seq: p.exported.seq, text: p.exported.text } } : {}),
155  }
156}
157
158// Patterns from the hooks, when they have the shape the view draws.
159const patternsOf = (d: unknown): PatternsDoc | undefined => {
160  const x = d as Partial<PatternsDoc> | undefined
161  if (!x || !Array.isArray(x.cards) || typeof x.at !== 'number') return undefined
162  const cards = x.cards.filter(c => c && typeof c.title === 'string').map(c => ({ ...c, runs: arrayOf<{ id: string; label: string }>(c.runs) }))
163  return { cards, model: typeof x.model === 'string' ? x.model : 'Sonnet', at: x.at, ...(typeof x.tokens === 'number' ? { tokens: x.tokens } : {}) }
164}
165
166// A trace from the hooks, when it has the shape the view draws.
167const traceOf = (t: unknown): TraceView | undefined => {
168  const x = t as Partial<TraceView> | undefined
169  if (!x || typeof x.run !== 'string' || !Array.isArray(x.rows) || !Array.isArray(x.lanes)) return undefined
170  return { run: x.run, zoom: ZOOMS.includes(x.zoom as TraceZoom) ? (x.zoom as TraceZoom) : 'story', lanes: x.lanes, rows: x.rows as TraceRow[],
171    total: typeof x.total === 'number' ? x.total : x.rows.length, offset: typeof x.offset === 'number' ? x.offset : 0, missing: typeof x.missing === 'number' ? x.missing : 0,
172    ...(typeof x.storyBy === 'string' ? { storyBy: x.storyBy } : {}),
173    ...(typeof x.lane === 'string' ? { lane: x.lane } : {}),
174    marks: arrayOf<number>(x.marks).filter(n => typeof n === 'number'),
175    ...(typeof x.query === 'string' ? { query: x.query, hits: arrayOf<number>(x.hits).filter(n => typeof n === 'number') } : {}) }
176}
177
178export function viewState(raw: unknown): State {
179  const s = { ...DEFAULT_STATE, ...((raw ?? {}) as Partial<State>) }
180  const num = (x: unknown) => (typeof x === 'number' && Number.isFinite(x) ? x : 0)
181  return {
182    ...s,
183    tab: s.tab === 'history' ? 'history' : 'live',
184    path: typeof s.path === 'string' ? s.path : null,
185    view: VIEWS.includes(s.view) ? s.view : 'agents',
186    lens: LENSES.includes(s.lens) ? s.lens : 'tree',
187    focus: typeof s.focus === 'string' ? s.focus : null,
188    diffFile: typeof s.diffFile === 'string' ? s.diffFile : null,
189    filter: FILTERS.includes(s.filter) ? s.filter : 'all',
190    group: GROUPS.includes(s.group) ? s.group : 'none',
191    flipped: arrayOf(s.flipped),
192    showDone: arrayOf(s.showDone),
193    sel: num(s.sel),
194    first: num(s.first),
195    agentSel: num(s.agentSel),
196    tick: num(s.tick),
197    onlyRepo: s.onlyRepo !== false,
198    help: s.help === true,
199    wheelSeen: typeof s.wheelSeen === 'number' ? s.wheelSeen : -1,
200    insight: typeof s.insight === 'number' ? s.insight : -1,
201    hfilter: HISTORY_FILTERS.includes(s.hfilter) ? s.hfilter : 'all',
202    query: typeof s.query === 'string' ? s.query : '',
203    searching: s.searching === true,
204    olderOpen: s.olderOpen === true,
205    zoom: ZOOMS.includes(s.zoom) ? s.zoom : 'story',
206    traceAsk: typeof s.traceAsk === 'string' ? s.traceAsk : '',
207    traceAskTick: typeof s.traceAskTick === 'number' ? s.traceAskTick : -100,
208    traceAt: num(s.traceAt),
209    note: typeof s.note === 'string' ? s.note : '',
210    noteTick: typeof s.noteTick === 'number' ? s.noteTick : -100,
211    confirm: s.confirm === 'explain' || s.confirm === 'patterns' ? s.confirm : '',
212    confirmTick: typeof s.confirmTick === 'number' ? s.confirmTick : -100,
213    patternsOpen: s.patternsOpen !== false,
214    zone: s.zone === 'caption' || s.zone === 'tabs' ? s.zone : 'content',
215    barAt: num(s.barAt),
216    traceFocus: typeof s.traceFocus === 'string' ? s.traceFocus : null,
217    traceJump: s.traceJump === true,
218    traceLane: typeof s.traceLane === 'string' ? s.traceLane : null,
219    tquery: typeof s.tquery === 'string' ? s.tquery : '',
220    mark: typeof s.mark === 'string' ? s.mark : null,
221    compare: Array.isArray(s.compare) && s.compare.length === 2 && s.compare.every(x => typeof x === 'string') ? [s.compare[0]!, s.compare[1]!] : null,
222    exportSeen: num(s.exportSeen),
223  }
224}
225
226const duration = (ms: number) => {
227  const s = Math.max(0, Math.floor(ms / 1000))
228  if (s < 60) return `${s}s`
229  const m = Math.floor(s / 60)
230  return m < 60 ? `${m}m ${String(s % 60).padStart(2, '0')}s` : `${Math.floor(m / 60)}h ${String(m % 60).padStart(2, '0')}m`
231}
232// a ruler's relative time: 0:30, 4:00, 1:05:00
233const offset = (ms: number) => {
234  const s = Math.max(0, Math.round(ms / 1000))
235  const h = Math.floor(s / 3600)
236  const m = Math.floor((s % 3600) / 60)
237  return h ? `${h}:${String(m).padStart(2, '0')}:${String(s % 60).padStart(2, '0')}` : `${m}:${String(s % 60).padStart(2, '0')}`
238}
239const clock = (t: number) => new Date(t).toLocaleTimeString('en-US', { hour: 'numeric', minute: '2-digit' })
240const clockSec = (t: number) => new Date(t).toLocaleTimeString('en-US', { hour: 'numeric', minute: '2-digit', second: '2-digit' })
241const baseName = (p: string) => p.split('/').filter(Boolean).pop() ?? p
242// 3,520 rather than 3520: counts read faster with separators
243const num = (n: number) => n.toLocaleString('en-US')
244
245// The status line's bar: ▰ filled, ▱ empty, rounded to the nearest cell.
246export function bar(done: number, total: number, width: number): { filled: string; empty: string; pct: number } {
247  const pct = total > 0 ? Math.round((done / total) * 100) : 0
248  const full = Math.min(width, Math.round((pct * width) / 100))
249  return { filled: '▰'.repeat(full), empty: '▱'.repeat(Math.max(0, width - full)), pct }
250}
251
252// A roll-up bar split by status, in cells: done, failed or stopped, then running.
253export function statusCells(c: { done: number; failed: number; stopped: number; running: number; total: number }, width: number) {
254  if (c.total === 0) return { done: 0, bad: 0, running: width }
255  const done = Math.round((c.done / c.total) * width)
256  const bad = Math.min(width - done, Math.max(c.failed + c.stopped > 0 ? 1 : 0, Math.round(((c.failed + c.stopped) / c.total) * width)))
257  return { done, bad, running: width - done - bad }
258}
259
260// Word wrap to a width in cells, so text scrolls and clips by whole lines.
261export function wrap(text: string, width: number): string[] {
262  const out: string[] = []
263  for (const para of text.split('\n')) {
264    if (!para.trim()) { out.push(''); continue }
265    let line = ''
266    for (const word of para.split(/\s+/)) {
267      if (!word) continue
268      if ((line ? cellWidth(line) + 1 : 0) + cellWidth(word) > width && line) { out.push(line); line = '' }
269      line = line ? `${line} ${word}` : cellWidth(word) > width ? fit(word, width) : word
270    }
271    if (line) out.push(line)
272  }
273  return out
274}
275
276export function step(n: number, from: number, dir: 1 | -1, ok: (i: number) => boolean): number {
277  for (let i = from + dir; i >= 0 && i < n; i += dir) if (ok(i)) return i
278  return from
279}
280
281// ── unified diff hunks for the engine's own diff drawing ──────────────────
282const CODE_LIMIT = 9000
283// One edit as unified-diff hunks, split so each stays under the Code element's size limit.
284export function unifiedHunks(lines: DiffLine[]): string[] {
285  const out: string[] = []
286  let chunk: DiffLine[] = []
287  let size = 0
288  const flush = () => {
289    if (chunk.length === 0) return
290    const oldNos = chunk.filter(l => l.op !== '+').map(l => l.oldNo ?? 0)
291    const newNos = chunk.filter(l => l.op !== '-').map(l => l.newNo ?? 0)
292    const firstOld = oldNos[0] ?? Math.max(0, (chunk[0]!.newNo ?? 1) - 1)
293    const firstNew = newNos[0] ?? Math.max(0, (chunk[0]!.oldNo ?? 1) - 1)
294    const head = `@@ -${firstOld},${oldNos.length} +${firstNew},${newNos.length} @@`
295    out.push([head, ...chunk.map(l => `${l.op === ' ' ? ' ' : l.op}${l.text}`)].join('\n'))
296    chunk = []
297    size = 0
298  }
299  for (const l of lines) {
300    const len = l.text.length + 2
301    if (size + len > CODE_LIMIT) flush()
302    chunk.push({ ...l, text: l.text.length > CODE_LIMIT - 100 ? l.text.slice(0, CODE_LIMIT - 100) : l.text })
303    size += len
304  }
305  flush()
306  return out
307}
308
309type Scope = { kind: 'node'; id: string } | { kind: 'phase'; wfId: string; phase: string }
310type FileItem = { row: FileRow }
311type DiffBlock = { rec: EditRecord; hunks: string[]; added: number; removed: number }
312
313// A row is a run of coloured pieces, laid out to an exact width in cells.
314type Seg = { t: string; c?: string; b?: boolean; bg?: string }
315type Row = { segs: Seg[]; bg?: string; hit?: Hit[] }
316type Hit = { x0: number; x1: number; act: () => void }
317const seg = (t: string, c?: string, b?: boolean): Seg => ({ t, c, b })
318const width = (segs: Seg[]) => segs.reduce((w, s) => w + cellWidth(s.t), 0)
319
320// Cuts pieces to a width (… on the last one kept), then pads with one piece of spaces.
321function lay(segs: Seg[], w: number): Seg[] {
322  const out: Seg[] = []
323  let used = 0
324  for (const s of segs) {
325    const cw = cellWidth(s.t)
326    if (used + cw <= w) { out.push(s); used += cw; continue }
327    const room = w - used
328    if (room > 0) { out.push({ ...s, t: fit(s.t, room) }); used += cellWidth(fit(s.t, room)) }
329    break
330  }
331  if (used < w) out.push({ t: ' '.repeat(w - used) })
332  return out
333}
334
335// What a selection is, as a key any lens can find again.
336const keyOf = (it: Item | undefined): string | null =>
337  it?.kind === 'node' ? it.node.id : it?.kind === 'phase' ? `phase:${JSON.stringify([it.wfId, it.phase])}` : null
338const scopeOfKey = (key: string | null, nodes: AgentNode[]): Scope | undefined => {
339  if (!key) return undefined
340  if (key.startsWith('phase:')) {
341    try {
342      const [wfId, phase] = JSON.parse(key.slice(6)) as [string, string]
343      return { kind: 'phase', wfId, phase }
344    } catch { return undefined }
345  }
346  return nodes.some(n => n.id === key) ? { kind: 'node', id: key } : undefined
347}
348
349const ACT_WORD: Record<Act, string> = { think: 'thinking', read: 'reading', write: 'writing', run: 'running', web: 'web' }
350const COLUMN_NAMES: Record<Column, [string, string]> = { running: ['RUNNING', 'RUNNING'], done: ['DONE', 'DONE'], failed: ['FAILED OR STOPPED', 'FAILED'] }
351
352let live: ClientSurface<State> | undefined
353
354const View: ClientModule<JsonValue, State> = (raw, surface) => {
355  const props = viewProps(raw)
356  const { Box, Text, Code } = surface.elements
357  const T: Theme = themeOf(props.theme)
358  const C = T.c
359  live = surface
360  const s: State = viewState(surface.state)
361  if (surface.state === undefined) {
362    surface.setState(s)
363    surface.every(TICK_MS, () => live?.state && live.setState({ ...live.state, tick: live.state.tick + 1 }))
364  }
365  if (surface.state !== undefined && s.atSeen !== props.at) surface.setState({ ...s, atSeen: props.at, tickAtSeen: s.tick })
366  const now = s.atSeen === props.at ? props.at + (s.tick - s.tickAtSeen) * TICK_MS : props.at
367  const pulse = s.tick % 2 === 0
368
369  // ── geometry, from the region as laid out now ─────────────────────────
370  const W = Math.max(20, surface.columns || 100)
371  const R = Math.max(8, surface.rows || 30)
372  const IW = W - 4 // inside the frame and its one-cell margins
373  const CH = R - 2 // rows between the top and bottom borders
374  const layout = W >= 140 ? 'split' : W >= 100 ? 'full' : 'compact'
375  const LW = layout === 'split' ? Math.floor(IW * 0.45) : IW
376  const RW = layout === 'split' ? IW - LW - 3 : IW
377
378  // History filtered to this repository: a run belongs where its top node ran.
379  const repoHistory = (() => {
380    if (!s.onlyRepo || !props.repo) return props.history
381    const byId = new Map(props.history.map(n => [n.id, n]))
382    const top = (n: AgentNode) => { let x = n; while (x.parentId && byId.has(x.parentId)) x = byId.get(x.parentId)!; return x }
383    const here = folderKey(props.repo)
384    return props.history.filter(n => runKey(top(n)) === here)
385  })()
386  const noRepoRuns = props.history.filter(n => !n.parentId && !runKey(n)).length
387  const isHistory = s.tab === 'history'
388  const nodes = isHistory ? repoHistory : props.nodes
389  const allNodes = joinNodes(props.nodes, props.history)
390  const run = s.path ? nodes.find(n => n.id === s.path) : undefined
391  const isInWorkflow = (n: AgentNode) => !!n.parentId && nodes.some(p => p.id === n.parentId && p.kind === 'workflow')
392  // a trace needs a run open; on the run list the lens falls back to the tree
393  const lens: Lens = s.lens === 'trace' && !run ? 'tree' : s.lens
394  const offered = lensesFor(!!run)
395  const nextLensOf = (l: Lens) => offered[(offered.indexOf(l) + 1) % offered.length] ?? 'tree'
396
397  // ── AI-written blocks: who wrote them, what it cost, how old they are ───────
398  const aiLabel = (b: { model?: string; tokens?: number; at?: number } | undefined): string =>
399    !b?.model ? '' : [b.model, ...(b.tokens ? [`${kTokens(b.tokens)} tokens`] : []), ...(b.at ? [ago(now - b.at)] : [])].join(' · ')
400  const isFull = props.ai === 'full'
401  // Patterns across runs, above the day groups: a heading, then per card its title, evidence,
402  // what to try and the runs it rests on (those rows open the run). Width: the list's.
403  const historyRunCount = props.history.filter(n => !n.parentId).length
404  const patternItems = (): Item[] => {
405    if (s.query || s.hfilter !== 'all') return []
406    const doc = props.patterns
407    const busy = !!props.patternsBusy
408    if (!doc && !busy && (!isFull || historyRunCount < 2)) return []
409    const note = busy ? `writing… (Sonnet)` : doc ? `${aiLabel(doc)}${isFull ? '   ·   g g writes them again' : ''}` : 'g asks Sonnet to look for patterns'
410    const head: Item = { kind: 'header', text: PATTERNS_TITLE, note, ...(doc ? { isOpen: s.patternsOpen } : {}) }
411    if (!doc || !s.patternsOpen) return [head]
412    const w = Math.max(20, (layout === 'split' ? LW : IW) - 6)
413    const out: Item[] = [head]
414    for (const c of doc.cards) {
415      out.push({ kind: 'pattern', tone: 'title', text: c.title })
416      if (c.evidence) for (const t of wrap(c.evidence, w)) out.push({ kind: 'pattern', tone: 'evidence', text: t })
417      if (c.try) wrap(`Try: ${c.try}`, w).forEach(t => out.push({ kind: 'pattern', tone: 'try', text: t }))
418      for (const r of c.runs) {
419        const node = props.history.find(n => n.id === r.id)
420        if (node) out.push({ kind: 'node', node, species: 'cat', depth: 1, guide: 'pattern' })
421      }
422    }
423    return out
424  }
425
426  // ── the three lenses over the same runs ───────────────────────────────
427  // the History page lists runs by day, filtered and searched; inside a run, its tree
428  const listFor = (flipped: readonly string[], showDone: readonly string[], at: AgentNode | undefined): Item[] =>
429    at ? runTree(at, nodes, s.filter, flipped, showDone)
430      : isHistory ? [...patternItems(), ...historyItems(nodes, now, { filter: s.hfilter, query: s.query, olderOpen: s.olderOpen })]
431        : topItems(nodes, s.filter, isHistory, now, s.group, flipped, showDone)
432  const agentItems: Item[] = listFor(s.flipped, s.showDone, run)
433  // the runs the run list shows, in its order, for the board and the timeline
434  const topRuns = topItems(nodes, s.filter, isHistory, now, 'none').flatMap(it => (it.kind === 'node' ? [it.node] : []))
435  const lanes: Lane[] = boardLanes(run, nodes, topRuns, s.filter)
436  const laneCells = lanes.map(l => COLUMNS.map(col => l.cards.filter(n => columnOf(n) === col)))
437  // a board's cards in reading order: lane by lane, column by column, the first few of each cell
438  const boardCards = laneCells.flatMap(cells => cells.flatMap(list => list.slice(0, CARDS_PER_CELL)))
439  const timeRows: TimeRow[] = timelineRows(run, nodes, topRuns, s.filter)
440  const timeCards = timeRows.flatMap(r => (r.kind === 'bar' ? [r.node] : []))
441  const cards = lens === 'board' ? boardCards : lens === 'timeline' ? timeCards : []
442
443  // ── what the screen is about ─────────────────────────────────────────
444  const view: ViewName = run ? s.view : 'agents'
445  const inAgents = view === 'agents'
446  // two runs side by side, when both are still kept
447  const pair = s.compare ? s.compare.map(id => allNodes.find(n => n.id === id)) : []
448  const comparing = pair.length === 2 && pair.every(Boolean)
449  const mode: 'help' | 'compare' | 'agents' | 'board' | 'timeline' | 'trace' | 'files' | 'diff' | 'output' = s.help ? 'help'
450    : comparing ? 'compare'
451    : inAgents ? (lens === 'tree' ? 'agents' : lens)
452      : view === 'output' ? 'output' : s.diffFile !== null ? 'diff' : 'files'
453  const asked = Math.min(Math.max(0, inAgents ? s.sel : s.agentSel), Math.max(0, agentItems.length - 1))
454  const snap = [asked, ...agentItems.map((_, i) => i).filter(i => i > asked), ...agentItems.map((_, i) => i).filter(i => i < asked).reverse()]
455  const agentSel = snap.find(i => isSelectable(agentItems[i])) ?? asked
456  const cardSel = Math.min(Math.max(0, s.sel), Math.max(0, cards.length - 1))
457  const focusItem = lens === 'tree' ? agentItems[agentSel] : undefined
458  const focusCard = lens !== 'tree' ? cards[cardSel] : undefined
459  // the key of what is selected in the agents view now
460  const focusKey = lens === 'tree' ? keyOf(focusItem) : focusCard?.id ?? null
461  const scope: Scope | undefined = inAgents
462    ? (scopeOfKey(focusKey, nodes) ?? (run ? { kind: 'node', id: run.id } : undefined))
463    : (scopeOfKey(s.focus, nodes) ?? (run ? { kind: 'node', id: run.id } : undefined))
464  const scopeList = scope ? scopeNodes(nodes, scope) : []
465  const scopeNode = scope?.kind === 'node' ? nodes.find(n => n.id === scope.id) : undefined
466  const files = fileRows(scopeList)
467  const names = shortPaths(files.map(f => f.path))
468  const scopeIds = new Set(scopeList.map(n => n.id))
469  const diffOpen = mode === 'diff'
470
471  const fileItems: FileItem[] = files.map(row => ({ row }))
472  const blocks: DiffBlock[] = (() => {
473    if (!diffOpen || props.diff?.path !== s.diffFile) return []
474    return props.diff.edits.filter(r => scopeIds.has(r.agentId)).map(rec => {
475      const lines = lineDiff(rec.old, rec.new, rec.line)
476      return { rec, hunks: unifiedHunks(lines), ...diffCounts(lines) }
477    })
478  })()
479
480  // what needs a look: inside a run, everything under it; on the run list, what is live
481  const shownInsights: Insight[] = run ? insights(scopeNodes(nodes, { kind: 'node', id: run.id }), nodes, now)
482    : !isHistory ? insights(props.nodes, props.nodes, now) : []
483  // the same insights on the rows they are about, inside a run
484  const flags: Map<string, Flag> = run ? rowFlags(scopeNodes(nodes, { kind: 'node', id: run.id }), nodes, now) : new Map()
485  // where a run's time went, on its timeline: the chain that set its end, and the idle time
486  const crit = run && lens === 'timeline' ? criticalPath(timeCards, now) : undefined
487  const onPath = new Set(crit?.ids ?? [])
488  const idle = run && lens === 'timeline' ? idleGaps(timeCards, now) : { gaps: [], ms: 0 }
489
490  // ── pieces ───────────────────────────────────────────────────────────
491  const outcome = (n: AgentNode) => n.summary ?? (n.kind === 'workflow' ? firstSentence(readableResult(n.result)) : firstSentence(n.result))
492  const elapsed = (n: Pick<AgentNode, 'status' | 'startedAt' | 'endedAt'>) => (n.status === 'running' ? now : n.endedAt ?? now) - n.startedAt
493  const statusIcon = (n: Pick<AgentNode, 'status'>) => (n.status === 'running' && !pulse ? T.runningAlt : T.status[n.status].icon)
494  const statusSegs = (n: Pick<AgentNode, 'status' | 'startedAt' | 'endedAt'>, extra?: string): Seg[] => {
495    const st = T.status[n.status]
496    return [seg(statusIcon(n), st.color), seg(' '), seg(st.word, st.color, true),
497      seg('   '), seg(duration(elapsed(n)), C.muted), ...(extra ? [seg('   '), seg(extra, C.muted)] : [])]
498  }
499  // a roll-up bar split by status: done, failed or stopped, still running
500  const rollSegs = (c: ReturnType<typeof counts>, w: number): Seg[] => {
501    const cells = statusCells(c, w)
502    return [seg(T.bar.full.repeat(cells.done), C.ok), seg(T.bar.full.repeat(cells.bad), C.bad), seg(T.bar.empty.repeat(cells.running), C.warn)]
503  }
504  const changeSegs = (rows: FileRow[]): Seg[] => {
505    if (rows.length === 0) return [seg('None', C.muted)]
506    const added = rows.reduce((a, r) => a + r.added, 0)
507    const removed = rows.reduce((a, r) => a + r.removed, 0)
508    return [seg(`${rows.length} file${rows.length === 1 ? '' : 's'}`, C.accent), seg('   '), seg(`+${num(added)}`, C.add), seg(' '), seg(`−${num(removed)}`, C.del)]
509  }
510  // tokens by model family: "Opus 120k (2) · Sonnet 40k (5)"
511  const spendSegs = (scope: AgentNode[]): Seg[] => spendByModel(scope).flatMap((m, i) => [
512    ...(i ? [seg('  ·  ', C.faint)] : []), seg(m.model, C.soft), seg(` ${kTokens(m.tokens)}`, C.ink), seg(` (${m.agents})`, C.faint)])
513  const nowSegs = (n: AgentNode): Seg[] => [seg('› ', C.accent), seg(n.activity ?? 'Thinking', C.ink), seg(`   ${ACT_WORD[n.act ?? 'think']}`, C.faint)]
514  const quietFor = (n: AgentNode) => (n.status === 'running' ? now - (n.lastToolAt ?? n.startedAt) : 0)
515  // a cluster's aspects as chips: each member's short task with how it went
516  const chipSegs = (groupId: string, w: number): Seg[] => {
517    const list = aspects(nodes, groupId)
518    if (!list.length) return []
519    const each = Math.max(6, Math.floor(w / list.length) - 5)
520    const out: Seg[] = []
521    let used = 0
522    for (let i = 0; i < list.length; i++) {
523      const { node, text } = list[i]!
524      const piece: Seg[] = [...(i ? [seg('   ')] : []), seg(statusIcon(node), T.status[node.status].color), seg(' '), seg(fit(text, each), C.soft)]
525      const rest = list.length - i - 1
526      if (used + width(piece) + (rest ? 8 : 0) > w && i > 0) { out.push(seg(`   +${list.length - i}`, C.faint)); break }
527      out.push(...piece)
528      used += width(piece)
529    }
530    return out
531  }
532  const overlapSegs = (groupId: string): Seg[] => {
533    const o = overlaps(scopeNodes(nodes, { kind: 'node', id: groupId }).filter(k => k.id !== groupId))[0]
534    if (!o) return []
535    const more = overlaps(scopeNodes(nodes, { kind: 'node', id: groupId }).filter(k => k.id !== groupId)).length - 1
536    return [seg(`${T.warn} `, C.warn), seg(`${baseName(o.path)} edited by ${o.by.length} members`, C.warn), seg(` (${o.by.map(b => b.label).join(', ')})`, C.muted),
537      ...(more > 0 ? [seg(`   +${more} more file${more === 1 ? '' : 's'}`, C.faint)] : [])]
538  }
539
540  // ── the report: Result, Parts or Done, Decisions, Problems, Next, Changed, Totals ──
541  // The words are the model's; Changed and Totals come from the mod's own records.
542  type Section = [string, Seg[][]]
543  const pmSegs = (added: number, removed: number): Seg[] => [seg(`+${num(added)}`, C.add), seg(' '), seg(`−${num(removed)}`, C.del)]
544  const phaseStatus = (p: { running: number; failed: number; stopped: number }) =>
545    p.failed ? T.status.failed : p.running ? T.status.running : p.stopped ? T.status.killed : T.status.done
546  // one line per part: a workflow's phases, or a cluster's members
547  // `all` (the Output view) wraps each part's outcome under itself; the overview cuts it to one line
548  const partRows = (n: AgentNode, w: number, all = false): Seg[][] => {
549    const line = (glyph: { icon: string; color: string }, name: string, nameW: number, count: string, outcome: string, files: FileRow[]): Seg[][] => {
550      const added = files.reduce((a, f) => a + f.added, 0)
551      const removed = files.reduce((a, f) => a + f.removed, 0)
552      const pm = files.length ? pmSegs(added, removed) : []
553      const head: Seg[] = [seg(padEnd(glyph.icon, 2), glyph.color), seg(' '), seg(padEnd(fit(name, nameW), nameW), C.ink, true), ...(count ? [seg(`  ${count}`, C.muted)] : [])]
554      const room = Math.max(8, w - width(head) - 2 - (pm.length ? width(pm) + 2 : 0))
555      const lines = all ? wrap(outcome, room) : [fit(outcome, room)]
556      return lines.map((said, i) => i === 0
557        ? [...head, seg('  '), seg(said, C.soft), seg(' '.repeat(Math.max(0, room - cellWidth(said)))), ...(pm.length ? [seg('  '), ...pm] : [])]
558        : [seg(' '.repeat(width(head) + 2)), seg(said, C.soft)])
559    }
560    if (n.kind === 'workflow') {
561      const ps = pipeline(n, nodes)
562      const nameW = Math.min(14, Math.max(4, ...ps.map(p => cellWidth(p.phase))))
563      return ps.flatMap(p => line(phaseStatus(p), p.phase, nameW, padStart(`${p.total} agent${p.total === 1 ? '' : 's'}`, 9),
564        n.partReports?.[p.phase]?.result ?? phaseWords(p), fileRows(scopeNodes(nodes, { kind: 'phase', wfId: n.id, phase: p.phase }))))
565    }
566    if (n.kind === 'group') {
567      const kids = childrenOf(nodes, n.id).sort((a, b) => a.startedAt - b.startedAt)
568      const nameW = Math.min(30, Math.max(8, ...kids.map(k => cellWidth(k.label))))
569      return kids.flatMap(k => line(T.status[k.status], k.label, nameW, '', outcomeOf(k) || noReportReason(k), fileRows(scopeNodes(nodes, { kind: 'node', id: k.id }))))
570    }
571    return []
572  }
573  const changedRows = (f: Facts, w: number, all: boolean): Seg[][] => {
574    const short = shortPaths(f.files.map(x => x.path))
575    if (all) {
576      const nameW = Math.min(w - 16, Math.max(...f.files.map(x => cellWidth(short.get(x.path) ?? x.path))))
577      return f.files.map(x => [seg(padEnd(fit(short.get(x.path) ?? x.path, nameW), nameW), C.ink), seg('   '), ...pmSegs(x.added, x.removed)])
578    }
579    const out: Seg[] = []
580    let shown = 0
581    for (const x of f.files) {
582      const piece: Seg[] = [...(shown ? [seg('  ·  ', C.faint)] : []), seg(short.get(x.path) ?? x.path, C.ink), seg(' '), ...pmSegs(x.added, x.removed)]
583      const rest = f.files.length - shown - 1
584      if (width(out) + width(piece) + (rest ? 10 : 0) > w && shown) break
585      out.push(...piece)
586      shown++
587    }
588    if (shown < f.files.length) out.push(seg(`  ·  +${f.files.length - shown} more`, C.faint))
589    return [out]
590  }
591  const plural = (k: number, one: string) => `${k} ${one}${k === 1 ? '' : 's'}`
592  const totalsRows = (f: Facts, w: number): Seg[][] => {
593    const parts: Seg[][] = [
594      ...(f.phases ? [[seg(plural(f.phases, 'phase'), C.soft)]] : []),
595      [seg(plural(f.agents, 'agent'), C.soft)],
596      [seg(plural(f.files.length, 'file'), C.soft)],
597      ...(f.files.length ? [pmSegs(f.added, f.removed)] : []),
598      [seg(duration(f.ms), C.soft)],
599      ...(f.tokens ? [[seg(`${kTokens(f.tokens)} tokens`, C.soft)]] : []),
600    ]
601    const lines: Seg[][] = [[]]
602    for (const p of parts) {
603      const cur = lines[lines.length - 1]!
604      const piece = [...(cur.length ? [seg('  ·  ', C.faint)] : []), ...p]
605      if (cur.length && width(cur) + width(piece) > w) lines.push([...p])
606      else cur.push(...piece)
607    }
608    return lines
609  }
610  // `all`: the Output view's full block; otherwise lists and long text are capped for the
611  // overview; `brief` keeps only Result, Problems, Next and Totals, for a pane short of rows
612  const reportSections = (sc: Scope, valueW: number, all: boolean, brief = false): Section[] => {
613    const node = sc.kind === 'node' ? nodes.find(x => x.id === sc.id) : undefined
614    const wf = sc.kind === 'phase' ? nodes.find(x => x.id === sc.wfId) : undefined
615    const r = sc.kind === 'phase' ? wf?.partReports?.[sc.phase] : node ? reportOf(node) : undefined
616    const f = reportFacts(nodes, sc, now)
617    const text = (t: string, c: string): Seg[][] => wrap(t, valueW).slice(0, all ? 99 : brief ? 2 : 3).map(l => [seg(l, c)])
618    const bullets = (items: { text: string; source?: string }[], c: string): Seg[][] => items.slice(0, 3).flatMap(it =>
619      wrap(`${it.text}${it.source ? ` [${it.source}]` : ''}`, valueW - 3).slice(0, all ? 99 : 2).map((l, i) => [seg(i ? '   ' : '•  ', C.faint), seg(l, c)]))
620    const out: Section[] = []
621    const aiOff = props.ai === 'off' && !r?.result
622    const fallback = aiOff ? 'AI is off: no written report. Set ai to cheap or full in /config.'
623      : sc.kind === 'phase' ? 'No part report yet.' : node ? noReportReason(node) : ''
624    out.push(['Result', text(r?.result ?? fallback, aiOff ? C.muted : C.ink)])
625    // with AI off the failures still show, from the records
626    const recordProblems = aiOff ? scopeNodes(nodes, sc).filter(n => n.kind === 'agent' && (n.status === 'failed' || n.status === 'killed'))
627      .map(n => ({ text: `${n.label} ${n.status === 'failed' ? 'failed' : 'was stopped'}.` })) : []
628    if (brief) {
629      if (r?.problems?.length) out.push(['Problems', r.problems.slice(0, 2).map(p => [seg('•  ', C.faint), seg(fit(`${p.text}${p.source ? ` [${p.source}]` : ''}`, valueW - 3), C.warn)])])
630      if (r?.next) out.push(['Next', [[seg(fit(r.next, valueW), C.soft)]]])
631      out.push(['Totals', totalsRows(f, valueW)])
632      return out
633    }
634    const parts = node ? partRows(node, valueW, all) : []
635    if (parts.length) {
636      const cap = all ? parts.length : 6
637      out.push(['Parts', [...parts.slice(0, cap), ...(parts.length > cap ? [[seg(`+${parts.length - cap} more parts`, C.faint)]] : [])]])
638    } else if (r?.done?.length) out.push(['Done', bullets(r.done.map(t => ({ text: t })), C.soft)])
639    if (r?.decisions?.length) out.push(['Decisions', bullets(r.decisions, C.soft)])
640    if (r?.problems?.length) out.push(['Problems', bullets(r.problems, C.warn)])
641    else if (recordProblems.length) out.push(['Problems', bullets(recordProblems, C.warn)])
642    if (r?.next) out.push(['Next', text(r.next, C.soft)])
643    if (f.files.length) out.push(['Changed', changedRows(f, valueW, all)])
644    out.push(['Totals', totalsRows(f, valueW)])
645    return out
646  }
647  const sectionRows = (secs: Section[]): Row[] =>
648    secs.flatMap(([name, lines]) => lines.map((l, i) => ({ segs: [seg(padEnd(i ? '' : name, 11), C.muted), ...l] })))
649  // who wrote a report, beside its heading
650  const writtenBy = (sc: Scope): string => {
651    const r = sc.kind === 'phase' ? nodes.find(x => x.id === sc.wfId)?.partReports?.[sc.phase] : nodes.find(x => x.id === sc.id)?.report
652    if (r?.model) return aiLabel(r)
653    return props.ai === 'off' ? 'AI is off · from records' : 'from what the run kept'
654  }
655
656  // ── the overview of the selection, as rows of a given width ───────────
657  const overview = (w: number, dense: 'compact' | 'brief' | 'full'): Row[] => {
658    if (!scope) return []
659    const title = scope.kind === 'phase' ? `${scope.phase} phase` : scopeNode?.label ?? ''
660    const when = (n: AgentNode) => (isHistory ? clock(n.startedAt) : undefined)
661    let meta: Seg[] = []
662    let second: Seg[] = []
663    let rows: [string, Seg[]][] = []
664    let points: string[] = []
665    if (scope.kind === 'phase') {
666      const c = counts(scopeList)
667      const wf = nodes.find(n => n.id === scope.wfId)
668      const start = Math.min(...scopeList.map(k => k.startedAt))
669      const end = c.running ? now : Math.max(...scopeList.map(k => k.endedAt ?? now))
670      meta = statusSegs({ status: c.running ? 'running' : c.failed ? 'failed' : 'done', startedAt: start, endedAt: end })
671      second = [...rollSegs(c, 12), seg(`   ${c.total - c.running} of ${c.total} agents`, C.muted)]
672      const spend = spendSegs(scopeList)
673      rows = [['Agents', [seg(phaseWords({ phase: scope.phase, ...c }), C.ink)]], ['Changes', changeSegs(files)], ...(spend.length ? [['Spend', spend] as [string, Seg[]]] : []), ['Part of', [seg(wf?.label ?? 'workflow', C.soft)]]]
674    } else if (scopeNode && scopeNode.kind !== 'agent') {
675      const n = scopeNode
676      const kids = childrenOf(nodes, n.id)
677      const c = counts(kids)
678      const busy = kids.find(x => x.status === 'running')
679      meta = statusSegs(n, when(n))
680      second = [...rollSegs(c, 12), seg(`   ${c.total - c.running} of ${c.total} ${n.kind === 'group' ? 'members' : 'agents'}`, C.muted)]
681      const phases: Seg[] = pipeline(n, nodes).flatMap((p, i) => [...(i ? [seg('  →  ', C.faint)] : []), seg(p.phase, C.ink), seg(`  ${phaseWords(p)}`, C.muted)])
682      const inline = mode === 'agents' && n.kind === 'group' && (dense !== 'full' || layout !== 'split')
683      const overlap = n.kind === 'group' && !inline ? overlapSegs(n.id) : []
684      rows = [
685        n.kind === 'group' ? ['Agents', [seg(phaseWords({ phase: '', ...c }), C.ink)]] : ['Phases', phases],
686        ...(n.kind === 'group' && !inline ? [['Aspects', chipSegs(n.id, w - 11)] as [string, Seg[]]] : []),
687        ...(overlap.length ? [['Overlap', overlap] as [string, Seg[]]] : []),
688        ['Changes', changeSegs(files)],
689        ...(spendSegs(scopeList).length ? [['Spend', spendSegs(scopeList)] as [string, Seg[]]] : []),
690        n.status === 'running' && busy ? ['Now', [...nowSegs(busy), seg(`   ${busy.label}`, C.muted)]] : ['Outcome', [seg(outcome(n) || '—', C.ink)]],
691      ]
692      points = n.points ?? []
693    } else if (scopeNode) {
694      const n = scopeNode
695      const inWf = isInWorkflow(n)
696      meta = statusSegs(n, when(n))
697      second = [seg([prettyType(n, inWf), prettyModel(n.model), inWf && n.phase ? `${n.phase} phase` : n.where && n.where !== 'main' ? whereLabel(n.where) : ''].filter(Boolean).join('   ·   '), C.muted)]
698      const quiet = quietFor(n)
699      rows = [
700        n.status === 'running' ? ['Now', [...nowSegs(n), ...(quiet >= 120_000 ? [seg(`   ${T.warn} quiet ${duration(quiet)}`, C.warn)] : [])]] : ['Outcome', [seg(outcome(n) || noReportReason(n), C.ink)]],
701        ['Changes', changeSegs(files)],
702        ['Work', [seg(`${workSummary(n)}${n.tokens ? `   ·   ${Math.round(n.tokens / 1000)}k tokens` : ''}`, C.soft)]],
703      ]
704      points = n.points ?? []
705    }
706    // finished work shows its report: the model's words, then what changed and the totals from records
707    const isFinished = scope.kind === 'phase' ? counts(scopeList).running === 0 && scopeList.length > 0 : !!scopeNode && scopeNode.status !== 'running'
708    const secs = isFinished ? reportSections(scope, w - 11, false, dense === 'brief') : undefined
709    const out: Row[] = []
710    if (dense === 'compact') {
711      const changed = files.length ? changeSegs(files) : []
712      const titleW = Math.max(8, w - width(changed) - 3)
713      const shownTitle = fit(title, titleW)
714      out.push({ segs: [seg(shownTitle, C.ink, true), seg(' '.repeat(Math.max(3, w - cellWidth(shownTitle) - width(changed)))), ...changed] })
715      const what = scope.kind === 'node' && scopeNode?.kind === 'agent' ? second : rows[0]?.[1] ?? []
716      out.push({ segs: [...meta, ...(what.length ? [seg('   ·   ', C.faint), ...what] : [])] })
717      const result = secs?.find(([k]) => k === 'Result')?.[1][0]
718      const [name, value] = result ? ['Result', result] : rows.find(([k]) => k === 'Now' || k === 'Outcome') ?? rows[0] ?? ['', []]
719      out.push({ segs: [seg(padEnd(name, 10), C.muted), ...value] })
720      return out
721    }
722    for (const line of wrap(title, w).slice(0, dense === 'brief' ? 1 : 2)) out.push({ segs: [seg(line, C.ink, true)] })
723    out.push({ segs: meta })
724    if (dense !== 'brief') { out.push({ segs: second }); out.push({ segs: [] }) }
725    if (secs) {
726      // a parent keeps its one status line ("6 done"); the report follows
727      const status = scope.kind === 'phase' || scopeNode?.kind !== 'agent' ? rows.filter(([k]) => k === 'Agents' || k === 'Phases' || k === 'Spend') : []
728      for (const [name, value] of status) out.push({ segs: [seg(padEnd(name, 11), C.muted), ...value] })
729      out.push(...sectionRows(secs))
730      if (scopeNode?.kind === 'agent') out.push(...rows.filter(([k]) => k === 'Work').map(([name, value]) => ({ segs: [seg(padEnd(name, 11), C.muted), ...value] })))
731      return out
732    }
733    for (const [name, value] of rows) {
734      const valueW = w - 11
735      // a long sentence wraps under its value column
736      if (value.length === 1 && cellWidth(value[0]!.t) > valueW) {
737        wrap(value[0]!.t, valueW).slice(0, 3).forEach((t, i) => out.push({ segs: [seg(padEnd(i ? '' : name, 11), C.muted), seg(t, value[0]!.c)] }))
738      } else out.push({ segs: [seg(padEnd(name, 11), C.muted), ...value] })
739    }
740    if (layout === 'split' && points.length) {
741      out.push({ segs: [] })
742      out.push({ segs: [seg('Key points', C.accent, true)] })
743      for (const p of points) wrap(p, w - 3).forEach((t, i) => out.push({ segs: [seg(i ? '   ' : ' • ', C.faint), seg(t, C.soft)] }))
744    }
745    return out
746  }
747
748  // ── output text ──────────────────────────────────────────────────────
749  const outRows = (w: number): Row[] => {
750    if (mode !== 'output') return []
751    const out: Row[] = []
752    const para = (t: string, c?: string, b?: boolean) => wrap(t, w).forEach(text => out.push({ segs: [seg(text, c, b)] }))
753    const gap = () => out.push({ segs: [] })
754    // finished work opens with its whole report; the agents' own words follow
755    const reportBlock = (sc: Scope) => {
756      out.push({ segs: [seg('Report', C.accent, true), seg(`   ${writtenBy(sc)}`, C.faint)] })
757      out.push(...sectionRows(reportSections(sc, w - 11, true)))
758      gap()
759    }
760    if (scope?.kind === 'phase') {
761      if (scopeList.length && counts(scopeList).running === 0) reportBlock(scope)
762      para(`What the ${scope.phase} phase reported`, C.accent, true)
763      for (const k of scopeList) {
764        gap()
765        para(k.label, C.ink, true)
766        para(k.summary ?? (firstSentence(k.result, 300) || noReportReason(k)), C.soft)
767      }
768      return out
769    }
770    const n = scopeNode
771    if (!n) return out
772    // the run's brief, when it has one or one is being written; else how to get one
773    if (run && n.id === run.id) {
774      const writing = props.explaining?.includes(run.id)
775      const b: Brief | undefined = run.explain
776      if (b || writing) {
777        out.push({ segs: [seg('Explain', C.accent, true), seg(`   ${writing ? 'writing… (Sonnet)' : aiLabel(b)}`, C.faint)] })
778        if (b) {
779          const LBL = 18
780          const vw = Math.max(10, w - LBL)
781          const line = (name: string, t: string, c: string) => wrap(t, vw).forEach((x, i) => out.push({ segs: [seg(padEnd(i ? '' : name, LBL), C.muted), seg(x, c)] }))
782          const list = (name: string, items: string[], c: string) => items.forEach((t, k) => wrap(t, vw - 3).forEach((x, i) =>
783            out.push({ segs: [seg(padEnd(k === 0 && i === 0 ? name : '', LBL), C.muted), seg(i ? '   ' : '•  ', C.faint), seg(x, c)] })))
784          if (b.goal) line('Goal', b.goal, C.ink)
785          if (b.who?.length) list('Who did what', b.who, C.soft)
786          if (b.connected) line('How it connected', b.connected, C.soft)
787          if (b.outcome) line('Outcome', b.outcome, C.ink)
788          if (b.open?.length) list('Open issues', b.open, C.warn)
789        }
790        gap()
791      } else if (isFull) {
792        out.push({ segs: [seg('e', C.soft, true), seg(' asks Sonnet to explain how this run hung together.', C.faint)] })
793        gap()
794      }
795    }
796    const isDone = n.status !== 'running'
797    if (isDone && scope) reportBlock(scope)
798    if (!isDone && n.summary) { para('Outcome', C.accent, true); para(n.summary, C.ink) }
799    if (!isDone && n.points?.length) { gap(); para('Key points', C.accent, true); n.points.forEach(p => para(`•  ${p}`, C.soft)) }
800    if (n.kind !== 'agent') {
801      if (!isDone) gap()
802      para(n.kind === 'group' ? 'Members' : 'Agents', C.accent, true)
803      for (const k of childrenOf(nodes, n.id)) para(`${k.phase ? `${k.phase}  ·  ` : ''}${k.label} — ${k.summary ?? (firstSentence(k.result, 160) || noReportReason(k))}`, C.soft)
804    }
805    const report = n.kind === 'workflow' ? readableResult(n.result) : n.result
806    if (report) {
807      gap(); para(reportHeading(n), C.accent, true)
808      for (const line of report.split('\n')) para(plain(line) || ' ', C.muted)
809    }
810    if (!isDone && !report && !n.summary) para('Still working — the report appears here when it finishes.', C.muted)
811    const task = taskText(n.prompt)
812    if (task) { gap(); para('Task it was given', C.accent, true); para(task, C.muted) }
813    return out
814  }
815
816  // ── two runs side by side: totals, phases, spend by model, files ──────
817  const compareRows = (w: number): Row[] => {
818    if (mode !== 'compare') return []
819    const [a, b] = pair as [AgentNode, AgentNode]
820    const cmp = compareRuns(allNodes, a, b, now)
821    const out: Row[] = []
822    const gap = () => out.push({ segs: [] })
823    const fmt = (m: Metric, v: number | undefined) => (v === undefined ? '—' : m.measure === 'ms' ? duration(v) : m.measure === 'tokens' ? kTokens(v) : num(v))
824    const nameW = Math.min(16, Math.max(8, ...[...cmp.totals, ...cmp.phases, ...cmp.models].map(m => cellWidth(m.name)))) + 2
825    const colW = Math.max(9, Math.min(14, Math.floor((w - nameW - 18) / 2)))
826    const change = (m: Metric): Seg => {
827      const v = verdict(m)
828      if (m.a === undefined || m.b === undefined) return seg(m.a === undefined ? 'only in B' : 'only in A', C.faint)
829      if (m.a === m.b) return seg('same', C.faint)
830      const d = m.b - m.a
831      const pct = m.a ? ` (${d > 0 ? '+' : ''}${Math.round((d / m.a) * 100)}%)` : ''
832      const abs = m.measure === 'ms' ? duration(Math.abs(d)) : m.measure === 'tokens' ? kTokens(Math.abs(d)) : num(Math.abs(d))
833      return seg(`${d > 0 ? '+' : '−'}${abs}${pct}`, v === 'better' ? C.ok : v === 'worse' ? C.bad : C.muted)
834    }
835    const table = (title: string, list: Metric[]) => {
836      if (!list.length) return
837      out.push({ segs: [seg(padEnd(title, nameW), C.accent, true), seg(padStart('A', colW), C.muted, true), seg(padStart('B', colW), C.muted, true), seg('   change', C.muted, true)] })
838      for (const m of list) out.push({ segs: [seg(padEnd(fit(m.name, nameW - 2), nameW), C.soft), seg(padStart(fmt(m, m.a), colW), C.ink), seg(padStart(fmt(m, m.b), colW), C.ink), seg('   '), change(m)] })
839      gap()
840    }
841    const who = (k: string, n: AgentNode) => [seg(`${k}  `, C.accent, true), seg(statusIcon(n), T.status[n.status].color), seg(' '), seg(n.label, C.ink, true), seg(`   ${dayLabel(n.startedAt, now)} ${clock(n.startedAt)}`, C.muted)]
842    out.push({ segs: who('A', a) }, { segs: who('B', b) })
843    gap()
844    table('Totals', cmp.totals)
845    table('Phases', cmp.phases)
846    table('Tokens by model', cmp.models)
847    const files = (title: string, list: string[]) => {
848      if (!list.length) return
849      const short = shortPaths(list)
850      out.push({ segs: [seg(title, C.accent, true), seg(`  ${list.length}`, C.faint)] })
851      wrap(list.map(p => short.get(p) ?? p).join('  ·  '), w - 3).slice(0, 6).forEach(l => out.push({ segs: [seg('   '), seg(l, C.soft)] }))
852    }
853    files('Files only A changed', cmp.files.onlyA)
854    files('Files only B changed', cmp.files.onlyB)
855    files('Files both changed', cmp.files.both)
856    if (!cmp.files.onlyA.length && !cmp.files.onlyB.length && !cmp.files.both.length) out.push({ segs: [seg('Neither run changed files.', C.muted)] })
857    return out
858  }
859
860  // ── insights: one row on narrow panes, up to two on wide ones ─────────
861  const insightRows = (w: number): Row[] => {
862    if (!shownInsights.length || mode === 'help') return []
863    const piece = (it: Insight, i: number): Seg[] => {
864      const on = i === s.insight
865      const mark = it.tone === 'bad' ? T.status.failed.icon : it.tone === 'warn' ? T.warn : '·'
866      const color = it.tone === 'bad' ? C.bad : it.tone === 'warn' ? C.warn : C.soft
867      return [seg(`${mark} `, color), seg(it.text, on ? C.accent : color, on)]
868    }
869    const label = [seg(layout === 'compact' ? '' : 'Needs a look   ', C.muted, true)]
870    const rows: Row[] = []
871    let cur: Seg[] = [...label]
872    let hits: Hit[] = []
873    const maxRows = layout === 'compact' ? 1 : 2
874    for (let i = 0; i < shownInsights.length; i++) {
875      const p = [...(width(cur) > width(label) ? [seg('     ')] : []), ...piece(shownInsights[i]!, i)]
876      const rest = shownInsights.length - i
877      const tail = rows.length + 1 === maxRows && rest > 1 ? 14 : 0
878      if (width(cur) + width(p) + tail > w && width(cur) > width(label)) {
879        if (rows.length + 1 === maxRows) { cur.push(seg(`   +${rest} more · i`, C.faint)); break }
880        rows.push({ segs: cur, hit: hits })
881        cur = [seg(' '.repeat(width(label)))]
882        hits = []
883        i--
884        continue
885      }
886      const x0 = width(cur)
887      const target = shownInsights[i]!
888      const idx = i
889      hits.push({ x0, x1: x0 + width(p), act: () => jumpTo(target.target, idx) })
890      cur.push(...p)
891    }
892    rows.push({ segs: cur, hit: hits })
893    return rows
894  }
895
896  // ── fixed blocks: top rows, the body, bottom rows ─────────────────────
897  const isReading = mode === 'output' || mode === 'diff' || mode === 'help' || mode === 'trace' || mode === 'compare'
898  // the History page's numbers on top, and the search line while there is one
899  const isHistoryPage = isHistory && !run && lens === 'tree'
900  // runs that match, not the runs a pattern card points at
901  const matchCount = isHistoryPage ? agentItems.filter(it => it.kind === 'node' && it.guide !== 'pattern').length : 0
902  const historyHeader = (): Row[] => {
903    const st = historyStats(nodes, now)
904    const sp = sparkline(st.perDay)
905    // the numbers first; then what the AI layer spent; the sparkline's caption only where it fits
906    const base: Seg[] = [seg(`${st.runs}`, C.ink, true), seg(` run${st.runs === 1 ? '' : 's'}`, C.muted), seg('     '),
907      seg(`${st.okPct}%`, C.ink, true), seg(' finished OK', C.muted), seg('     '),
908      seg(kTokens(st.tokens), C.ink, true), seg(' tokens', C.muted), seg('     '), seg(sp.glyphs, C.accent)]
909    // the sparkline's scale keeps its place (a chart needs its extremes); AI spend fits around it
910    const spent = props.aiWeek ?? 0
911    const longCap = `  runs per day, last 7 days · 0 to ${sp.max}`
912    const shortCap = `  per day, 7 days · 0 to ${sp.max}`
913    const longAi = spent ? `     AI: ${kTokens(spent)} tokens this week` : ''
914    const shortAi = spent ? `   AI ${kTokens(spent)} this week` : ''
915    const [cap, ai] = ([[longCap, longAi], [shortCap, longAi], [shortCap, shortAi], [shortCap, ''], ['', '']] as [string, string][])
916      .find(([c, a]) => width(base) + cellWidth(c) + cellWidth(a) <= IW) ?? ['', '']
917    const rows: Row[] = [{ segs: [...base, ...(cap ? [seg(cap, C.faint)] : []), ...(ai ? [seg(ai, C.faint)] : [])] }]
918    if (s.searching || s.query) {
919      rows.push({
920        segs: [seg('/ ', C.accent, true), seg(s.query, C.ink, true), ...(s.searching ? [seg(T.cursor, C.accent)] : []),
921          seg(`   ${matchCount} match${matchCount === 1 ? '' : 'es'}`, C.muted),
922          seg(s.searching ? '   enter keep · ctrl+u clear · ⌫ delete' : '   / edit · ctrl+u clear', C.faint)],
923      })
924    }
925    return rows
926  }
927  const strip = isHistoryPage && mode !== 'help' ? historyHeader() : insightRows(IW)
928  const fullOverview = (() => {
929    // History's rows carry each run's result; a run's report shows beside them from 140 columns
930    if (layout === 'split' || isReading || isHistoryPage) return []
931    if (layout === 'compact') return overview(IW, 'compact')
932    // the whole report when the list keeps 10 rows; else its brief form; else three lines
933    const rowsLeft = (o: Row[]) => CH - 1 - 1 - (strip.length ? strip.length + 1 : 0) - 1 - 2 - (o.length + 1)
934    const full = overview(IW, 'full')
935    if (rowsLeft(full) >= 10) return full
936    const brief = overview(IW, 'brief')
937    return rowsLeft(brief) >= 8 ? brief : overview(IW, 'compact')
938  })()
939  const TOP = 1 + 1 + (strip.length ? strip.length + 1 : 0) + (fullOverview.length ? fullOverview.length + 1 : 0) + 1 // tabs, rule, insights + rule, overview + rule, caption
940  const BOTTOM = 2 // rule, keys
941  const bodyRows = Math.max(1, CH - TOP - BOTTOM)
942  const isSplit = layout === 'split' && (mode === 'agents' || mode === 'files' || mode === 'board' || mode === 'timeline')
943  const listW = isSplit ? LW : IW
944  const output = outRows(IW)
945  const comparison = compareRows(IW)
946  // the views that scroll as text, a page at a time
947  const isText = mode === 'output' || mode === 'compare' || mode === 'help'
948
949  // ── the board and the timeline: rows built at a width, cards placed on them ──
950  type Body = { rows: Row[]; cardRow: number[] }
951  const cursorSeg = (on: boolean) => seg(on ? T.cursor : ' ', C.accent)
952  const cell2 = (g: string, c?: string) => seg(padEnd(g, 2), c)
953  const emptyRows = (w: number): Row[] => [
954    { segs: [] },
955    { segs: [seg(' '), seg(isHistory ? T.words.emptyHistory : T.words.emptyLive, C.ink)] },
956    { segs: [] },
957    ...wrap(isHistory ? 'Finished subagents and workflows are kept here across sessions.' : T.words.emptyHint, w - 2).map(t => ({ segs: [seg(' '), seg(t, C.muted)] })),
958  ]
959  const cardMeta = (n: AgentNode): Seg[] => {
960    const quiet = quietFor(n)
961    if (n.status === 'running' && quiet >= 120_000) return [seg(`${T.warn} quiet ${duration(quiet)}`, C.warn)]
962    const rows = fileRows([n])
963    const added = rows.reduce((a, r) => a + r.added, 0)
964    const removed = rows.reduce((a, r) => a + r.removed, 0)
965    return [seg(duration(elapsed(n)), C.muted), ...(rows.length ? [seg('   '), seg(`+${added}`, C.add), seg(' '), seg(`−${removed}`, C.del)] : []),
966      ...(n.status === 'running' && n.activity ? [seg(`   ${n.activity}`, C.faint)] : [])]
967  }
968  const boardBody = (w: number): Body => {
969    const rows: Row[] = []
970    const cardRow: number[] = []
971    const gap = 2
972    const colW = Math.floor((w - gap * 2) / 3)
973    const narrow = colW < 22
974    const totals = COLUMNS.map((_, ci) => laneCells.reduce((a, cells) => a + cells[ci]!.length, 0))
975    rows.push({
976      segs: COLUMNS.flatMap((col, ci) => {
977        const color = col === 'running' ? T.status.running.color : col === 'done' ? T.status.done.color : T.status.failed.color
978        return [...(ci ? [seg(' '.repeat(gap))] : []), seg(padEnd(fit(`${COLUMN_NAMES[col][narrow ? 1 : 0]} ${totals[ci]}`, colW), colW), color, true)]
979      }),
980    })
981    if (!lanes.length) return { rows: [...rows, ...emptyRows(w)], cardRow }
982    let k = 0
983    lanes.forEach((lane, li) => {
984      const cells = laneCells[li]!
985      const c = counts(lane.cards)
986      const glyph = lane.kind === 'cluster' ? T.kind.group : lane.kind === 'workflow' ? T.kind.workflow : ''
987      rows.push({ segs: [] })
988      rows.push({ segs: [...(glyph ? [seg(`${glyph} `)] : []), seg(lane.title, C.ink, true), seg('   '), ...rollSegs(c, 6), seg(`  ${c.total - c.running}/${c.total}`, C.muted)] })
989      const idx = cells.map(list => list.slice(0, CARDS_PER_CELL).map(() => k++))
990      const depth = Math.min(CARDS_PER_CELL, Math.max(...cells.map(l => l.length)))
991      for (let r = 0; r < depth; r++) {
992        const line1: Seg[] = []
993        const line2: Seg[] = []
994        const hits: Hit[] = []
995        let x = 0
996        cells.forEach((list, ci) => {
997          if (ci) { line1.push(seg(' '.repeat(gap))); line2.push(seg(' '.repeat(gap))); x += gap }
998          const n = list[r]
999          if (!n) { line1.push(seg(' '.repeat(colW))); line2.push(seg(' '.repeat(colW))); x += colW; return }
1000          const at = idx[ci]![r]!
1001          const on = mode === 'board' && at === sel
1002          const bg = on ? C.selBg : undefined
1003          line1.push(...lay([cursorSeg(on), seg(statusIcon(n), T.status[n.status].color), seg(' '), seg(n.label, on ? C.ink : C.soft, on)], colW).map(sg => ({ ...sg, bg })))
1004          line2.push(...lay([seg('   '), ...cardMeta(n)], colW).map(sg => ({ ...sg, bg })))
1005          hits.push({ x0: x, x1: x + colW, act: () => pickCard(at) })
1006          cardRow[at] = rows.length
1007          x += colW
1008        })
1009        rows.push({ segs: line1, hit: hits })
1010        rows.push({ segs: line2, hit: hits })
1011      }
1012      const extra = cells.map(list => Math.max(0, list.length - CARDS_PER_CELL))
1013      if (extra.some(Boolean)) {
1014        rows.push({ segs: cells.flatMap((_, ci) => [...(ci ? [seg(' '.repeat(gap))] : []), seg(padEnd(extra[ci] ? `  +${extra[ci]} more` : '', colW), C.faint)]) })
1015      }
1016    })
1017    return { rows, cardRow }
1018  }
1019  const timeBody = (w: number): Body => {
1020    const rows: Row[] = []
1021    const cardRow: number[] = []
1022    if (!timeCards.length) return { rows: [{ segs: [] }, ...emptyRows(w)], cardRow }
1023    const labelW = Math.min(32, Math.max(16, Math.floor(w * 0.34)))
1024    const durW = 8
1025    const barW = Math.max(10, w - labelW - durW - 2)
1026    const t0 = Math.min(...timeCards.map(n => n.startedAt))
1027    const t1 = Math.max(t0 + 1000, ...timeCards.map(n => n.endedAt ?? now))
1028    const span = t1 - t0
1029    const xOf = (t: number) => Math.round(((t - t0) / span) * barW)
1030    // the ruler: times since the first start, spaced so labels never touch
1031    const ruler = new Array<string>(barW).fill(' ')
1032    const ticks = Math.max(1, Math.min(5, Math.floor(barW / 12)))
1033    for (let i = 0; i <= ticks; i++) {
1034      const label = offset((i / ticks) * span)
1035      const x = Math.round((i / ticks) * (barW - 1))
1036      const at = Math.max(0, Math.min(barW - label.length, i === ticks ? x - label.length + 1 : x))
1037      for (let j = 0; j < label.length; j++) ruler[at + j] = label[j]!
1038    }
1039    // left of the ruler, inside a run: how long the critical path took, and the idle share
1040    const pathNote = crit ? `━ critical ${duration(crit.ms)}${idle.ms && crit.span ? ` · idle ${Math.round((idle.ms / crit.span) * 100)}%` : ''}` : ''
1041    rows.push({ segs: [seg(padEnd(fit(pathNote, labelW), labelW), C.accent), seg(' '), seg(ruler.join(''), C.faint), seg(' '.repeat(durW + 1))] })
1042    // idle stretches shade every row with dots, as a column
1043    const idleAt = new Array<boolean>(barW).fill(false)
1044    for (const g of idle.gaps) for (let x = Math.max(0, xOf(g.from)); x < Math.min(barW, xOf(g.to)); x++) idleAt[x] = true
1045    let k = 0
1046    for (const r of timeRows) {
1047      if (r.kind === 'label') { rows.push({ segs: [seg('  '), seg(r.text, C.muted, true)] }); continue }
1048      const n = r.node
1049      const at = k++
1050      const on = mode === 'timeline' && at === sel
1051      const color = T.status[n.status].color
1052      const x0 = Math.min(barW - 1, xOf(n.startedAt))
1053      const x1 = Math.max(x0 + 1, Math.min(barW, xOf(n.endedAt ?? now)))
1054      const isLive = n.status === 'running'
1055      // with a critical path, its bars are heavy and the others light
1056      const isCrit = onPath.has(n.id)
1057      const line = !crit || isCrit ? '━' : '─'
1058      const quiet = quietFor(n)
1059      const flag = flags.get(n.id)
1060      const tag = isLive ? (quiet >= 120_000 ? ` quiet ${duration(quiet)}` : ' running') : flag ? ` ${flag.text}` : ''
1061      const tagShown = tag && barW - x1 >= cellWidth(tag) ? tag : ''
1062      const tagColor = isLive ? (quiet >= 120_000 ? C.warn : C.faint) : flag?.tone === 'warn' ? C.warn : C.faint
1063      // the bar's cells: idle dots, the bar, then its tag
1064      const cells: Seg[] = []
1065      const put = (t: string, c?: string) => { const last = cells[cells.length - 1]; if (last && last.c === c) last.t += t; else cells.push({ t, c }) }
1066      for (let x = 0; x < x0; x++) put(idleAt[x] ? '·' : ' ', idleAt[x] ? C.rule : undefined)
1067      put(isLive ? `${line.repeat(Math.max(0, x1 - x0 - 1))}▸` : line.repeat(x1 - x0), color)
1068      if (tagShown) put(tagShown, tagColor)
1069      for (let x = x1 + cellWidth(tagShown); x < barW; x++) put(idleAt[x] ? '·' : ' ', idleAt[x] ? C.rule : undefined)
1070      const label = lay([cursorSeg(on), seg(' '), cell2(statusIcon(n), color), seg(' '), seg(n.label, on || isLive || isCrit ? C.ink : C.soft, on || isCrit)], labelW)
1071      rows.push({
1072        bg: on ? C.selBg : undefined,
1073        segs: [...label, seg(' '), ...cells, seg(' '), seg(padStart(duration(elapsed(n)), durW), C.muted)],
1074        hit: [{ x0: 0, x1: w, act: () => pickCard(at) }],
1075      })
1076      cardRow[at] = rows.length - 1
1077    }
1078    return { rows, cardRow }
1079  }
1080
1081  // ── selection, scrolling ─────────────────────────────────────────────
1082  const isLens = mode === 'board' || mode === 'timeline'
1083  // the trace the hooks sent for this run at this zoom; its rows are a window of all of them
1084  // (cut to the lane asked for; while a search is typed the rows stay, and only the hits wait)
1085  const tq = s.tquery.trim().slice(0, 80)
1086  const tv: TraceView | undefined = mode === 'trace' && run && props.trace?.run === run.id && props.trace.zoom === s.zoom && (props.trace.lane ?? null) === s.traceLane ? props.trace : undefined
1087  // the rows n and p step through: the search's hits while there is a search, else what needs a look
1088  const traceStops = tv ? (tq ? (tv.query === tq ? tv.hits ?? [] : []) : tv.marks ?? []) : []
1089  // under the trace: two pinned rows above (legend, lanes), a rule and two detail rows below
1090  const traceWin = mode === 'trace' ? Math.max(1, bodyRows - 5) : 0
1091  const count = mode === 'agents' ? agentItems.length : mode === 'files' ? fileItems.length : mode === 'diff' ? blocks.length
1092    : mode === 'output' ? output.length : mode === 'compare' ? comparison.length : mode === 'help' ? KEYS_HELP_COUNT : isLens ? cards.length : mode === 'trace' ? tv?.total ?? 0 : 0
1093  const okRow = (i: number) => (mode === 'agents' ? isSelectable(agentItems[i]) : true)
1094  const rawSel = mode === 'agents' ? agentSel : isLens ? cardSel : s.sel
1095  const sel = isText ? 0 : Math.min(Math.max(0, rawSel), Math.max(0, count - 1))
1096  const body: Body | undefined = mode === 'board' ? boardBody(listW) : mode === 'timeline' ? timeBody(listW) : undefined
1097  // the diff scrolls by edit block, the selected one at the top; the board and the
1098  // timeline by rows under their pinned first row, keeping the selected card in sight
1099  let first = isText ? s.first : mode === 'diff' ? sel : Math.min(s.first, sel)
1100  if (body) {
1101    const win = Math.max(1, bodyRows - 1)
1102    const total = body.rows.length - 1
1103    const top = (body.cardRow[sel] ?? 1) - 1
1104    const tall = mode === 'board' ? 2 : 1
1105    first = Math.min(s.first, total)
1106    if (top < first) first = Math.max(0, top - (mode === 'board' ? 2 : 0))
1107    if (top + tall > first + win) first = top + tall - win
1108    first = Math.max(0, Math.min(first, Math.max(0, total - win)))
1109  } else {
1110    const win = mode === 'trace' ? traceWin : bodyRows
1111    if (!isText && mode !== 'diff' && sel >= first + win) first = sel - win + 1
1112    if (mode !== 'diff') first = Math.max(0, Math.min(first, Math.max(0, count - win)))
1113  }
1114
1115  // ── actions ──────────────────────────────────────────────────────────
1116  const set = (patch: Partial<State>) => surface.setState({ ...s, sel, first, ...patch })
1117  const toggleIn = (list: string[], key: string) => (list.includes(key) ? list.filter(k => k !== key) : [...list, key])
1118  const closeDiff = () => { surface.post({ type: 'diff', path: null }); return { diffFile: null } }
1119  const topOf = (n: AgentNode) => { let x = n; while (x.parentId) { const p = nodes.find(m => m.id === x.parentId); if (!p) break; x = p } return x }
1120  const cardsFor = (at: AgentNode | undefined, l: Lens) => {
1121    if (l === 'board') return boardLanes(at, nodes, topRuns, s.filter).flatMap(lane => COLUMNS.flatMap(col => lane.cards.filter(n => columnOf(n) === col).slice(0, CARDS_PER_CELL)))
1122    return timelineRows(at, nodes, topRuns, s.filter).flatMap(r => (r.kind === 'bar' ? [r.node] : []))
1123  }
1124  // where a key sits in a lens's list, so a selection survives a change of view
1125  const indexIn = (key: string | null, at: AgentNode | undefined, l: Lens, flipped = s.flipped, showDone = s.showDone): number => {
1126    // a trace comes back to the row it was left on
1127    if (l === 'trace') return s.traceAt
1128    if (!key) return -1
1129    if (l === 'tree') return listFor(flipped, showDone, at).findIndex(it => keyOf(it) === key)
1130    return cardsFor(at, l).findIndex(n => n.id === key)
1131  }
1132  const go = (v: ViewName, extra: Partial<State> = {}) => {
1133    if (!run || v === view) return
1134    const keep = inAgents ? { agentSel: sel, focus: focusKey } : {}
1135    const leaving = diffOpen ? closeDiff() : {}
1136    const back = v === 'agents' ? Math.max(0, indexIn(s.focus, run, lens)) : 0
1137    set({ ...keep, ...leaving, ...extra, view: v, sel: v === 'agents' ? (inAgents ? sel : back) : 0, first: 0 })
1138  }
1139  const openRun = (n: AgentNode, v: ViewName = 'agents', focus: string | null = null) =>
1140    set({ path: n.id, view: v, sel: v === 'agents' ? Math.max(0, indexIn(focus, n, lens)) : 0, first: 0, agentSel: 0, focus, diffFile: null })
1141  const openDiff = (path: string) => { surface.post({ type: 'diff', path }); set({ diffFile: path, sel: 0, first: 0 }) }
1142  // Opens what hides a node in a run's tree: its phase, the done agents folded
1143  // under it, and any parent that was closed.
1144  const reveal = (n: AgentNode, at: AgentNode) => {
1145    let flipped = [...s.flipped]
1146    let showDone = [...s.showDone]
1147    for (let x: AgentNode | undefined = nodes.find(m => m.id === n.parentId); x; x = nodes.find(m => m.id === x!.parentId)) {
1148      flipped = flipped.filter(k => k !== `o:${x.id}`)
1149      if (x.id === at.id) break
1150    }
1151    const wf = nodes.find(m => m.id === n.parentId && m.kind === 'workflow')
1152    if (wf && n.phase) {
1153      const key = `${wf.id}:${n.phase}`
1154      const phaseRow = listFor(flipped, showDone, at).find(it => it.kind === 'phase' && it.key === key)
1155      if (phaseRow?.kind === 'phase' && !phaseRow.isOpen) flipped = toggleIn(flipped, key)
1156      const shown = listFor(flipped, showDone, at).some(it => it.kind === 'node' && it.node.id === n.id)
1157      if (!shown && !showDone.includes(key)) showDone = [...showDone, key]
1158    }
1159    return { flipped, showDone }
1160  }
1161  // From a change, or an insight, to the agent it names, in the tree.
1162  const showInTree = (id: string, extra: Partial<State> = {}) => {
1163    const n = nodes.find(x => x.id === id)
1164    if (!n) return
1165    const at = topOf(n)
1166    if (!run && at.id === n.id && n.kind === 'agent') {
1167      const i = listFor(s.flipped, s.showDone, undefined).findIndex(it => it.kind === 'node' && it.node.id === id)
1168      return set({ ...extra, lens: 'tree', sel: Math.max(0, i) })
1169    }
1170    const { flipped, showDone } = reveal(n, at)
1171    const i = listFor(flipped, showDone, at).findIndex(it => it.kind === 'node' && it.node.id === id)
1172    if (diffOpen) surface.post({ type: 'diff', path: null })
1173    surface.setState({ ...s, ...extra, path: at.id, view: 'agents', lens: 'tree', diffFile: null, flipped, showDone, sel: Math.max(0, i), agentSel: Math.max(0, i), first: Math.max(0, i - 2) })
1174  }
1175  const jumpTo = (id: string | undefined, idx: number) => {
1176    if (!id) return set({ insight: idx })
1177    if (isLens && inAgents) {
1178      const i = cards.findIndex(c => c.id === id)
1179      if (i >= 0) return set({ sel: i, insight: idx })
1180    }
1181    showInTree(id, { insight: idx })
1182  }
1183  const toggleFold = (it: Item | undefined, open?: boolean) => {
1184    if (it?.kind === 'node' && it.fold && open !== it.fold.isOpen) return set({ flipped: toggleIn(s.flipped, it.fold.key) }), true
1185    if (it?.kind === 'phase' && open !== it.isOpen) return set({ flipped: toggleIn(s.flipped, it.key) }), true
1186    if (it?.kind === 'more' && open !== false) return set({ showDone: toggleIn(s.showDone, it.key) }), true
1187    return false
1188  }
1189  const activateCard = (i: number) => {
1190    const n = cards[i]
1191    if (!n) return
1192    if (!run) return openRun(topOf(n), 'agents', n.id)
1193    set({ agentSel: i, focus: n.id, view: 'output', sel: 0, first: 0 })
1194  }
1195  const pickCard = (i: number) => (i === sel ? activateCard(i) : set({ sel: i }))
1196  // a trace row, when the window the hooks sent holds it
1197  const traceRow = (i: number): TraceRow | undefined => (tv && i >= tv.offset && i < tv.offset + tv.rows.length ? tv.rows[i - tv.offset] : undefined)
1198  const laneId = (r: TraceRow | undefined) => (r && tv ? tv.lanes[r.lane]?.id : undefined)
1199  // Enter on a trace row: an edit opens its diff; any other row shows its agent in the tree
1200  const activateTrace = (i: number) => {
hooks/desktop/sprites.ts 701 lines
1// Pixel art for the desktop view: one set per playful theme, each a palette and text
2// grids ("." is clear), drawn as SVG squares with crisp edges. Every set fills the
3// same slots, so the view asks for "done" or "workflow" and each theme answers with
4// its own picture: kitty's cats, fish on lines, dogs on walks. Each state reads by
5// its outline at 16 px; failed and quiet lie down where the sprite has a body to lay.
6export const SLOTS = ['walk0', 'walk1', 'walk2', 'walk3', 'done', 'failed', 'stopped', 'quiet', 'workflow', 'group', 'scene'] as const
7export type Slot = typeof SLOTS[number]
8export type ArtSet = { pal: Record<string, string>; pix: Record<Slot, readonly string[]> }
9export type ArtName = 'kitty' | 'fish' | 'dog'
10
11// Cats: generated from the approved mockup's pixel data; workflow is yarn, a cluster a pile.
12const KITTY: ArtSet = {
13  pal: {"o": "#2e1f2b", "a": "#ffd09a", "b": "#f59a4f", "c": "#c96a2e", "d": "#a8522a", "H": "#d5dae3", "G": "#9fa8ba", "I": "#6e778b", "M": "#86799e", "N": "#5a4d70", "n": "#3f3550", "w": "#fff6ea", "x": "#e3cdb8", "p": "#f4899a", "q": "#d9667b", "g": "#ffffff", "z": "#8fb0f0", "Z": "#5f86d8", "B": "#f6eedc", "C": "#d8cbb0", "R": "#e5485a", "T": "#7cc8f4", "l": "#ffb3c0", "y": "#ec6a80", "Y": "#b94860", "L": "#bdb6d3", "K": "#8e87a9", "k": "#5a5373", "s": "#3a3449", "r": "#ffcf4d"},
14  pix: {
15    walk0: [
16      '................',
17      '.........o....o.',
18      '........oco..oco',
19      '.o......opoooapo',
20      'oco.....oabaaaco',
21      'oco.....oabbbgco',
22      'oao..ooooabbboco',
23      'oabooadadabbwxpo',
24      '.obbdabbbbbcxxo.',
25      '..obbbbbbbbcoo..',
26      '..oabbbbbcbco...',
27      '..occbcbbcoco...',
28      '..ocoococcooco..',
29      '.oco..occo.oco..',
30      '..w....ww...ow..',
31      '................',
32    ],
33    walk1: [
34      '..............o.',
35      '.........o...oco',
36      '........oaooooco',
37      '.o......opbaaapo',
38      'oco.....oabbbgco',
39      'oco.....oabbboco',
40      'oao.oooooabbbwpo',
41      'oaboaadadabcxxxo',
42      '.obbdbbbbbbcooo.',
43      '..obbbbbbbbco...',
44      '...ocbbbbbbco...',
45      '...ococccbbco...',
46      '...ococooobco...',
47      '...ococo.occo...',
48      '....w.w...ww....',
49      '................',
50    ],
51    walk2: [
52      '................',
53      '.........o....o.',
54      '........oco..oco',
55      '.o......opoooapo',
56      'oco.....oabaaaco',
57      'oco.....oabbbgco',
58      'oao..ooooabbboco',
59      'oabooadadabbwxpo',
60      '.obbdabbbbbcxxo.',
61      '..obbbbbbbbcoo..',
62      '..oabbbbbbcco...',
63      '...obccccbco....',
64      '...oacoooobo....',
65      '...occo..occo...',
66      '....ww....ww....',
67      '................',
68    ],
69    walk3: [
70      '..............o.',
71      '.........o...oco',
72      '........oaooooco',
73      '.o......opbaaapo',
74      'oco.....oabbbgco',
75      'oco.....oabbboco',
76      'oao.oooooabbbwpo',
77      'oaboaadadabcxxxo',
78      '.obbdbbbbbbcooo.',
79      '..obbbbbbbbco...',
80      '...ocbbbbcbco...',
81      '...ococcbcoco...',
82      '...ococoococo...',
83      '...ococoococo...',
84      '....w.w..w.ow...',
85      '................',
86    ],
87    done: [
88      '..o.......o.....',
89      '.oao.....oco....',
90      '.oapooooopco....',
91      '.oabbadaaaco....',
92      '.oabbbddbbco....',
93      '.oabbbbbbbco....',
94      '.oabobbbobco..o.',
95      '.oaobobobobo.oco',
96      '..obwwpwwbbbooco',
97      '...obowobbbdboco',
98      '....obbbbbbbdbco',
99      '....oabobbbbbbco',
100      '....owwbwwbbbcco',
101      '....owwbwwbccco.',
102      '....oxxcxxccoo..',
103      '.....ooooooo....',
104    ],
105    failed: [
106      '................',
107      '................',
108      '................',
109      '................',
110      '................',
111      '..o.....o.......',
112      '.oao...oco......',
113      '.oaBCBoaao......',
114      '.oapRCapbbooo...',
115      '.oabBbbbbbdado..',
116      '.oabbbbdbbbbbbo.',
117      '.ooobboobbbbbbco',
118      '..obbpbbbbbbbcco',
119      '.ToccbbbbccccccT',
120      'TT.occdccdccdc..',
121      '.......oooo.....',
122    ],
123    stopped: [
124      '.r..............',
125      '.roo.....oo...o.',
126      '.oaaoooooaco.oao',
127      '.rapbaaaaapooacc',
128      '.oabbbbbbbcooaco',
129      '.oabbbbbbbcooaco',
130      '.oabgbbbgbcooaco',
131      '.oabobbbobbooaco',
132      '.oabbwpwbbbbacco',
133      '..obwwpwwbbbbco.',
134      '...obbobbbbbbco.',
135      '...oabbbbbbbbco.',
136      '...owwbbbwwbcco.',
137      '...owxbbbwwcco..',
138      '...oxxoccxxco...',
139      '....oo.ooooo....',
140    ],
141    quiet: [
142      '................',
143      '..........zzz...',
144      '............z...',
145      '...........z....',
146      '..........zzz.ZZ',
147      '..o.....o......Z',
148      '.oao...oco....ZZ',
149      '.oaboooaao......',
150      '.oapbaapbbooo...',
151      '.oabbbbbbbdado..',
152      '.oabbbbdbbbbbbo.',
153      '.ooobboobbbbbbco',
154      '..obbpbbbbbbbcco',
155      '...occbbbbccccc.',
156      '...occdccdccdc..',
157      '.......oooo.....',
158    ],
159    workflow: [
160      '................',
161      '.....ooooo......',
162      '....olllllo.....',
163      '...ollyylyyo....',
164      '..ollyylyyyyo...',
165      '.ollyylyyylyYo..',
166      '.olyylyyylyyYo..',
167      '.olylyyylyyyYo..',
168      '.olyyyylyyyYYo..',
169      '.olyyylyyyYyYo..',
170      '.olyyyyyyYyYYo..',
171      '..oyYyyyYyYYo...',
172      '...oyYyYyYYo....',
173      '....oYYYYYo.yy..',
174      '.....ooooo....yy',
175      '................',
176    ],
177    group: [
178      '................',
179      '.o...o....o...o.',
180      'oHoooIo..oMooono',
181      'opGHHpo..opNMMpo',
182      'oHGGGGo..orNNNro',
183      'oHooGooooMoNNNoo',
184      'oHGGpIo..oNNpnno',
185      '.oIIIoo..oonnno.',
186      '..oooaoooocooo..',
187      '....oabaaaco....',
188      '....oabbbbbo....',
189      '...oaaobbboco...',
190      '...oaobobocoo...',
191      '....ocwwpxco....',
192      '.....ooccoo.....',
193      '.......oo.......',
194    ],
195    scene: [
196      '.....................................................ZZZZZ......',
197      '........................................................Z.......',
198      '.......................................................Z........',
199      '......................................................Z.........',
200      '.....................................................ZZZZZ......',
201      '................................................................',
202      '................................................ZZZZ............',
203      '..................................................Z.............',
204      '.................................................Z..............',
205      '................................................ZZZZ............',
206      '................................................................',
207      '..............o...........o.................zzz.................',
208      '.............oapoo.....oopco.................z..................',
209      '.............oappaoooooappco................zzz.................',
210      '.............oabbbbaaaaabbco.oooooooooo.........................',
211      '.............oabbbbbbbbbbbbooaadaadaaaaooo......................',
212      '.............oabbbbbbbbbbbbbaadbbbbdbbdbaaooo...................',
213      '.............oabbbbbbbbbbbbbbbbbbbbbbbbdbbbaao..................',
214      '............oaabbbbbbbbbbbbbbbbdbbbdbbbbbbdbbco.................',
215      '............oabobbbbbbbbbobbbbbbbbbbbbbbbbbbbbco................',
216      '............oabbooobbbooobbbbbbbbbbbbbbbbbbbbcco................',
217      '.............obbbbwwwwwbbbbbbbbbbbbbbbbbbbbbbbcco...............',
218      '.............ocbbwwwpwwwbbbbbbbbbbbbbbbbbbbbbbco................',
219      '..............ocbwwowowwbbbbbbbbbbbbbbbbbbbbbbcco...............',
220      '...............oobwwwwwbbbbbbbbbbbbbbbbbbbbbcccco...............',
221      '................oabbbbbbbbbbbbbbbbbbbbbbbccccccco...............',
222      '......oooooooooocccbbbbbbbbbbbbbbbbbbbbcccccccoooooooooooo......',
223      '.....oLLLLLLLLLLoccccccccccccccccccccccccccoooLLLLLLLLLLLLo.....',
224      '....oLLKKKKKKKKKKoococdcccccdcccccdcccccdoocKKKKKKKKKKKKKKko....',
225      '....oLKKKLLkKLLkKLLkKooooooooooooooooooooLLkKLLkKLLkKLLkKKKo....',
226      '...oLLKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKko...',
227      '...oLKKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKKo...',
228      '..oLLKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKko..',
229      '..oLKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKLLkKo..',
230      '.okkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkko.',
231      '..oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo..',
232      '...sssssssssssssssssssssssssssssssssssssssssssssssssssssssssss..',
233      '................................................................',
234      '................................................................',
235      '................................................................',
236    ],
237  },
238}
239
240// Fish: swimming, caught on the line, bones (it got away), a bobber (line reeled in),
241// asleep with bubbles; a rowboat for a workflow, a school for a cluster; a night lake.
242const FISH: ArtSet = {
243  pal: {"o": "#1d2b3a", "b": "#3f9fd6", "c": "#2a78ad", "a": "#c4e8f8", "f": "#f29b38", "d": "#c9701f", "g": "#ffffff", "z": "#bfe8ff", "Z": "#6fb7e6", "h": "#b8c0c9", "l": "#8c96a3", "r": "#e5484d", "w": "#fff6ea", "x": "#e0d2c0", "W": "#a8703f", "V": "#6e4424", "B": "#f3ead8", "S": "#4a8fc2", "s": "#2f6c9e", "k": "#d6f0ff", "y": "#ffcf4d", "Y": "#f0a830"},
244  pix: {
245    walk0: [
246      '..............Z.',
247      '................',
248      '...............z',
249      '........oooo....',
250      '.......offffo...',
251      '.....ooobbbboo..',
252      'oo..obbbcbbbbbo.',
253      'ofo.obbcbbbbgobo',
254      'offoobbcbbbbbbbo',
255      'offoobbcbbbbbboo',
256      'ofo.oaacaaaaaao.',
257      'oo...oaaaaaaoo..',
258      '......offoooo...',
259      '.......oo.......',
260      '................',
261      '................',
262    ],
263    walk1: [
264      '.............z..',
265      '...............z',
266      '................',
267      '........oooo....',
268      '.......offffo...',
269      'o....ooobbbboo..',
270      'ofo.obbbcbbbbbo.',
271      'offoobbcbbbbgobo',
272      'offfobbcbbbbbbbo',
273      '.oooobbcbbbbbboo',
274      '....oaacaaaaaao.',
275      '.....oaaaaaaoo..',
276      '......offoooo...',
277      '.......oo.......',
278      '................',
279      '................',
280    ],
281    walk2: [
282      '...............Z',
283      '................',
284      '..............z.',
285      '........oooo....',
286      '.......offffo...',
287      '.....ooobbbboo..',
288      'oo..obbbcbbbbbo.',
289      'ofo.obbcbbbbgobo',
290      'offoobbcbbbbbbbo',
291      'offoobbcbbbbbboo',
292      'ofo.oaacaaaaaao.',
293      'oo...oaaaaaaoo..',
294      '......offoooo...',
295      '.......oo.......',
296      '................',
297      '................',
298    ],
299    walk3: [
300      '...............z',
301      '..............z.',
302      '................',
303      '........oooo....',
304      '.......offffo...',
305      '.....ooobbbboo..',
306      '....obbbcbbbbbo.',
307      '....obbcbbbbgobo',
308      '.oooobbcbbbbbbbo',
309      'offfobbcbbbbbboo',
310      'offooaacaaaaaao.',
311      'ofo..oaaaaaaoo..',
312      'o.....offoooo...',
313      '.......oo.......',
314      '................',
315      '................',
316    ],
317    done: [
318      '...............l',
319      '...y...........l',
320      '..yYy..........l',
321      '...y...........l',
322      '...............l',
323      '........oooo...l',
324      '.......offffo..l',
325      'o....ooobbbboo.l',
326      'ofo.obbbcbbbbbol',
327      'offoobbcbbbbgobh',
328      'offfobbcbbbbbbbh',
329      '.oooobbcbbbbbboo',
330      '....oaacaaaaaao.',
331      '.....oaaaaaaoo..',
332      '......offoooo...',
333      '.......oo.......',
334    ],
335    failed: [
336      '................',
337      '................',
338      '................',
339      '...o.o.o..oooo..',
340      'o.oBoBoBo.oBBBo.',
341      'BooBoBoBooBBBBBo',
342      'BBoBoBoBooBoBBBo',
343      'BBBBBBBBBBBBBBBo',
344      'BBoBoBoBooBBBBBo',
345      'BooBoBoBooBBBBo.',
346      'o.oBoBoBo.oBBo..',
347      '...o.o.o..ooo...',
348      '................',
349      '................',
350      '................',
351      '................',
352    ],
353    stopped: [
354      '................',
355      '.......o........',
356      '.......o........',
357      '......ooo.......',
358      '.....orrro......',
359      '....orgrrro.....',
360      '....orrrrro.....',
361      '....orrrrro.....',
362      '....owwwwwo.....',
363      '....owwwwxo.....',
364      '.....owwxo......',
365      '.kk...ooo...kk..',
366      'kSSkkSSSSSkkSSkk',
367      'SSSSSSSSSSSSSSSS',
368      'SsSSSSsSSSSSsSSS',
369      '................',
370    ],
371    quiet: [
372      '............ZZZ.',
373      '..............Z.',
374      '..........Z..Z..',
375      '............ZZZ.',
376      '................',
377      '........oooo....',
378      '.......offffo...',
379      '.....ooobbbboo..',
380      'oo..obbbcbbbbbo.',
381      'ofo.obbcbbbooobo',
382      'offoobbcbbbbbbbo',
383      'offoobbcbbbbbboo',
384      'ofo.oaacaaaaaao.',
385      'oo...oaaaaaaoo..',
386      '......offoooo...',
387      '.......oo.......',
388    ],
389    workflow: [
390      '................',
391      '.............W..',
392      '............W..l',
393      '...........W...l',
394      '..........W....l',
395      '..........W....l',
396      '.........W.....l',
397      '........W......l',
398      '.......W.......l',
399      'ooooooWooooooo.r',
400      '.oWWWWWWWWWWo..w',
401      '..oVVVVVVVVo....',
402      '...oooooooo.....',
403      '.kk..k...kk...kk',
404      'SSSSSSSSSSSSSSSS',
405      'SsSSSSSsSSSSSsSS',
406    ],
407    group: [
408      '................',
409      '..........ooo...',
410      '........oobbobo.',
411      '........obbbbbo.',
412      '........ooaaao..',
413      '..........ooo...',
414      '...ooo..........',
415      '.ooffofo........',
416      '.offfffo........',
417      '.ooyyyo.........',
418      '...ooo....ooo...',
419      '........oobbobo.',
420      '........obbbbbo.',
421      '........ooaaao..',
422      '..........ooo...',
423      '................',
424    ],
425    scene: [
426      '................................................................',
427      '..............................y.................................',
428      '......yyy...............................................y.......',
429      '.....yy.............y...........................................',
430      '....yy......................................y...................',
431      '....yy..............................W...........................',
432      '....yy............................WW.l..........................',
433      '.....yy.........................WW...l..........................',
434      '......yyy......................W.....ly.........................',
435      '.............................WW......l......................y...',
436      '..............y............WW........l..........................',
437      '..........................W..........l..........................',
438      '........................WW............l.........................',
439      '......................WW..............l.................ZZZZ....',
440      '....................WW................l...................Z.....',
441      '...................W..................l..................Z......',
442      '.................WW...................l.................ZZZZ....',
443      '...............WW.....................l.........................',
444      '.............VV........................l............ZZZ.........',
445      'oooooooooooooooooooooo.................o..............Z.........',
446      'WWWWWWWWWWWWWWWWWWWWWW................ooo............Z..........',
447      'VVVVVVVVVVVVVVVVVVVVVV................oro...........ZZZ.........',
448      'oooooooooooooooooooooo................owo.......................',
449      'kkSVWSkkSSSSkkSSSVWkSSSSkkSSSSkkSSSSkk.o.SkkSSSSkkSSSSkkzSSSkkSS',
450      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSooooSSSSSSSSSS',
451      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSoffffozSSSSSSSS',
452      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSSSSSSooobbbbooSSSSSSSS',
453      'SSSVWSSSSSSSkSSSSVWSSkSSSSSSSSkSSSSSSSSkSSooSSobbbcbbbbbokSSSSSS',
454      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSofoSobbcbbboooboSSSSSS',
455      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSoffoobbcbbbbbbboSSSSSS',
456      'SSSVWSSSSSSSSSSSSVWSSSSSSSSSSSSSSSSSSSSSSSoffoobbcbbbbbbooSSSSSS',
457      'SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSofoSoaacaaaaaaoSSSSSSS',
458      'ssssssssssssssssssssssssssssssssssssssssssoosssoaaaaaaoossssssss',
459      'ssssssssssssssssssssssssssssssssssssssssssssssssoffoooosssssssss',
460      'sssssssssssssssssssssssssssssssssssssssssssssssssoosssssssssssss',
461      'ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss',
462      'ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss',
463      'ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss',
464      'ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss',
465      'ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss',
466    ],
467  },
468}
469
470// Dogs: trotting, a happy sit, lying down with a tear, told to sit, asleep; a tennis
471// ball for a workflow, the pack's paw print for a cluster; asleep by the dog house.
472const DOG: ArtSet = {
473  pal: {"o": "#2e1f1b", "b": "#d99a52", "a": "#f2c98e", "c": "#a8662f", "d": "#7a4520", "w": "#fff6ea", "x": "#e3cdb8", "p": "#f4899a", "r": "#e5484d", "y": "#ffcf4d", "T": "#c8e04a", "U": "#94ad28", "g": "#ffffff", "z": "#8fb0f0", "Z": "#5f86d8", "R": "#c2413b", "Q": "#8f2b27", "W": "#c08850", "V": "#8a5a30", "k": "#3a2a24", "G": "#6bb34a", "F": "#4d8c35", "L": "#bdb6d3", "K": "#8e87a9"},
474  pix: {
475    walk0: [
476      '................',
477      '.........ooo....',
478      '........obbbo...',
479      '.......odbbbboo.',
480      '.......oddbobbbo',
481      'oo.....oddbbbwwo',
482      'obo.....odbbwwoo',
483      'oo.ooooooobbwpo.',
484      'obooabbbborrry..',
485      '.obbbbbbbbbbwo..',
486      '..obbbbbbbbbwo..',
487      '..obbbbbbbbbo...',
488      '..obco..obco....',
489      '..oco...oco.....',
490      '..ow.....ow.....',
491      '................',
492    ],
493    walk1: [
494      '................',
495      '.........ooo....',
496      '........obbbo...',
497      '.......odbbbboo.',
498      '.......oddbobbbo',
499      '.oo....oddbbbwwo',
500      'obo.....odbbwwoo',
501      'oo.ooooooobbwpo.',
502      'obooabbbborrry..',
503      '.obbbbbbbbbbwo..',
504      '..obbbbbbbbbwo..',
505      '..obbbbbbbbbo...',
506      '...obco.obco....',
507      '....oco.oco.....',
508      '....ow..ow......',
509      '................',
510    ],
511    walk2: [
512      '................',
513      '.........ooo....',
514      '........obbbo...',
515      '.......odbbbboo.',
516      '.......oddbobbbo',
517      'oo.....oddbbbwwo',
518      'obo.....odbbwwoo',
519      'oo.ooooooobbwpo.',
520      'obooabbbborrry..',
521      '.obbbbbbbbbbwo..',
522      '..obbbbbbbbbwo..',
523      '..obbbbbbbbbo...',
524      '.obco....obco...',
525      'oco......oco....',
526      'ow........ow....',
527      '................',
528    ],
529    walk3: [
530      '................',
531      '.........ooo....',
532      '........obbbo...',
533      '.......odbbbboo.',
534      '.......oddbobbbo',
535      'o......oddbbbwwo',
536      'ob......odbbwwoo',
537      'oo.ooooooobbwpo.',
538      'obooabbbborrry..',
539      '.obbbbbbbbbbwo..',
540      '..obbbbbbbbbwo..',
541      '..obbbbbbbbbo...',
542      '...obco.obco....',
543      '...oco..oco.....',
544      '...ow...ow......',
545      '................',
546    ],
547    done: [
548      '..oo........oo..',
549      '.oddo......oddo.',
550      '.oddooooooooddoo',
551      '.oddbbbbbbbbddo.',
552      '.odbbobbbbobbdo.',
553      '..obbobbbbobbo..',
554      '..obbbbwwbbbbo..',
555      '...obbwoowbbo...',
556      '...obbwwwwbbo...',
557      '....orrpprro....',
558      '...obbwppwbbo...',
559      '..obbbwwwwbbbo..',
560      '..obbbwwwwbbbo..',
561      '..obobwwwwbobo..',
562      '..owwbbbbbbwwo..',
563      '...oooooooooo...',
564    ],
565    failed: [
566      '................',
567      '................',
568      '................',
569      '................',
570      '................',
571      '................',
572      '..........oooo..',
573      '.........obbbbo.',
574      '........oddbbbbo',
575      '.oo.....oddboobo',
576      'obooooooodbzbwwo',
577      '.obbbbbbbbbzbwoo',
578      '.obbbbbbbbbbbwo.',
579      '.owbbbbbbbbbbwwo',
580      'oowwooooooooowwo',
581      '.oo.......z.ooo.',
582    ],
583    stopped: [
584      '.........ooo....',
585      '........obbbo...',
586      '.......odbbbboo.',
587      '.......oddbobbbo',
588      '.......oddbbbwwo',
589      '........odbbwwoo',
590      '........obbbwwo.',
591      '........orrryo..',
592      '.......obbbbwo..',
593      '......obbbbbwo..',
594      '.....obbbbbbwo..',
595      'oo..obbbbbbbwo..',
596      'obooobbbbbbbo...',
597      '.obbbbbcbbbco...',
598      '..obbbcowwcwwo..',
599      '...ooooooooooo..',
600    ],
601    quiet: [
602      '...........ZZZZ.',
603      '.............Z..',
604      '.......ZZZ..Z...',
605      '.........Z.ZZZZ.',
606      '........Z.......',
607      '.......ZZZ......',
608      '..........oooo..',
609      '.........obbbbo.',
610      '........oddbbbbo',
611      '.oo.....oddboobo',
612      'obooooooodbbbwwo',
613      '.obbbbbbbbbbbwoo',
614      '.obbbbbbbbbbbwo.',
615      '.owbbbbbbbbbbwwo',
616      'oowwooooooooowwo',
617      '.oo.........ooo.',
618    ],
619    workflow: [
620      '................',
621      '.....oooooo.....',
622      '...ooTTTTTToo...',
623      '..oTTgTTTTTTTo..',
624      '..oTggTTTTTTTo..',
625      '.oTTTggTTTTTTUo.',
626      '.oTTTTggTTTTTUo.',
627      '.oTTTTTgggTTTUo.',
628      '.oTTTTTTTTggTUo.',
629      '.oTTTTTTTTTTgUo.',
630      '.oTTTTTTTTTTggo.',
631      '..oTTTTTTTTTUo..',
632      '..oUTTTTTTTUUo..',
633      '...ooUUUUUUoo...',
634      '.....oooooo.....',
635      '................',
636    ],
637    group: [
638      '................',
639      '.....oo...oo....',
640      '....obbo.obbo...',
641      '....obbo.obbo...',
642      '.oo..oo...oo.oo.',
643      'obbo.........obo',
644      'obbo..oooo...obo',
645      '.oo..obbbbo...o.',
646      '....obbbbbbo....',
647      '...obbbbbbbbo...',
648      '...obbbbbbbbo...',
649      '...obbbbbbbbo...',
650      '....obbooobbo...',
651      '.....oo...oo....',
652      '................',
653      '................',
654    ],
655    scene: [
656      '................................................................',
657      '................................................................',
658      '................................................................',
659      '........................oQQQQo..................................',
660      '......................oRRRRRRRRo................................',
661      '....................oRRRRRRRRRRRRo..............................',
662      '..................oRRRRRRRRRRRRRRRRo............................',
663      '................oRRRRRRRRRRRRRRRRRRRRo..........................',
664      '..............oRRRRRRRRRRRRRRRRRRRRRRRRo........................',
665      '............oRRRRRRRRRRRRRRRRRRRRRRRRRRRRo......................',
666      '..........oRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRo....................',
667      '........oRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRo..................',
668      '......oRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRo................',
669      '....QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQZZZZ............',
670      '.......oWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWo...Z.............',
671      '.......oVVVVVVVVVVVVVVVVVoooVVVVVVVVVVVVVVVVVVo..Z..............',
672      '.......oWWWWWWWWWWWWWWWWWoyoWWWWWWWWWWWWWWWWWWo.ZZZZ............',
673      '.......oWWWWWWWWWWWWWWWWWoooWWWWWWWWWWWWWWWWZZZ.................',
674      '.......oVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVZ.................',
675      '.......oWWWWWWWWWWWWWWkkkkkkkkkkWWWWWWWWWWWWWZo.................',
676      '.......oWWWWWWWWWWWWWWkkkkkkkkkkWWWWWWWWWWWWZZZ.................',
677      '.......oVVVVVVVVVVVVkkkkkkkkkkkkkkVVVVVVVVVVVVo.................',
678      '.......oWWWWWWWWWWWWkkkkkkkkkkkkkkWWWWWWWWWoooo.................',
679      '.......oWWWWWWWWWWWWkkkkkkkkkkkkkkWWWWWWWWobbbbo................',
680      '.......oVVVVVVVVVVVVkkkkkkkkkkkkkkVVVVVVVoddbbbbo...............',
681      '.......oWWWWWWWWWWWWkkkkkkkkkkkkkkooWWWWWoddboobo...............',
682      '.......oWWWWWWWWWWWWkkkkkkkkkkkkkobooooooodbbbwwo...............',
683      '.......oVVVVVVVVVVVVkkkkkkkkkkkkkkobbbbbbbbbbbwoo......ooo......',
684      '........oooooo..WWWWkkkkkkkkkkkkkkobbbbbbbbbbbwo......oTTTo.....',
685      '.......oLLLLLLo.WWWWkkkkkkkkkkkkkkowbbbbbbbbbbwwo.....oTgTo.....',
686      '..G....oKKKKKKo.VVVVkkkkkkkkkkkkkoowwooooooooowwo...G.oUUUo...G.',
687      '.G......oooooo..WWWWkkkkkkkkkkkkkkooWWWWWWWWWooo...G...ooo...G..',
688      'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG',
689      'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG',
690      'GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG',
691      'FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF',
692      'FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF',
693      'FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF',
694      'FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF',
695      'FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF',
696    ],
697  },
698}
699
700export const ART: Record<ArtName, ArtSet> = { kitty: KITTY, fish: FISH, dog: DOG }
701